| Class A | Open | 6C | Apr 27, 2026 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 6C | Apr 27, 2026 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 6C | Apr 27, 2026 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT IN CLOSET AT SOUTH AND WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 6C | Apr 15, 2026 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LEES THAN 10 SQ FT AT CEILING AND EAST WALL OF 1ST CLOSET AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Open | 5B | Mar 3, 2026 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 5B, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 5B | Mar 3, 2026 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE FOYER LOCATED AT APT 5B, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 6C | Mar 2, 2026 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 6C | Mar 2, 2026 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE KITCHEN LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Open | — | Mar 2, 2026 | RENT STABILIZATION LAW INFORMATION SIGN · POSTING/SIGNAGE§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMATION/REQUIRED-SIGNAGE.PAGE |
| Class A | Open | 6C | Mar 2, 2026 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE KITCHEN LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Open | 6C | Mar 2, 2026 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CELING INSIDE CLOSET AT SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 6C | Dec 15, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING AND NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 6C | Sep 15, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 6C | Aug 29, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE KITCHEN LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | — | Aug 29, 2025 | SECURE LOOSE MATTER · MAINTENANCE§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE MAILBOXES AT NORTH WALL AT PUBLIC HALL, 1st STORY |
| Class A | Closed | — | May 27, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AT BULKHEAD AT PUBLIC HALL, 6th STORY |
| Class A | Open | 6C | Jan 22, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST, THE 1st ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 6C | Jan 22, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 5B | Nov 27, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQFT AT CEILING AND WEST WALL CEILING IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3B | Nov 8, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Open | 6C | May 14, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST, THE KITCHEN , THE 4th ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 6C | May 14, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 4 SQ FT AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 5B | May 13, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST, THE BATHROOM , THE 2nd ROOM FROM EAST LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 6C | Oct 10, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 6C | Oct 10, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE ENTRANCE LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 6C | Oct 10, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL WALL IN THE PRIVATE HALLWAY LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | — | Sep 25, 2023 | PAINT METAL · PAINTING§ 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL STORIES, ALL BALCONIES AND ALL COMPONETS AT WEST STACK BUILDING WEST |
| Class A | Open | 6C | Feb 16, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST, THE PRIVATE HALLWAY LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 6C | Nov 4, 2022 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DOOR FROM SOUTH AT WEST WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 6C | Nov 4, 2022 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | — | Sep 16, 2022 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 6th STORY |
| Class A | Closed | — | Aug 30, 2021 | POST REGISTRATION SIGN · ANNUAL PROPERTY REGISTRATION§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 6E | Jul 28, 2021 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 2B | Apr 17, 2014 | PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS , ALL WALLS AND TRIM THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 6C | Dec 19, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS & CEILING, IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 2F | Oct 4, 2012 | PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 5th ROOM FROM NORTH, THE FOYER LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 3B | Jul 11, 2008 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |