| Class A | Open | 2F | Apr 23, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Open | — | Apr 23, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY |
| Class A | Open | 2F | Apr 23, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, WEST WALL, NORTH WALL IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Open | 2F | Apr 23, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd PRIVATE HALLWAY FROM NORTH, THE 1st ROOM FROM NORTH, THE FOYER LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Open | — | Apr 23, 2026 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT CEILING AT PUBLIC HALL, 1st STORY |
| Class A | Open | 2F | Apr 23, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM WEST AT NORTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Open | 2F | Apr 23, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 1F | Aug 6, 2025 | SECURE LOOSE MATTER · MAINTENANCE§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASH BASIN CABINET, AT EAST WALL IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1F | Aug 6, 2025 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT RISER AND RADIATOR AT SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1F | Aug 5, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1F | Aug 5, 2025 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | — | Aug 5, 2025 | REMOVE ACCUMULATION OR RUBBISH · CLEANING§ 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE NORTH YARD, BUILDING REAR |
| Class A | Open | — | May 20, 2025 | FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SEALED 1ST, 2ND, 3RD, 4TH, WINDOW FROM WEST AT NORTH WALL [EAST SECTION] AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 2F | May 6, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 1st ROOM FROM NORTH, THE KITCHEN , THE PRIVATE HALLWAY , THE 4th ROOM FROM NORTH LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2F | May 6, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 1F | May 5, 2025 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE STEAM RADIATOR AT SOUTH IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''CENTER'' |
| Class A | Closed | 1F | May 5, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''CENTER'' |
| Class A | Closed | 2J | Apr 22, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT SOUTH AND WEST WALL IN THE BATHROOM LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''west'' |
| Class A | ClosedRENT IMPAIRING | 2J | Apr 22, 2025 | LEAKY FLUSH PIPE CONNECTION · SEWERS AND DRAINAGE§ 27-2026 ADM CODE REPAIR LEAKY WATER CLOSET FLUSH PIPE CONNECTION WATER CLOSET IN THE BATHROOM LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''west'' |
| Class A | Open | 3J | Apr 3, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL CEILINGS WALLS DOORS AND TRIM IN THE ENTIRE APARTMENT LOCATED AT APT 3J, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 6E | Feb 27, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS, CEILING ,TRIMS AND MOULDING IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''CENTRAL'' |
| Class A | Closed | ST1 | Feb 24, 2025 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MOLD AT CERAMIC TILES EAST AND WEST WALLS IN THE BATHROOM LOCATED AT CELLAR APT ST1, 1st CELLAR APT FROM SOUTH AT WEST |
| Class A | Closed | ST1 | Feb 24, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN GLAZED AT BATHTUB WITH FINISH ENAMEL PAINT IN THE BATHROOM LOCATED AT CELLAR APT ST1, 1st CELLAR APT FROM SOUTH AT WEST |
| Class A | Closed | 4D | Feb 18, 2025 | REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT DOOR IN THE ENTRANCE LOCATED AT APT 4D, 4th STORY, 4th APARTMENT FROM WEST AT NORTH |
| Class A | Closed | — | Feb 18, 2025 | REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT DOOR AT THE BULKHEAD IN THE PUBLIC HALL STAIRS LOCATED AT PUBLIC PARTS, 6th STORY, 1st PUBLIC PARTS FROM NORTH AT EAST |
| Class A | Closed | — | Feb 18, 2025 | REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT DOOR AT THE BULKHEAD IN THE PUBLIC HALL STAIRS LOCATED AT PUBLIC PARTS, 6th STORY, 1st PUBLIC PARTS FROM SOUTH AT WEST |
| Class A | Closed | 3K | Feb 18, 2025 | REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT DOOR IN THE ENTRANCE LOCATED AT APT 3K, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 3J | Feb 11, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ. FT. AT WEST WALL, SOUTH WALL AND CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 3J, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST |
| Class A | Closed | 2J | Jan 3, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ. FT AT SOUTH WALL IN THE 5th ROOM FROM NORTH AT EAST LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''West'' |
| Class A | Closed | 2J | Sep 16, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT CEILING ( APPROX 1 SQ.FT) WEST WALL ( APPROX 3 SQ.FT) AND SOUTH WALL ( APPROX 3 SQ.FT) IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''WEST'' |
| Class A | Closed | — | Sep 16, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT CEILING AT VESTIBULE, 1ST STORY |
| Class A | Closed | 3A | May 1, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST'' |
| Class A | Closed | 1D | Apr 10, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN LOCATED AT APT 1D, 1st STORY, 4th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3E | Jan 30, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM EAST AT SOUTH WALL, SOUTH WALL, EAST WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3E, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 3E | Jan 30, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM SOUTH AT WEST WALL DOOR, 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME, SOUTH WALL, EAST WALL IN THE FOYER LOCATED AT APT 3E, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 3E | Jan 30, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 3E | Jan 30, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME IN THE PRIVATE HALLWAY LOCATED AT APT 3E, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 3E | Jan 30, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3E, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 3E | Dec 28, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3E, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 3E | Dec 28, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL, WEST WALL IN THE FOYER LOCATED AT APT 3E, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 3E | Dec 28, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM WEST AT NORTH WALL, EAST WALL, WEST WALL, NORTH WALL IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 3E | Dec 28, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL, SOUTH WALL, 1st CLOSET FROM SOUTH AT WEST WALL DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 3E, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 1D | Nov 21, 2023 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''east'' |
| Class A | Closed | 4J | Nov 21, 2023 | REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING HANDLE AT EAST 3 CLOSET DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 1D | Nov 21, 2023 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''east'' |
| Class A | Closed | 4J | Nov 21, 2023 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING ( APPROX 2 SQFT) IN THE KITCHEN LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 4J | Nov 21, 2023 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH BY METHOD OF REGLAZING IN THE 2nd BATHROOM FROM NORTH AT EAST LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 4J | Nov 21, 2023 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING (APPROX 3 SQFT), AND NORTH WALL (APPROX 4 SQFT) IN THE 2nd BATHROOM FROM NORTH AT EAST LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 4J | Nov 21, 2023 | REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING HANDLE AT EAST 2 CLOSET DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | — | Sep 21, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT VESTIBULE |