| Class A | Closed | 6H | Feb 18, 2025 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST |
| Class A | Closed | 6H | Feb 18, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM WEST AT NORTH WALL WALL, EAST WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST |
| Class A | Closed | 6H | Feb 18, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT 1ST WINDOW FRAME FROM NORTH AT EAST WALL AND 1st WINDOW SASH FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST |
| Class A | Closed | — | Feb 6, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL AT PUBLIC HALL, 6th STORY, SECTION AT WEST |
| Class A | Closed | — | Jan 6, 2025 | POST, NOTICE ABOUT PREVENTION · POSTING/SIGNAGE§27-2018.1 HMC: POST, IN THE FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN THE NOTICE ABOUT PREVENTION, DETECTION AND REMOVAL OF BEDBUG INFESTATION REQUIRED BY §27-2018.1 IN COMMON AREA OF THE BUILDING OR PROVIDE TO EACH TENANT, ACCORDING TO THE CERTIFICATION MADE ON SUCH ANNUAL BEDBUG REPORT. |
| Class A | Closed | 6J | Jan 6, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AROUND SOUTH WALL WINDOWS IN THE 2nd ROOM FROM EAST LOCATED AT APT 6J, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST |
| Class A | Closed | — | Jan 6, 2025 | POST A SIGN · POSTING/SIGNAGE§ 27-2022 ADM CODE POST A SIGN INDICATING HOURS OF COLLECTION AND METHOD OF COLLECTION OF WASTE MATERIAL WHERE DUMBWAITER SERVICE IS NOT PROVIDED. AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 6J | Jan 6, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AROUND SOUTH WALL WINDOW IN THE BATHROOM LOCATED AT APT 6J, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST |
| Class A | Closed | 6J | Jan 6, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AROUND SOUTH WALL WINDOW AND WEST WALL WINDOW. IN THE 4th ROOM FROM EAST LOCATED AT APT 6J, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST |
| Class A | Closed | 4E | Oct 16, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 4E | Oct 16, 2024 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MOLD ON GROUT AT WEST AND NORTH CERAMIC WALL TILES IN THE BATHROOM LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 3G | Oct 4, 2024 | REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT DOOR AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 3G, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | — | Apr 8, 2024 | POST HOUSING INFORMATION GUIDE NOTICE · POSTING/SIGNAGE§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD., 1st STORY |
| Class A | Closed | 6G | Mar 21, 2024 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION 2ND WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 6G | Mar 21, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 1 SQ FT AT 2ND WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 6G | Mar 21, 2024 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION WINDOW FRAME AT SOUTH WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 6G | Mar 21, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 1 SQ.FT 1ST WINDOW SASH FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | — | Mar 21, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, THE SOUTH WALL AND THE WEST WALL AT PUBLIC HALL, 6th STORY, SECTION ''WEST'', AT WEST |
| Class A | Closed | 6G | Mar 21, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 1 SQ FT AT WINDOW FRAME AT SOUTH WALL IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | — | Mar 4, 2024 | POST SIGN INDICATING NAME AND ADDRESS OF JANITOR, ETC. · POSTING/SIGNAGE§ 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 2K | Feb 5, 2024 | RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Class A | Closed | 3D | Feb 1, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 6 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 6E | Jan 2, 2024 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE RADIATOR AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 6E | Jan 2, 2024 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE RADIATOR AT WEST WALL IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 6E | Jan 2, 2024 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE STEAM RISER IN THE BATHROOM LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 1D | Dec 29, 2023 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCLAIN ENAMEL FINISH BY METHOD OF REGLAZE AT BATHTUB IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST |
| Class A | Closed | — | Dec 11, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 6K | Oct 16, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WEST |
| Class A | Closed | 6P | Oct 11, 2023 | FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF DRY WALL PARTITION ERECTED FROM FLOOR TO CEILING AND HENCE CREATING ADDITIONAL ROOM AND REDUCING NATURAL LIGHT AND VENTILATION IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6P, 6th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 6R | Aug 22, 2023 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILE FLOOR COVERING IN THE FOYER LOCATED AT APT 6R, 6th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | — | Aug 4, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CELING AND WEST WALL AT PUBLIC HALL, 6th STORY, SECTION AT WEST |
| Class A | Closed | 2L | Jul 21, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE BATHROOM LOCATED AT APT 2L, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 6G | Jul 14, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 6G | Jul 14, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2R | Jun 26, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE BATHROOM , THE 1st ROOM FROM NORTH LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | — | Jun 23, 2023 | PROVIDE SHOE FOR DROP LADDER · FIRE EGRESS AND PROTECTION§ 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER 2ND FIRE ESCAPE FROM WEST AT NORTH |
| Class A | Closed | 1D | Jun 16, 2023 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE STEAM RISER IN THE 1st ROOM FROM NORTH LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 5D | Jun 16, 2023 | PROVIDE · MAINTENANCE§ 27-2005 ADM CODE PROVIDE ESCUTCHEON PLATE AT CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | — | Jun 16, 2023 | FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION COMPACTOR DOOR SEALED SHUT AT COMPACTOR CLOSET ALL STORIES AT PUBLIC HALL |
| Class A | Closed | 5D | Jun 16, 2023 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE STEAM RISER IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2J | Jun 16, 2023 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINIL FLOOR TILES IN THE 2nd ROOM FROM EAST LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST |
| Class A | Closed | 2R | Jun 16, 2023 | FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WALL ERECTED WITH DOOR ATTACHED CREATING ADDITIONAL ROOM IN THE 4th ROOM FROM EAST LOCATED AT APT 2R, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 5D | Jun 16, 2023 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 5A | Jun 16, 2023 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SILICONE CAULK AT TILES AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 1D | Jun 16, 2023 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE STEAM RISER IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 1D | Jun 16, 2023 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2J | Jun 16, 2023 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR KNOB AT CLOSET DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST |
| Class A | Closed | 1D | Jun 12, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE PRIVATE HALLWAY , THE FOYER , THE KITCHEN , THE 1st ROOM FROM NORTH LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 6J | Jun 12, 2023 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 5 SQ FT AT CEILING IN THE FOYER LOCATED AT APT 6J, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST |
| Class A | Closed | 5A | May 30, 2023 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING IN THE KITCHEN LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' |