| Class A | Open | 2G | May 27, 2026 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Open | 4F | May 4, 2026 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE STEAM RISER IN THE KITCHEN LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Open | 4F | May 4, 2026 | REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING TOP EXCSEXCUTCHEON PLATE AT STEAM RISER IN THE KITCHEN LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Open | 4F | May 4, 2026 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT WASH BASIN IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Open | — | Mar 27, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS AT PUBLIC HALL, 1st STORY |
| Class A | Open | — | Mar 16, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND SOUTH WALL AT PUBLIC HALL, 1ST STORY |
| Class A | Open | — | Mar 16, 2026 | FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF STUD AND SHEETROCK DOOR ERECTED AT PUBLIC HALL, 1ST STORY |
| Class A | Open | — | Mar 2, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1ST STORY |
| Class A | Open | — | Mar 2, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 5TH STORY AT SOUTH SECTION |
| Class A | Open | 2E | Jan 20, 2026 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH |
| Class A | Open | 2E | Jan 20, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH |
| Class A | Open | 2E | Jan 20, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE 1st PRIVATE HALLWAY FROM EAST LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH |
| Class A | Open | 2E | Jan 20, 2026 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH |
| Class A | Open | 2E | Dec 19, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 3rd ROOM FROM EAST LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH |
| Class A | Open | 2E | Dec 19, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME, 1st CLOSET FROM EAST AT SOUTH WALL DOOR, BASEBOARD AT NORTH WALL IN THE 1st PRIVATE HALLWAY FROM EAST LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH |
| Class A | Open | 2E | Dec 19, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FRAME FROM NORTH AT EAST WALL, 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME, 1st CLOSET FROM SOUTH AT WEST WALL DOOR, 2nd CLOSET FROM SOUTH AT WEST WALL DOOR FRAME IN THE 2nd PRIVATE HALLWAY FROM EAST LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH |
| Class A | Closed | 2E | Dec 18, 2025 | RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL .. IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH |
| Class A | Closed | 2E | Dec 10, 2025 | RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH |
| Class A | Open | 2E | Nov 21, 2025 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MOLD ON TILE GROUTED SURFACES AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH |
| Class A | Open | 2E | Nov 21, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE KITCHEN LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH |
| Class A | Open | 2E | Nov 21, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH |
| Class A | Open | 2E | Nov 21, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 4th ROOM FROM EAST LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH |
| Class A | Open | 2E | Nov 21, 2025 | REPAIR BROKEN, LOOSE CONNECTION · SEWERS AND DRAINAGE§ 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION DRAIN PIPE AT SINK IN THE KITCHEN LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH |
| Class A | Closed | 2H | Sep 23, 2025 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE NORTH RISER IN THE KITCHEN LOCATED AT APT 2H, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' |
| Class A | Closed | — | Sep 11, 2025 | POST A SIGN · POSTING/SIGNAGE§ 27-2022 ADM CODE POST A SIGN INDICATING HOURS OF COLLECTION AND METHOD OF COLLECTION OF WASTE MATERIAL WHERE DUMBWAITER SERVICE IS NOT PROVIDED. AT PUBLIC HALL, 1st STORY, SECTION AT NORTH |
| Class A | Closed | 3J | Aug 11, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Class A | Closed | 3J | Aug 1, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Class A | Closed | 3J | Aug 1, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT WASH BASIN IN THE BATHROOM LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Class A | Closed | 4H | Aug 1, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEEILING, EAST WALL AND SOUTH WALL INSIDE SOUTH WALL CLOSET IN THE 1st ROOM FROM EAST LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Class A | Closed | 3E | Aug 1, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''SOUTH'' |
| Class A | Closed | 2G | Jul 21, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL CEILING AND WALLS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 3H | Jul 21, 2025 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE HEAT RISER IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 5H | Jul 17, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT EAST WALL IN THE BATHROOM LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' |
| Class A | Closed | 3H | Jul 17, 2025 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RISER AT WEST WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' |
| Class A | Closed | 3H | Jul 17, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT WEST WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTH'' |
| Class A | Closed | 3J | Jul 9, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3H | Jul 9, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3H, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1C | Jun 27, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THEN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' |
| Class A | Closed | 5J | Jun 4, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Class A | Closed | 2G | Jun 4, 2025 | FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF A HOSE EXTENSION TO SUPPLY DRYER AT GAS LINE AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' |
| Class A | Open | — | Jun 4, 2025 | FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF AN EXTENDED BALCONY [ AT SOUTH EXTERIOR WALL] AT 1st FIRE ESCAPE FROM EAST, 3rd STORY |
| Class A | Closed | 3H | Jun 2, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WASHBASIN CABINET IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 3H | Jun 2, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER ESCUTCHEON PLATE AT RISER IN THE KITCHEN LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 3H | Jun 2, 2025 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT RISER IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 3J | Jun 2, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE FOYER LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3B | May 15, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING AND ALL WALLS IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH |
| Class A | Closed | 3B | May 15, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM RETURN SYSTEM FROM THE BUILDING STREET ENTRANCE TO THE TENANT'S CELL PHONE IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH |
| Class A | Closed | 3B | May 15, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT THE CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH |
| Class A | Closed | — | Apr 28, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST WALL AND CEILING AT BULKHEAD AT 5TH STORY , SECTION ''NORTH'' |
| Class A | Closed | — | Apr 28, 2025 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT 4TH STORY , SECTION ''SOUTH'' |