| Class A | Closed | 1J | Jul 22, 2024 | REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING RADIATOR COVER AT WEST WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 1J, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 1J | Jul 22, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE KITCHEN LOCATED AT APT 1J, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5L | Jul 22, 2024 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE THE DOOR IN THE 5th ROOM FROM EAST AT SOUTH LOCATED AT APT 5L, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 5L | Jul 22, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL GLAZE AT BATHTUB IN THE 3rd BATHROOM FROM EAST AT NORTH LOCATED AT APT 5L, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 5L | Jul 22, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... RECESSED WINDOW FRAME HEADER MORE LESS THAN 10 SQ.FT. IN THE 2nd ROOM FROM EAST LOCATED AT APT 5L, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 1J | Jul 22, 2024 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER CABINET DOOR AT WEST WALL IN THE KITCHEN LOCATED AT APT 1J, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 1J | Jul 22, 2024 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER CABINET DRAW AT NORTH WALL IN THE KITCHEN LOCATED AT APT 1J, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5L | Jul 22, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE RECESSED WINDOW FRAME HEADER IN THE 2nd ROOM FROM EAST LOCATED AT APT 5L, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 5L | Jul 22, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 3rd BATHROOM FROM EAST AT SOUTH LOCATED AT APT 5L, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 5L | Jul 22, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, WEST WALL, AND THE CEILING IN THE 3rd BATHROOM FROM EAST AT NORTH LOCATED AT APT 5L, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 5L | Jul 22, 2024 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE REFRIGERATOR DOOR GASKETS IN THE KITCHEN LOCATED AT APT 5L, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 2H | Jul 12, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 2H, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Open | 4K | Jul 12, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 4K, 4th STORY, 5th APARTMENT FROM SOUTH AT WEST |
| Class A | Open | 4K | Jul 12, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 4K, 4th STORY, 5th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | — | Jul 12, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 6th STORY |
| Class A | Closed | — | Jul 12, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS AT BULKHEAD , SECTION ''SOUTH'' |
| Class A | Closed | 2L | Jul 9, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT NORTH WALL AND CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 2L | Jul 9, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd BATHROOM FROM EAST, THE 1st BATHROOM FROM EAST, THE FOYER LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 4G | Apr 29, 2024 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER RETURN SYSTEM IN THE FOYER LOCATED AT APT 4G, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3H | Nov 3, 2023 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3H | Nov 3, 2023 | REPAIR LEAKY FAUCETS · WATER SUPPLY§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3H | Nov 3, 2023 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3H | Nov 3, 2023 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE TO IN THE FOYER LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | — | Mar 17, 2023 | FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. |
| Class A | Closed | 3D | Feb 17, 2023 | SECURE LOOSE MATTER · MAINTENANCE§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASH/BASIN AT WEST WALL IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , 3rd SECTION FROM WEST AT NORTH |
| Class A | Closed | — | Dec 28, 2022 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT NORTH ROOF BULK HEAD |
| Class A | Closed | 5D | Sep 6, 2022 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE KITCHEN LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 4L | Sep 2, 2022 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st BATHROOM FROM EAST AT NORTH, THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | — | Aug 30, 2022 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, SOUTH AND WEST WALL , 6th STORY, SECTION ''NORTH SIDE'' |
| Class A | Closed | — | Jul 25, 2022 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 6th STORY, SECTION ''SOUTH'' |
| Class A | Closed | — | Jul 22, 2022 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT BULKHEAD AT PUBLIC HALL, 6th STORY, SECTION ''NORTH'' |
| Class A | Closed | — | Jul 22, 2022 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT BULKHEAD AT PUBLIC HALL, 6th STORY, SECTION ''NORTH'' |
| Class A | Open | 3H | Feb 7, 2022 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3H | Feb 7, 2022 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 6 SQ. FT. AT CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3H | Feb 7, 2022 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 8 SQ. FT. AT CEILING IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 2F | Jan 21, 2022 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BATHTUB OR REGLAZE PORCELAINE ENAMEL FINISH IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , 2nd SECTION FROM WEST AT NORTH |
| Class A | Closed | 2F | Jan 21, 2022 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... (APPROX. 6 SQ. FEET) AT CEILING IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , 2nd SECTION FROM WEST AT NORTH |
| Class A | Open | 3H | Dec 22, 2021 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3H | Dec 22, 2021 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APRX 1 SQ FEET AT EAST WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3D | Jul 23, 2021 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT EAST WALL IN THE KITCHEN LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2L | Jul 23, 2021 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING , SOUTH AND NORTH WALLS IN THE BATHROOM LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | — | Jul 21, 2021 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WEST WALL AT BULK HEAD. STAIR <B> , 6th STORY |
| Class A | Closed | — | Jul 21, 2021 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WEST WALL AT BULK HEAD. (STAIR <B>) , 6th STORY |
| Class A | Closed | 2H | Jul 19, 2021 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 2H | Jul 19, 2021 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 2H | Jul 19, 2021 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS, CEILINGS AND TRIMS IN THE ENTIRE APARTMENT LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 6B | Jun 21, 2021 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WINDOW POCKET CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 6B | Jun 21, 2021 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WINDOW POCKET CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 3K | Apr 26, 2021 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 3K, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | — | Apr 5, 2021 | FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. |