| Class A | Open | 1B | May 26, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 2nd ROOM FROM EAST, THE BATHROOM , THE KITCHEN , THE 3rd ROOM FROM EAST, THE 4th ROOM FROM EAST AT NORTH, THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 1G | Apr 1, 2026 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT SOUTH WALL LESS 10 SQ FT IN THE BATHROOM LOCATED AT APT 1G, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1E | Mar 16, 2026 | RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Open | — | Mar 16, 2026 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE GARBAGE AT EAST YARD |
| Class A | Open | 1E | Mar 6, 2026 | RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Open | — | Feb 17, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 6th STORY, SECTION ''SOUTH'' |
| Class A | Open | 1E | Feb 12, 2026 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTERCOM SYSTEM FROM BUILDING ENTRANCE TO SOUTH WALL PANEL IN THE FOYER LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Open | 1E | Feb 12, 2026 | REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCHUTCHEOON PLATE AT RISER IN THE 1st ROOM FROM EAST LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Open | 6D | Feb 10, 2026 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING INSIDE THE CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | — | Jan 12, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING (SOUTH SECTION) AT PUBLIC HALL, 6th STORY |
| Class A | Open | 1E | Dec 29, 2025 | REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT DOOR IN THE ENTRANCE LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 1E | Nov 18, 2025 | REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT CLOSET DOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Open | — | Oct 30, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING (SOUTH SECTION) AT PUBLIC HALL, 6th STORY |
| Class A | Closed | — | Oct 20, 2025 | POST SMOKE DETECTOR NOTICE · POSTING/SIGNAGE§27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAILBOX MISSING AT PUBLIC HALL |
| Class A | Closed | 1E | Oct 20, 2025 | REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT DOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1E | Oct 16, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE OUTLETS AT EAST AND WEST WALL IN THE KITCHEN LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 4G | Oct 6, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 4G, 4th STORY, 4th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1E | Oct 6, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1E | Oct 6, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GASKET SEAL AROUND LOWER REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 1E, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 4G | Sep 11, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AND WEST WALL UNDER 10 SQ FT IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 4th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 4G | Sep 11, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WOOD CABINET DOOR AT SINK IN THE KITCHEN LOCATED AT APT 4G, 4th STORY, 4th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 2H | Aug 26, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL, CEILING IN THE KITCHEN LOCATED AT APT 2H, 2nd STORY, 5th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 2H | Aug 26, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST AT NORTH, THE PRIVATE HALLWAY , THE FOYER LOCATED AT APT 2H, 2nd STORY, 5th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 2H | Aug 26, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 2H, 2nd STORY, 5th APARTMENT FROM NORTH AT EAST |
| Class A | Open | 2H | Aug 26, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM EAST AT SOUTH WALL, EAST WALL, CEILING, SOUTH WALL IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 5th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 2H | Aug 26, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2H, 2nd STORY, 5th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 5F | Jun 27, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1D | Jan 21, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FT AT CEILING,WEST,EAST AND NORTH WALL IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 4G | Jan 17, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL AND RETURNED BUZZER FROM BUILDING ENTRANCE TO PANEL ON WEST WALL IN THE FOYER LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 2H | Jan 10, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT CEILING, NORTH WALL AND EAST WALL IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH |
| Class A | Closed | 4G | Jan 6, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 4th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 4G | Jan 6, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 4th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 4G | Jan 6, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 4G, 4th STORY, 4th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 4G | Jan 6, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 4G, 4th STORY, 4th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 4G | Jan 6, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FEET AT EAST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 4G, 4th STORY, 4th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1F | Dec 20, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL UNDER WASH BASIN IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1F | Dec 20, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD BASE BOARD AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1F, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | — | Oct 15, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MARBEL TILE AT NORTH WALL AT PUBLIC HALL, 1st STORY |
| Class A | Closed | — | Oct 15, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MARBEL TILE AT SOUTH WALL AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 3H | Sep 5, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM NORTH AT CENTER LOCATED AT APT 3H, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3H | Jul 30, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 3H, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3H | Jul 30, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, CEILING IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3H | Jul 30, 2024 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3H | Jul 30, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 1st DOOR FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM NORTH AT CENTER LOCATED AT APT 3H, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3H | Jul 30, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE FOYER , THE 1st PRIVATE HALLWAY FROM NORTH LOCATED AT APT 3H, 3rd STORY, 5th APARTMENT FROM NORTH AT EAST |
| Class A | Open | 5D | Jul 8, 2024 | FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WALL ERECTED SUB-DIVIDING ROOM INTO TWO IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 5D | Jul 8, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST AT NORTH, THE ENTRANCE LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 2H | May 29, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND NORTH DOOR FRAME IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 2H, 2nd STORY, 5th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 2H | May 29, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 2H, 2nd STORY, 5th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 2H | May 29, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE 1st PRIVATE HALLWAY FROM EAST LOCATED AT APT 2H, 2nd STORY, 5th APARTMENT FROM NORTH AT EAST |