stoop
Map
LeaderboardAbout
Building SafetyHousing Conditions

2390 MORRIS AVENUE

Bronx · ZIP 10468 · BIN 2013903 · Fordham Heights · Last violation May 20, 2026 · Last complaint May 15, 2026

NeighborhoodFordham Heights
More violations than 80.9% of nearby buildings
More violations than 81% of buildings and more complaints than 87% of buildings in Fordham Heights. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 439 violations · 418 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
65 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous65Class Bhazardous83
Housing Preservation & Development Violations
Total violations since 1990
1,053
28 per year avg.↑ Up 168% in the last 2 years (439 vs 164 prior 2 yrs)
Open violations
171
Class C (immed. haz.)ⓘ65
Class B (hazardous)ⓘ83
Rent-impairingⓘ11
Housing Preservation & Development Complaints
Total complaints since 2003
1,693
71 per year avg.↑ Up 140% in the last 2 years (418 vs 174 prior 2 yrs)
Complaint Resolution
No access23%Violation issued26%No violation31%Phone resolved20%Other0%(1,693)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ203 violations
Egressⓘ75 violations
Extermination & Rodent Eradicationⓘ73 violations
Paintingⓘ59 violations
Cleaningⓘ54 violations
Lead-Based Paintⓘ44 violations
Carbon Monoxide Detecting Devicesⓘ34 violations
Smoke Detecting Devicesⓘ33 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ137 complaints
Bldg maintenanceⓘ134 complaints
Mold & pestsⓘ115 complaints
Water & plumbingⓘ72 complaints
Safety & fireⓘ67 complaints
Appliancesⓘ28 complaints
Electricalⓘ25 complaints
Outdoor / structuralⓘ1 complaints
Hide violations ↑See complaints →

Violation log

223 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt

Building safety complaints, construction, permits, and structural issues filed with the NYC Dept. of Buildings, are scored separately.

Building Safety →
See something wrong? File a complaint with 311
Open violation ages
▪ < 30 days5% (8)
▪ 3–12 months19% (31)
▪ 1–3 years35% (59)
▪ 3+ years41% (69)
Prior 4 yr.
Immed. Emergency3%2%
Emergency68%54%
Non-Emergency30%44%
(74)
(592)
Issued
Description
Class AClosed6KNov 1, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL, AND THE CEILING IN THE KITCHEN LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed1GNov 1, 2024REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL GLAZE AT BATHTUB IN THE BATHROOM LOCATED AT APT 1G, 1st STORY, 4th APARTMENT FROM NORTH AT EAST
Class AClosed4HNov 1, 2024REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT THE LOWER SASH WINDOW IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed—Nov 1, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 4th STORY
Class AOpen6KNov 1, 2024PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE RISER IN THE BATHROOM LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed3CNov 1, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT. AT THE NORTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed—Nov 1, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY
Class AClosed1GNov 1, 2024REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING UPPER AND LOWER ESCUTCHEON PLATES AT THE RISER IN THE BATHROOM LOCATED AT APT 1G, 1st STORY, 4th APARTMENT FROM NORTH AT EAST
Class AClosed—Nov 1, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 6th STORY
Class AClosed4HNov 1, 2024REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING UPPER ESCUTCHEON PLATE AT RISER IN THE BATHROOM LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed6KNov 1, 2024REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING UPPER AND LOWER ESCUTCHEON PLATES AT THE RISER IN THE KITCHEN LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed1CNov 1, 2024REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEON PLATE AT RISER AT THE CEILING IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed2ANov 1, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed6KNov 1, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT. AT THE 1ST RECESSED WINDOW FRAME CASING AT SOUTH FROM WEST IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed1GNov 1, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE FOYER LOCATED AT APT 1G, 1st STORY, 4th APARTMENT FROM NORTH AT EAST
Class AClosed6KNov 1, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT. AT THE RECESSED WINDOW FRAME CASING IN THE BATHROOM LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed6KNov 1, 2024REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT THE 1ST AT SOUTH FROM WEST LOWER SASH WINDOW IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed6KNov 1, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed4HNov 1, 2024REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT THE LOWER SASH WINDOW IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed6KNov 1, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL, SOUTH WALL AND THE CEILING IN THE FOYER LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed4JNov 1, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed6KNov 1, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL, AND THE CEILING IN THE 1ST CLOSET AT EAST IN THE PRIVATE HALLWAY LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed1GNov 1, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, AND THE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1G, 1st STORY, 4th APARTMENT FROM NORTH AT EAST
Class AClosed6KNov 1, 2024REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL OUTLET COVER PLATE AT THE WEST WALL IN THE KITCHEN LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed1CNov 1, 2024REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE WEST WALL,AND THE CEILING IN THE BATHROOM LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed4JNov 1, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL, AND THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed4JNov 1, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed—Nov 1, 2024REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE CEILING AT THE VESTIBULE AT PUBLIC HALL, 1st STORY
Class AClosed—Nov 1, 2024REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE CEILING AT PUBLIC HALL, 6th STORY
Class AClosed4HNov 1, 2024REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT THE LOWER SASH WINDOW IN THE KITCHEN LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed1GNov 1, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL,AND THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1G, 1st STORY, 4th APARTMENT FROM NORTH AT EAST
Class AClosed6KNov 1, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT. AT THE NORTH WALL, EAST WALL, AND THE CEILING IN THE BATHROOM LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed2ANov 1, 2024REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed3CNov 1, 2024REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SLOPING WOOD FLOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed5LOct 31, 2024REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE UPPER AND LOWER SASH COUNTER BALANCE AT THE 1ST WINDOW FROM EAST AT SOUTH IN THE KITCHEN LOCATED AT APT 5L, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed5LOct 31, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5L, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed5LOct 31, 2024REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5L, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed—Oct 31, 2024REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL OUTLET SAFETY COVER AT SOUTH WALL AT PUBLIC HALL, 1st STORY
Class AClosed5LOct 31, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5L, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed5LOct 31, 2024REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5L, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed4GSep 20, 2024REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKET AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 4G, 4th STORY, 5th APARTMENT FROM NORTH AT EAST
Class AClosed1BJun 11, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, SOUTH WALL IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed1BJun 11, 2024PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME IN THE FOYER LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Class AOpen3EJun 11, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL CEILINGS AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 3E, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION ''NORTH'', AT NORTH
Class AClosed1BJun 11, 2024PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME IN THE 3rd ROOM FROM EAST LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Class AOpen3EMay 14, 2024REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BOTTOM OF WOOD SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION ''NORTH''
Class AOpen1BMay 2, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT BASEBOARD AT SOUTH WALL, NORTH WALL, 1st CLOSET FROM NORTH AT EAST WALL DOOR, SOUTH WALL IN THE FOYER LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed1BMay 2, 2024PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed1BMay 2, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 3rd ROOM FROM EAST LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed2FOct 20, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST
Page 2 of 5
← PrevNext →