| Class B | OpenRENT IMPAIRING | 6D | Apr 16, 2026 | LEAKY ROOF · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING IN THE 6th ROOM FROM NORTH LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class B | Open | 6D | Apr 16, 2026 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class B | Open | 6D | Apr 16, 2026 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 6th ROOM FROM NORTH LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class C | Open | 6E | Jul 17, 2025 | MAKE DOORS SELF-CLOSING · EGRESS§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 3C | Jun 27, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM NORTH AT WEST, THE BATHROOM , THE 2nd ROOM FROM NORTH LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class C | Open | 3C | Jun 16, 2025 | ABATE THE NUISANCE OF MICE · EXTERMINATION & RODENT ERADICATIONHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | — | May 28, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH WALL AT BULKHEAD DOOR , 6th STORY, SECTION AT SOUTH |
| Class B | Open | 2C | May 28, 2025 | REPAIR LEAKY FAUCETS · WATER SUPPLY§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Class A | Open | — | May 28, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT BULKHEAD , 6th STORY, SECTION AT NORTH |
| Class B | Open | 2C | May 28, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE RUBBER GASKET AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Class C | Open | 2C | May 28, 2025 | ABATE THE NUISANCE OF ROACHES · EXTERMINATION & RODENT ERADICATIONHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Class B | Open | 2C | May 28, 2025 | REPAIR LEAKY FAUCETS · WATER SUPPLY§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Class B | Open | — | May 28, 2025 | PROVIDE · MAINTENANCE§ 27-2005 ADM CODE PROVIDE OPERABLE DOOR KNOB AT BULKHEAD DOOR ALLOWING FOR RE-ENTRY , 6th STORY, SECTION AT SOUTH |
| Class B | OpenRENT IMPAIRING | — | May 28, 2025 | LEAKY ROOF · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING AT BULKHEAD , 6th STORY, SECTION AT NORTH |
| Class C | OpenRENT IMPAIRING | — | May 28, 2025 | REMOVE ILLEGAL FASTENING · EGRESS§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING PUSH BAR AT BULKHEAD DOOR , 6th STORY, SECTION AT NORTH |
| Class A | Open | 2C | May 28, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Class B | Open | — | May 28, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT BULKHEAD , 6th STORY, SECTION AT NORTH |
| Class B | Open | 2C | May 28, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Class B | Open | — | May 28, 2025 | PROVIDE · MAINTENANCE§ 27-2005 ADM CODE PROVIDE DOOR HANDLE AT BULKHEAD DOOR , 6th STORY, SECTION AT NORTH |
| Class B | OpenRENT IMPAIRING | 2C | May 28, 2025 | REPLACE DEFECTIVE SINK, WATER CLOSET, WASH TUB · SEWERS AND DRAINAGE§ 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WASHBASIN IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Class B | OpenRENT IMPAIRING | 6K | May 12, 2025 | LEAKY ROOF · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH |
| Class B | Open | 6K | May 12, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH |
| Class B | OpenRENT IMPAIRING | 6K | May 12, 2025 | LEAKY ROOF · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH |
| Class B | OpenRENT IMPAIRING | 6D | May 9, 2025 | LEAKY ROOF · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH |
| Class B | Open | 6C | May 9, 2025 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Class B | OpenRENT IMPAIRING | 6D | May 9, 2025 | LEAKY ROOF · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING AT 2ND CLOSET FROM NORTH AT WEST IN THE PRIVATE HALLWAY LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH |
| Class B | Open | 6D | May 9, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH |
| Class B | Open | 6D | May 9, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AT 2ND CLOSET FROM NORTH AT WEST IN THE PRIVATE HALLWAY LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH |
| Class B | Open | 4A | May 9, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class B | Open | 4A | May 9, 2025 | REPAIR LEAKY FAUCETS · WATER SUPPLY§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Open | 4A | May 9, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT 1ST AND 2ND WINDOW SILL FROM NORTH AT WEST IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class B | Open | 6C | May 9, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Class B | OpenRENT IMPAIRING | 6D | May 9, 2025 | LEAKY ROOF · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH |
| Class B | Open | 6C | May 9, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Class B | Open | 6C | May 9, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Class B | OpenRENT IMPAIRING | 6D | May 9, 2025 | LEAKY ROOF · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH |
| Class B | Open | 6D | May 9, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH |
| Class B | OpenRENT IMPAIRING | 6C | May 9, 2025 | LEAKY ROOF · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Class B | Open | 4A | May 9, 2025 | SECURE LOOSE MATTER · MAINTENANCE§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE COUNTER TOP AT NORTH WALL IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class B | Open | 6C | May 9, 2025 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Class B | Open | 1E | Oct 17, 2024 | REPAIR OR REPLACE CO DETECTOR · CARBON MONOXIDE DETECTING DEVICES§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). INOPERABLE IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Open | 1E | Oct 17, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST AT SOUTH, THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class B | Open | 1E | Oct 17, 2024 | REPAIR OR REPLACE SMOKE DETECTOR · SMOKE DETECTING DEVICES§ 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR INOPERABLE IN THE ENTIRE APARTMENT LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Open | 1E | Oct 17, 2024 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Open | 1E | Oct 17, 2024 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DOOR FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class C | Open | 1E | Oct 17, 2024 | LEAD-BASED PAINT HAZARD- POSITIVE · LEAD-BASED PAINT§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class C | Open | 1E | Oct 17, 2024 | LEAD-BASED PAINT HAZARD- POSITIVE · LEAD-BASED PAINT§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME, 2nd CLOSET FROM EAST AT SOUTH WALL DOOR FRAME IN THE KITCHEN LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class B | OpenRENT IMPAIRING | 1E | Oct 17, 2024 | REPLACE DEFECTIVE SINK, WATER CLOSET, WASH TUB · SEWERS AND DRAINAGE§ 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WASH BASIN IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class C | Open | 1E | Oct 17, 2024 | LEAD-BASED PAINT HAZARD- POSITIVE · LEAD-BASED PAINT§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Open | 1E | Oct 17, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |