| Class B | Open | 3F | May 28, 2026 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WASH BASIN IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class A | Open | — | May 28, 2026 | RENT STABILIZATION LAW INFORMATION SIGN · POSTING/SIGNAGE§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMATION/REQUIRED-SIGNAGE.PAGE |
| Class B | Open | 3F | May 28, 2026 | REPAIR LEAKY FAUCETS · WATER SUPPLY§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class C | Open | 6D | Apr 28, 2026 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT LOWER WINDOW SASH IN THE BATHROOM LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class C | Open | 6D | Apr 28, 2026 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT LOWER WINDOW SASH IN THE KITCHEN LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Open | 5G | Apr 27, 2026 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCEAIN ENAMEL TUB BY WAY OF REGLAZE IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 2J | Jan 30, 2026 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM WEST AT NORTH WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2J | Jan 30, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT NORTH WALL, BASEBOARD AT WEST WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2J | Jan 30, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE PRIVATE HALLWAY LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2J | Jan 30, 2026 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, EAST WALL, EAST WALL, NORTH WALL IN THE FOYER LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class C | Open | 2J | Jan 30, 2026 | LEAD-BASED PAINT HAZARD- POSITIVE · LEAD-BASED PAINT§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM EAST AT SOUTH WALL, 2nd WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2J | Jan 30, 2026 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class C | Open | 2J | Jan 30, 2026 | LEAD-BASED PAINT HAZARD- POSITIVE · LEAD-BASED PAINT§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL, PICTURE MOULDING AT SOUTH WALL, PICTURE MOULDING AT EAST WALL IN THE FOYER LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2J | Jan 30, 2026 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM WEST AT NORTH WALL, 1st DOOR FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2J | Jan 30, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2J | Jan 30, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT NORTH WALL, BASEBOARD AT WEST WALL IN THE FOYER LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2J | Jan 30, 2026 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2J | Jan 30, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | ClosedRENT IMPAIRING | 2J | Jan 27, 2026 | LEAKY FLUSH PIPE CONNECTION · SEWERS AND DRAINAGE§ 27-2026 ADM CODE REPAIR LEAKY WATER CLOSET FLUSH PIPE CONNECTION ... IN THE BATHROOM LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class C | Open | 2J | Jan 27, 2026 | ABATE THE NUISANCE OF ROACHES · EXTERMINATION & RODENT ERADICATIONHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class C | Open | 2J | Jan 27, 2026 | ABATE THE NUISANCE OF MICE · EXTERMINATION & RODENT ERADICATIONHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Open | 2J | Jan 27, 2026 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN GLAZE AT THE BATH TUB IN THE BATHROOM LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class C | Open | 2J | Jan 27, 2026 | LEAD-BASED PAINT HAZARD- POSITIVE · LEAD-BASED PAINT§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL IN THE KITCHEN LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2J | Jan 27, 2026 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE 20 SQUARE FEET OF MOLD ON THE GROUT OF CERAMIC TILES AT THE SOUTH WALL AND THE WEST WALL IN THE BATHROOM LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class C | Open | 5G | Jan 5, 2026 | LEAD-BASED PAINT HAZARD - DURING UNIT VACANCY · LEAD-BASED PAINT§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AND CLEANABLE, POSITIVE LEAD-BASED PAINT IN AN APARTMENT WITH A CHILD UNDER SIX LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class C | Closed | 5G | Jan 2, 2026 | ABATE THE NUISANCE OF ROACHES · EXTERMINATION & RODENT ERADICATIONHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class B | Closed | 5G | Jan 2, 2026 | REPAIR OR REPLACE SMOKE DETECTOR · SMOKE DETECTING DEVICES§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class C | Open | 5G | Jan 2, 2026 | LEAD-BASED PAINT HAZARD- POSITIVE · LEAD-BASED PAINT§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class C | Open | 5G | Jan 2, 2026 | LEAD-BASED PAINT HAZARD- POSITIVE · LEAD-BASED PAINT§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM WEST AT NORTH WALL DOOR, 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5G | Jan 2, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, SOUTH WALL, EAST WALL, WEST WALL, CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class B | Closed | 5G | Jan 2, 2026 | REPAIR OR REPLACE CO DETECTOR · CARBON MONOXIDE DETECTING DEVICES§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class C | Open | 5G | Jan 2, 2026 | LEAD-BASED PAINT HAZARD- POSITIVE · LEAD-BASED PAINT§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, EAST WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5G | Jan 2, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE KITCHEN LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5G | Jan 2, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, SOUTH WALL IN THE FOYER LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5G | Jan 2, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, SOUTH WALL, EAST WALL, WEST WALL IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class C | Open | 5G | Jan 2, 2026 | LEAD-BASED PAINT HAZARD- POSITIVE · LEAD-BASED PAINT§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL, NORTH WALL, SOUTH WALL, EAST WALL, WEST WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5G | Jan 2, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5G | Jan 2, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class C | Open | 5G | Jan 2, 2026 | LEAD-BASED PAINT HAZARD- POSITIVE · LEAD-BASED PAINT§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM EAST AT SOUTH WALL DOOR, 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME, SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class C | Open | 5G | Jan 2, 2026 | LEAD-BASED PAINT HAZARD- POSITIVE · LEAD-BASED PAINT§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM WEST AT NORTH WALL, 2nd WINDOW FRAME FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5G | Jan 2, 2026 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class B | Closed | — | Oct 6, 2025 | PROVIDE GARGABE CANS · COLLECTION OF WASTE§ 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. |
| Class B | ClosedRENT IMPAIRING | — | Aug 8, 2025 | REMOVE ENCUMBRANCES · EGRESS§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CONSTRUCTION MATERIALS AT PUBLIC HALL, 1st STORY |
| Class C | Closed | 5F | Jul 15, 2025 | INSTALL/REPLACE/REPAIR WINDOW GUARDS (APT) · WINDOW GUARDS§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class B | Closed | 5F | Jul 15, 2025 | REPAIR/ABATE UNSAFE WIRES · ARTIFICIAL LIGHTING§ 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED WIRES AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5F, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class B | Closed | 5F | Jul 15, 2025 | REPAIR OR REPLACE SMOKE DETECTOR · SMOKE DETECTING DEVICES§ 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class B | Closed | 5F | Jul 15, 2025 | REPAIR OR REPLACE CO DETECTOR · CARBON MONOXIDE DETECTING DEVICES§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class B | Closed | 5F | Jul 15, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURE AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5F, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class C | Closed | 5F | Jul 15, 2025 | ABATE THE NUISANCE OF ROACHES · EXTERMINATION & RODENT ERADICATIONHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5F | Jul 11, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5F, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST |