| Class A | Closed | 6G | Apr 16, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 6G | Apr 16, 2025 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT CEILING, 1st DOOR FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 6G | Apr 16, 2025 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 6G | Apr 16, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM NORTH AT EAST WALL DOOR, 2nd CLOSET FROM NORTH AT EAST WALL DOOR, 2nd CLOSET FROM NORTH AT EAST WALL WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 6G | Apr 16, 2025 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DOOR FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 6G | Apr 16, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 6G | Apr 16, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 6G | Apr 16, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 6G, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Open | — | Dec 23, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT FIRE RETARDANT MATERIAL AT CEILING AND WEST AND EAST WALLS AT PUBLIC HALL, 6th STORY, SECTION ''NORTH'' |
| Class A | Open | — | Dec 23, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT FIRE RETARDANT MATERIAL AT EAST WALL AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 6th STORY, SECTION ''NORTH'' |
| Class A | Open | — | Dec 3, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WEST WALL AT 6TH STORY NORTH SECTION AT PUBLIC HALL |
| Class A | Open | — | Dec 3, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND WEST WALL AT 6TH STORY SOUTH SECTION AT PUBLIC HALL |
| Class A | Open | — | Nov 25, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL 1ST STORY. |
| Class A | Closed | — | Nov 25, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 5th STORY, SECTION ''SOUTH'' |
| Class A | Open | — | Nov 25, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 5TH STORY AT NORTH SECTION |
| Class A | Closed | — | Nov 25, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 6th STORY, SECTION ''SOUTH'' |
| Class A | Closed | BSM | Nov 20, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FT. AT THE SOUTH WALL AND EAST WALL. IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT BSMT-APT BSM, 1st BSMT-APT FROM NORTH AT EAST |
| Class A | Closed | — | Nov 12, 2024 | REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT DOOR IN THE BULKHEAD IN THE PUBLIC HALL STAIRS LOCATED AT PUBLIC PARTS, 6th STORY, SECTION ''NORTH'', 1st FROM WEST AT NORTH |
| Class A | Closed | — | Nov 12, 2024 | REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT DOOR AT BASEMENT STORY IN THE BOILER ROOM LOCATED AT PUBLIC PARTS |
| Class A | Closed | — | Oct 29, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, WEST WALL, AND WINDOW CASING AT WEST WALL AT PUBLIC HALL, 6th STORY |
| Class A | Closed | — | Jul 1, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WEST WALL AT PUBLIC HALL, 6th STORY |
| Class A | Closed | — | May 1, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT 3RD STORY PUBLIC HALL AT NORTH SECTION |
| Class A | Closed | — | Mar 4, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, SOUTH WALL, WEST WALL, AND CEILING AT PUBLIC HALL, 3rd STORY, SECTION ''NORTH'' |
| Class A | Closed | — | Mar 4, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, EAST WALL, WEST WALL, AND CEILING AT PUBLIC HALL, 6th STORY, SECTION ''NORTH'' |
| Class A | Closed | — | Mar 4, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, SOUTH WALL, WEST WALL, AND CEILING AT PUBLIC HALL, 1st STORY, SECTION ''NORTH'' |
| Class A | Closed | 3D | Feb 16, 2024 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL AND TURNED BUZZER FROM BUILDING ENTRANCE TO APT BELL PANEL. IN THE FOYER LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION FROM WEST AT NORTH |
| Class A | Closed | — | Dec 18, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND SOUTH WALL AT PUBLIC HALL, 1st STORY |
| Class A | Closed | — | Oct 2, 2023 | POST FLOOR SIGN · POSTING/SIGNAGE§ 27-2048 ADM CODE PAINT OR POST A SIGN INDICATING FLOORS 2ND STORY, NORTH SECTION |
| Class A | Closed | — | Oct 2, 2023 | POST FLOOR SIGN · POSTING/SIGNAGE§ 27-2048 ADM CODE PAINT OR POST A SIGN INDICATING FLOORS NORTH SECTION, 3RD STORY |
| Class A | Closed | 3C | Aug 3, 2023 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTHWALL APPROX 5 SQ FT EASTWALL 2 SQ FT. AT CEILING 2 SQ FT. IN THE BATHROOM LOCATED AT APT 3C, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | — | Aug 3, 2023 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 3C | Aug 3, 2023 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BUZZER / INTERCOME RETURN SYSTEM FROM BUILDING FRONT TO EAST WALL IN THE FOYER LOCATED AT APT 3C, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | BSR | Apr 14, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT BSR, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | BSR | Apr 14, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM SOUTH AT WEST WALL IN THE FOYER LOCATED AT APT BSR, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | BSR | Apr 14, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT BSR, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | — | Mar 16, 2023 | FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. |
| Class A | Open | 3D | Feb 27, 2023 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INTERCOM SYSTEM LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH |
| Class A | Closed | — | Feb 21, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 5th STORY |
| Class A | Closed | 4H | Feb 21, 2023 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST |
| Class A | Closed | 4H | Feb 21, 2023 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST |
| Class A | Closed | 4H | Feb 21, 2023 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST |
| Class A | Closed | 6F | Jan 30, 2023 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM EAST AT SOUTH |
| Class A | Closed | — | Jan 30, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY, 1st SECTION FROM EAST AT SOUTH |
| Class A | Closed | — | Dec 27, 2022 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT THE NORTH 1 HALLWAY DOOR AT PUBLIC HALL, 6th STORY |
| Class A | Closed | — | Dec 27, 2022 | NO MIRROR IN ELEVATOR · PROTECTIVE DEVICES AND FIRE PROTECTION§ 27-2042 ADM CODE PROVIDE A MIRROR IN SELF-SERVICE ELEVATOR ARRANGED SO AS TO ENABLE A PERSON ENTERING, TO VIEW INSIDE OF ELEVATOR NUMBER 1 |
| Class A | Closed | — | Dec 27, 2022 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT THE BUILDING ENTRANCE DOOR , 1st STORY |
| Class A | Closed | — | Dec 27, 2022 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 6th STORY |
| Class A | Closed | — | Nov 4, 2022 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, SOUTH AND EAST WALLS AT PUBLIC HALL, 1st STORY |
| Class A | Closed | BASEME | Aug 8, 2022 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS AND CEILING CEILING, SOUTH WALL IN THE KITCHEN LOCATED AT BSMT-APT BASEME, 1st BSMT-APT FROM NORTH AT EAST |
| Class A | Closed | 6E | Nov 23, 2021 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 3 SQ.FT AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST |