| Class A | Closed | 4A | Oct 18, 2021 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT THE ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM EAST AT SOUTH |
| Class A | Closed | 4A | Oct 18, 2021 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILINGS & WALLS THRU-OUT IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM EAST AT SOUTH |
| Class A | Closed | 4A | Oct 18, 2021 | SECURE LOOSE MATTER · MAINTENANCE§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE ELECTRICAL OUTLET AT NORTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , 1st SECTION FROM EAST AT SOUTH |
| Class A | Closed | — | Oct 8, 2021 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE AT PUBLIC HALL, 6th STORY, SECTION AT WEST |
| Class A | Closed | 4O | Oct 7, 2021 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 4O, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' |
| Class A | Closed | 6N | Oct 5, 2021 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6N, 6th STORY, 4th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | — | Oct 4, 2021 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS AT LOBBY |
| Class A | Closed | 5Q | Oct 4, 2021 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 1 SQ. FT AT NORTH AND EAST WALL IN THE BATHROOM LOCATED AT APT 5Q, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' |
| Class A | Closed | 5Q | Oct 4, 2021 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5Q, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' |
| Class A | Closed | 3D | Sep 10, 2021 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CLOSET NORTH WALL (APPROX.4 SQ.FT.) IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 3D, 3rd STORY, 4th APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 1M | Sep 10, 2021 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 3 SQ FT AT SOUTH WALL, APPROX. 2 SQ FT AT WEST WALL, APPROX. 2 SQ FT AT CEILING. IN THE BATHROOM LOCATED AT APT 1M, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' |
| Class A | Closed | 3D | Sep 10, 2021 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT WEST WALL INSIDE THE CLOSET APPROX. 1 SQ. FT. IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3D, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST , SECTION ''EAST'' |
| Class A | Closed | 3D | Sep 10, 2021 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL INSIDE THE CLOSET IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3D, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST , SECTION ''EAST'' |
| Class A | Closed | 3D | Sep 10, 2021 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST , SECTION ''EAST'' |
| Class A | Closed | 3D | Sep 10, 2021 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CLOSET NORTH WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 3D, 3rd STORY, 4th APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 1V | Aug 30, 2021 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 1V, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM WEST AT NORTH |
| Class A | Closed | 7Q | Aug 30, 2021 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 7Q, 7th STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION FROM WEST AT NORTH |
| Class A | Closed | 7Q | Aug 30, 2021 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING & WALLS IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 7Q, 7th STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION FROM WEST AT NORTH |
| Class A | Closed | 7Q | Aug 30, 2021 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 7Q, 7th STORY, 1st APARTMENT FROM NORTH AT EAST , 1st SECTION FROM WEST AT NORTH |
| Class A | Closed | — | Aug 24, 2021 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 7th STORY, SECTION ''WEST'' |
| Class A | Closed | 1D | Aug 24, 2021 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 2M | Aug 24, 2021 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 2M, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 1D | Aug 24, 2021 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE CLOSET IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1D, 1st STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 2B | Aug 12, 2021 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT EAST |
| Class A | Closed | 2B | Aug 12, 2021 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT EAST |
| Class A | Closed | 2B | Aug 12, 2021 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING ANDEAST WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT EAST |
| Class A | Closed | 2B | Aug 12, 2021 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT EAST |
| Class A | Closed | 2B | Aug 12, 2021 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... ON CEILING APPROX. 2 SQ FT IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT EAST |
| Class A | Closed | 2B | Aug 12, 2021 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT EAST |
| Class A | Closed | 3N | Aug 10, 2021 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 3N, 3rd STORY, 4th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 6C | Aug 10, 2021 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT THE DOOR IN THE ENTRANCE LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 7Q | Aug 10, 2021 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 7Q, 7th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3N | Aug 10, 2021 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING (APPROX 8 SQ.FT) IN THE BATHROOM LOCATED AT APT 3N, 3rd STORY, 4th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1H | Jul 19, 2021 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE FOYER LOCATED AT APT 1H, 1st STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION AT WEST |
| Class A | Closed | 4 | May 24, 2021 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPRX 6 SQ FT IN THE BATHROOM LOCATED AT APT 4, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 4H | May 17, 2021 | REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CERAMIC TILES AT SHOWER WALL IN THE BATHROOM LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 4H | May 17, 2021 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 4H | May 17, 2021 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CLOSET DOORS IN THE PRIVATE HALLWAY LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | — | Apr 30, 2021 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT ENTRANCE DOOR TO BUILDING , 1st STORY |
| Class A | Closed | — | Apr 30, 2021 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, EAST AND WEST WALLS AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 1G | Apr 27, 2021 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE BATHROOM LOCATED AT APT 1G, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT EAST |
| Class A | Closed | 1G | Apr 27, 2021 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1G, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT EAST |
| Class A | Closed | — | Apr 5, 2021 | FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. |
| Class A | Closed | 2L | Mar 30, 2021 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD BOTTOM AT EAST WALL CABINET IN THE KITCHEN LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT EAST |
| Class A | Closed | 2L | Mar 30, 2021 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH AND WEST WALLS IN THE 1st ROOM FROM EAST LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT EAST |
| Class A | Closed | 1M | Mar 12, 2021 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 1M, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST |
| Class A | Closed | 1M | Mar 12, 2021 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE GROUT AT TILES AT EAST AND SOUTH WALLS IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 1M, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST |
| Class A | Closed | 1M | Mar 12, 2021 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT BYFOLD DOORS AT CLOSET IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1M, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST |
| Class A | Closed | 1M | Mar 12, 2021 | REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING MECHANICAL STOPPER IN BATHTUB IN THE 1st BATHROOM FROM EAST LOCATED AT APT 1M, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST |
| Class A | Closed | 1M | Mar 11, 2021 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT CLOSET DOORS IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 1M, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST |