| Class A | Closed | 2K | Jan 14, 2026 | RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 1H | Nov 17, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT. AT WEST WALL, EAST WALL AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 2F | Sep 24, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST AND SOUTH WALLS IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Class A | Closed | 2F | Sep 24, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10.SQ.FEET OF MOLD AT EAST AND SOUTH WALLS IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'' |
| Class A | Open | — | Sep 4, 2025 | FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION COMPACTOR CLOSET DOOR SCREWED SHUT AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 1K | Aug 11, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 1K, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 2D | Mar 25, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 2D | Mar 25, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 2D | Mar 25, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL AND WEST WALL IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 2D | Mar 25, 2025 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT WEST RISER IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 2D | Mar 25, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 3D | Feb 19, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILE FLOOR( APPROXIMATELY 10 SQFT) IN THE 1st ROOM FROM EAST LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 3D | Feb 19, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILE FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 2N | Feb 7, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AROUND WINDOW FRAME AT NORTH. IN THE 2nd ROOM FROM EAST LOCATED AT APT 2N, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 2N | Feb 7, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AROUND WINDOW FRAME AT NORTH. IN THE 4th ROOM FROM EAST LOCATED AT APT 2N, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 2N | Feb 7, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AROUND WINDOW FRAME AT NORTH. IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 2N | Feb 7, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AROUND WINDOW FRAME AT NORTH. IN THE 3rd ROOM FROM EAST LOCATED AT APT 2N, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 2N | Feb 7, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AROUND WINDOW FRAME AT NORTH. IN THE BATHROOM LOCATED AT APT 2N, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 2B | Oct 24, 2024 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER CABINET AT WEST WALL IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 2G | Oct 21, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULK/SILICONE AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''CENTER '' |
| Class A | Closed | 3J | Oct 1, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 3J, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 2G | Sep 19, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING LESS THAN 10 SQ.FT IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''center'' |
| Class A | Closed | 5B | Aug 12, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER LOCATED AT APT 5B, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | — | Jul 16, 2024 | PROVIDE SHOE FOR DROP LADDER · FIRE EGRESS AND PROTECTION§ 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF DROP BY USING APPROPIATE NUTS AND BOLTS AT 1ST FIREESCAPE FROM NORTH AT WEST EXTERIOR WALL BUILDING FRONT 1ST STORY (CURRENTLY TACK WELDED ) AT FIRE ESCAPE |
| Class A | Closed | — | Jul 16, 2024 | PROVIDE SHOE FOR DROP LADDER · FIRE EGRESS AND PROTECTION§ 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER PROVIDE A SHOE PROPPERLY SECURED TO BOTTOM OF DROP LADDER BY USING, APPROPIATE NUTS AND BOLTS AT 1ST FIRE SCAPE FROM EAST AT NORTH EXTERIOR WALL,BUILDING FRONT 1ST FIRE ESCAPE.(CURRENTLY TACK WELDED) AT FIRE ESCAPE |
| Class A | Closed | 3O | Apr 9, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 3O, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST , SECTION ''1530'', 1st FROM EAST AT SOUTH |
| Class A | Closed | 4K | Feb 12, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR IN THE 1st BATHROOM LOCATED AT APT 4K, 4th STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION ''1530'', 1st FROM EAST AT SOUTH |
| Class A | Closed | 4K | Feb 12, 2024 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE NORTH WINDOW FRAMES IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 4K, 4th STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION ''1530'', 1st FROM EAST AT SOUTH |
| Class A | Closed | 4K | Feb 12, 2024 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE NORTH RADIATOR IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 4K, 4th STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION ''1530'', 1st FROM EAST AT SOUTH |
| Class A | Closed | 4K | Feb 12, 2024 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MOLD AND MILDEW AT AT WEST WALL CERAMIC TILES IN THE 1st BATHROOM LOCATED AT APT 4K, 4th STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION ''1530'', 1st FROM EAST AT SOUTH |
| Class A | Closed | 4K | Feb 12, 2024 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE NORTH RADIATOR IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 4K, 4th STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION ''1530'', 1st FROM EAST AT SOUTH |
| Class A | Closed | 1B | Oct 23, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT EAST WALL, SOUTH WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 1B | Oct 23, 2023 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 6M | Oct 10, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 5th ROOM FROM EAST AT NORTH, THE PRIVATE HALLWAY , THE FOYER LOCATED AT APT 6M, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 6M | Oct 3, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 5th ROOM FROM EAST AT SOUTH, THE 5th ROOM FROM EAST AT NORTH, THE BATHROOM LOCATED AT APT 6M, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 1B | Sep 11, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM NORTH AT EAST WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 1B | Sep 11, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL, WEST WALL, NORTH WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 1B | Sep 11, 2023 | RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL . IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 1B | Sep 11, 2023 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 1 SQ FT AT WEST WALL IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 1B | Sep 11, 2023 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RADIATOR FROM SOUTH AT WEST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 1B | Sep 11, 2023 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD PANEL AT WASH BASIN CABINET IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 1B | Sep 11, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 3rd ROOM FROM EAST AT NORTH, THE 1st PRIVATE HALLWAY FROM EAST, THE FOYER LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 1B | Sep 11, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | — | Sep 8, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1ST STORY PUBLIC HALLWAY AT EAST WALL SOUTH SECTION |
| Class A | Closed | — | Sep 8, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1ST STORY PUBLIC HALLWAY AT EAST WALL NORTH SECTION |
| Class A | Closed | — | Sep 8, 2023 | POST FLOOR SIGN · POSTING/SIGNAGE§ 27-2048 ADM CODE PAINT OR POST A SIGN INDICATING FLOORS AT 2ND STORY PUBLIC HALLWAY NORTH SECTION |
| Class A | Closed | — | Sep 8, 2023 | POST FLOOR SIGN · POSTING/SIGNAGE§ 27-2048 ADM CODE PAINT OR POST A SIGN INDICATING FLOORS AT 5TH STORY PUBLIC HALLWAY CENTER SECTION |
| Class A | Closed | — | Sep 8, 2023 | POST FLOOR SIGN · POSTING/SIGNAGE§ 27-2048 ADM CODE PAINT OR POST A SIGN INDICATING FLOORS AT 4TH STORY PUBLIC HALLWAY SOUTH SECTION |
| Class A | Closed | — | Sep 8, 2023 | POST FLOOR SIGN · POSTING/SIGNAGE§ 27-2048 ADM CODE PAINT OR POST A SIGN INDICATING FLOORS AT 3RD STORY PUBLIC HALLWAY |
| Class A | Closed | 1B | Aug 23, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' |