| Class A | Open | — | Apr 30, 2026 | FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. |
| Class A | Open | 1E | Apr 7, 2026 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM SOUTH AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 1E | Apr 7, 2026 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 1E | Mar 19, 2026 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FT AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 1E | Feb 12, 2026 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 1E | Feb 12, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE 3rd ROOM FROM EAST, THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 1E | Feb 12, 2026 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st WINDOW FRAME FROM NORTH AT EAST WALL, 1st RADIATOR FROM NORTH AT EAST WALL, 2nd WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | — | Nov 10, 2025 | PROVIDE SHOE FOR DROP LADDER · FIRE EGRESS AND PROTECTION§ 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER [AND PROPERLY SECURE BY USING APPROPIATE NUTS AND BOLTS] AT 1ST FIRE ESCAPE FROM WEST AT SOUTH EXTERIOR WALL AT FIRE ESCAPE |
| Class A | Closed | 1L | Oct 31, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FEET AT CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 1L, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Open | — | Oct 14, 2025 | FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DOORS SEALED SHUT AT ALL STORIES AT COMPACTOR CLOSET |
| Class A | Closed | 1L | Aug 25, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BASEWOOD CABINET AT WASHBASIN IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | — | Jul 31, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL AT PUBLIC HALL AT BASEMENT |
| Class A | Closed | — | Jul 25, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL AT BASEMENT |
| Class A | Closed | 1L | Jul 25, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES AT FLOOR IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Open | — | Jul 16, 2025 | PROVIDE SHOE FOR DROP LADDER · FIRE EGRESS AND PROTECTION§ 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER AND SECURING BY USING APPROPRIATE NUTS AND BOLTS AT 1ST FIRE ESCAPE FROM WEST AT SOUTH EXTERIOR WALL AT FIRE ESCAPE |
| Class A | Open | 2J | Jun 27, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL CEILINGS WALLS DOORS AND TRIM IN THE ENTIRE APARTMENT LOCATED AT APT 2J, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 1L | Jun 17, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES AT FLOOR IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | — | Jun 5, 2025 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE ACCUMULATED RUBISH AT PUBLIC HALL, 1st STORY |
| Class A | Closed | A | Apr 28, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT. AT CEILING IN THE KITCHEN LOCATED AT BSMT-APT A, 1st BSMT-APT FROM WEST AT NORTH |
| Class A | Closed | A | Apr 28, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT CELLAR APT A, 1st CELLAR APT FROM WEST AT NORTH |
| Class A | Closed | A | Apr 28, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BATHTUB OR REGLAZE PORCELAIN ENAMEL FINISH IN THE BATHROOM LOCATED AT CELLAR APT A, 1st CELLAR APT FROM WEST AT NORTH |
| Class A | Closed | 5K | Apr 16, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE FOYER LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5K | Apr 16, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5K | Mar 13, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 3rd ROOM FROM EAST AT SOUTH, THE 2nd ROOM FROM EAST LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5K | Mar 13, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT 1ST AND 2ND WINDOW OPENING 1st WINDOW FRAME FROM EAST AT SOUTH WALL, CEILING, 1st WINDOW FRAME FROM EAST AT SOUTH WALL, BASEBOARD AT WEST WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL, CEILING, 1st WINDOW FRAME FROM EAST AT SOUTH WALL, BASEBOARD AT WEST WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL, CEILING, 1st WINDOW FRAME FROM EAST AT SOUTH WALL, BASEBOARD AT WEST WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL, CEILING, 1st WINDOW FRAME FROM EAST AT SOUTH WALL, BASEBOARD AT WEST WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5K | Mar 10, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL, WEST WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL, WEST WALL, SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5K | Mar 10, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL, SOUTH WALL IN THE KITCHEN LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5K | Mar 10, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM NORTH AT EAST WALL, SOUTH WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 5K, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Open | — | Mar 3, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, BASEMENT AT PUBLIC HALL |
| Class A | Open | — | Mar 3, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, WEST WALL, AND THE SOUTH WALL, AT THE BULKHEAD |
| Class A | Open | — | Mar 3, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 6th STORY |
| Class A | Open | 1J | Dec 18, 2024 | FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SHEETROCK AND STUD WALL WITH DOOR ERECTED FROM FLOOR TO CEILING OBSTRUCTING NATURAL LIGHT AND VENTILATION IN THE 4th ROOM FROM NORTH LOCATED AT APT 1J, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Open | 1J | Dec 18, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 1st DOOR FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 1J, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Open | 1J | Dec 18, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL, EAST WALL, SOUTH WALL, NORTH WALL IN THE BATHROOM LOCATED AT APT 1J, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Open | 1J | Dec 18, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE 4th ROOM FROM NORTH, THE PRIVATE HALLWAY , THE FOYER LOCATED AT APT 1J, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 1J | Apr 12, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM FROM EAST, THE KITCHEN LOCATED AT APARTMENT 1J, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | — | Apr 2, 2024 | FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. |
| Class A | Closed | 6D | Jan 8, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 6D, 6th STORY, 6th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 2E | Jan 4, 2024 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURE AT EAST WALL IN THE KITCHEN LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | — | Jan 4, 2024 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE AT PUBLIC HALL |
| Class A | Closed | 2K | Dec 20, 2023 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 2ND STORY APART.ENT 2K HAS APPROXIMATELY 5SQ FT OF MOLD AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Open | 2K | Dec 20, 2023 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALLS (PLASTER DAMAGE) IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Open | 2K | Dec 20, 2023 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WALL TILE BEHIND TOILET (LOOSE/FALLING OUT) IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Open | 2K | Dec 20, 2023 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING (HOLE) APPROX 1SQ FT IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Open | 6D | Dec 7, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT WEST, THE BATHROOM , THE 2nd ROOM FROM NORTH AT WEST, THE 1st ROOM FROM NORTH AT WEST, THE 2nd ROOM FROM NORTH AT WEST, THE 2nd ROOM FROM NORTH AT WEST, THE PRIVATE HALLWAY LOCATED AT APT 6D, 6th STORY, 6th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | — | Dec 7, 2023 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 3C | Nov 27, 2023 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3C, 3rd STORY, 5th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 3C | Nov 27, 2023 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3C, 3rd STORY, 5th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | — | Oct 20, 2023 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE ALL STORIES AND STAIRS AT PUBLIC HALL |
| Class A | Closed | — | Oct 20, 2023 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE ALL FLOORS AT STORIES AND STAIRS |