| Class A | Closed | 2B | Oct 7, 2024 | REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT DOORS AT UPPER WALL CABINET AT WEST IN THE KITCHEN LOCATED AT APT 2B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 1E | Oct 7, 2024 | REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT DOORS AT UPPER CABINET AT WEST WALL IN THE KITCHEN LOCATED AT APT 1E, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 2M | Oct 7, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2M, 3rd STORY, 4th APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 2M | Oct 7, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 2M, 3rd STORY, 4th APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 3K | Oct 7, 2024 | REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT DOORS TO UPPER WALL CABINET AT WEST IN THE KITCHEN LOCATED AT APT 3K, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | — | Oct 7, 2024 | FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING AT PUBLIC HALL, 9th STORY |
| Class A | Closed | 3K | Oct 7, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE KITCHEN LOCATED AT APT 3K, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 1E | Oct 7, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING, NORTH AND WEST WALLS IN THE BATHROOM LOCATED AT APT 1E, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class A | Open | — | Oct 7, 2024 | FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 2B | Oct 7, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH AND WEST WALLS IN CLOSET AT NORTH IN THE BATHROOM LOCATED AT APT 2B, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | — | Oct 7, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 4th STORY |
| Class A | Closed | 4P | Sep 26, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQFT AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 4P, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH'' |
| Class A | Closed | 4P | Sep 26, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL AND EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4P, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH'' |
| Class A | Closed | 4P | Sep 26, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL IN THE FOYER LOCATED AT APT 4P, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH'' |
| Class A | Closed | 5A | Aug 5, 2024 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE AROUND BATHTUB CAULKING AND CERAMIC WALLS AT WEST, SOUTH AND NORTH WALL IN THE BATHROOM LOCATED AT APT 5A, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 4R | Aug 5, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE BATHROOM FROM EAST LOCATED AT APT 4R, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 4R | Aug 5, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE BATHROOM FROM NORTH AT WEST LOCATED AT APT 4R, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 4A | Jul 1, 2024 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CLOSET DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 4A, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 4A | Jul 1, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILE IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 4A | Jul 1, 2024 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WASH BASIN POP UP STOPPER IN THE BATHROOM LOCATED AT APT 4A, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 2H | Jun 10, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 6th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 2H | Jun 10, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 6th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 4O | May 6, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL (APPROOX. 4 SQ FT) IN THE BATHROOM LOCATED AT APT 4O, 5th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 4C | May 6, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS IN THE BATHROOM LOCATED AT APT 4C, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 4H | May 6, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 4H, 5th STORY, 6th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 4H | May 6, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING (APPROX. 2 SQ FT) IN THE BATHROOM LOCATED AT APT 4H, 5th STORY, 6th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 4C | May 6, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST (APPROX. 2 SQ FT) AND WEST (APPROX. 2 SQ FT) WALLS IN THE BATHROOM LOCATED AT APT 4C, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 4P | Apr 15, 2024 | REPAIR LEAKY FAUCETS · WATER SUPPLY§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 4P, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 6D | Apr 8, 2024 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT EAST WALL IN THE KITCHEN LOCATED AT APT 6D, 6th STORY, 4th APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 6D | Apr 8, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 6D, 6th STORY, 4th APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 6D | Apr 8, 2024 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT SOUTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6D, 6th STORY, 4th APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 4D | Mar 21, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX 2 SQ FT IN THE BATHROOM LOCATED AT APT 4D, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 4H | Mar 21, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 4H, 5th STORY, 6th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 4C | Mar 21, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST AND WEST WALL IN THE BATHROOM LOCATED AT APT 4C, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 4O | Mar 21, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST AND WEST WALL IN THE BATHROOM LOCATED AT APT 4O, 5th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 4C | Mar 21, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST WALL APPROX 3 SQ FT AND WEST WALL APPROX 3 SQ FT IN THE BATHROOM LOCATED AT APT 4C, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 4D | Mar 21, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 4D, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 2N | Mar 21, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 2N, 3rd STORY, 5th APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 4H | Mar 21, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX 1 SQ FT IN THE BATHROOM LOCATED AT APT 4H, 5th STORY, 6th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 4O | Mar 21, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST WALL APPROX 1 SQ FT AND AT WEST WALL APPROX 1 SQ FT IN THE BATHROOM LOCATED AT APT 4O, 5th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3G | Feb 23, 2024 | REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT DOOR IN THE ENTRANCE LOCATED AT APT 3G, 4th STORY, 5th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | — | Feb 23, 2024 | REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT DOOR AT BULKHEAD IN THE PUBLIC HALL STAIRS LOCATED AT PUBLIC PARTS, 9th STORY, 1st PUBLIC PARTS FROM EAST AT SOUTH |
| Class A | Closed | 1F | Jan 29, 2024 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER CABINET ABOVE SINK IN THE KITCHEN LOCATED AT APT 1F, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 4F | Jan 22, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 4F, 4th STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 4F | Jan 22, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT NORTH WALL IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 4F | Jan 22, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 4F | Jan 22, 2024 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 2H | Jan 5, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT SOUTH AND NORTH WALL IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 6th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | — | Dec 22, 2023 | FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF ACOUSTICAL DROP CEILING INSTALLED AT PUBLIC HALL, 9th STORY |
| Class A | Closed | 2H | Dec 18, 2023 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING 9 (SQ FT) IN THE BATHROOM LOCATED AT APT 2H, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |