stoop
MAP
LeaderboardAbout
Building SafetyHousing Conditions

3435 OLINVILLE AVENUE

Bronx · ZIP 10467 · BIN 2056937 · Williamsbridge-Olinville · Last violation Apr 30, 2026 · Last complaint Jun 3, 2026

NeighborhoodWilliamsbridge-Olinville
More violations than 96.5% of nearby buildings
More violations than 97% of buildings and more complaints than 99% of buildings in Williamsbridge-Olinville. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 295 violations · 506 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
75 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous75Class Bhazardous54
Housing Preservation & Development Violations
Total violations since 1989
2,225
59 per year avg.↑ Up 22% in the last 2 years (295 vs 241 prior 2 yrs)
Open violations
141
Class C (immed. haz.)ⓘ75
Class B (hazardous)ⓘ54
Rent-impairingⓘ54
Housing Preservation & Development Complaints
Total complaints since 2003
3,183
133 per year avg.↓ Down 13% in the last 2 years (506 vs 580 prior 2 yrs)
Complaint Resolution
No access11%Violation issued23%No violation31%Phone resolved34%Other0%(3,183)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ185 violations
Kitchen And Kitchenettesⓘ67 violations
Extermination & Rodent Eradicationⓘ61 violations
Egressⓘ54 violations
Water Supplyⓘ49 violations
Paintingⓘ33 violations
Smoke Detecting Devicesⓘ30 violations
Cleaningⓘ29 violations
Top complaint groupsⓘ
5 yrsAll time
Safety & fireⓘ256 complaints
Heat / hot waterⓘ242 complaints
Electricalⓘ200 complaints
Mold & pestsⓘ121 complaints
Bldg maintenanceⓘ119 complaints
Water & plumbingⓘ107 complaints
Appliancesⓘ61 complaints
Adminⓘ47 complaints
Elevatorⓘ8 complaints
Hide violations ↑See complaints →

Violation log

393 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt

Building safety complaints, construction, permits, and structural issues filed with the NYC Dept. of Buildings, are scored separately.

Building Safety →
See something wrong? File a complaint with 311
Open violation ages
▪ 30–90 days7% (10)
▪ 3–12 months30% (43)
▪ 1–3 years49% (69)
▪ 3+ years13% (19)
Prior 4 yr.
Immed. Emergency2%12%
Emergency70%59%
Non-Emergency29%29%
(56)
(1,156)
Issued
Description
Class AClosed5HFeb 22, 2011PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed5HFeb 22, 2011PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed3EFeb 8, 2011PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST, THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''3435'', 1st FROM WEST AT NORTH
Class AClosed3EFeb 8, 2011PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''3435'', 1st FROM WEST AT NORTH
Class AClosed3EFeb 8, 2011PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM SOUTH AT WEST WALL, 1st DUMB WAITER FROM WEST AT NORTH WALL, 1st CLOSET FROM WEST AT NORTH WALL DOOR IN THE FOYER LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''3435'', 1st FROM WEST AT NORTH
Class AClosed2GFeb 7, 2011REPAIR WITH SIMILAR MATERIAL · MAINTENANCESECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR UNDER RADIATOR IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2G, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
Class AClosed2GFeb 7, 2011PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 2nd ROOM FROM EAST AT NORTH, THE 1st ROOM FROM EAST AT SOUTH, THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2G, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
Class AClosed6GFeb 2, 2011PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE FOYER , THE KITCHEN , THE BATHROOM , THE 2nd ROOM FROM EAST AT NORTH, THE 1st ROOM FROM EAST AT SOUTH, THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6G, 6th STORY, 5th APARTMENT FROM NORTH AT EAST
Class AClosed4ENov 26, 2010REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT SOUTH WALL AND WEST WALL IN THE BATHROOM LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed6ENov 8, 2010PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed3ESep 7, 2010PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FRAME FROM NORTH AT EAST WALL, 1st CLOSET FROM WEST AT NORTH WALL DOOR, 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME IN THE FOYER LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH''
Class AClosed3ESep 7, 2010PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 4th ROOM FROM EAST LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH''
Class AClosed3ESep 7, 2010PAINT METAL · PAINTINGSECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DUMB WAITER FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH''
Class AClosed4eJun 18, 2010REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 4e, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed4eJun 18, 2010REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE BATHROOM LOCATED AT APT 4e, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed3EJun 7, 2010PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE FOYER LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed3EJun 7, 2010PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST, THE 1st PRIVATE HALLWAY FROM EAST, THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed3EJun 7, 2010PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed3FApr 15, 2010PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL CEILING, 2nd CLOSET FROM EAST AT SOUTH WALL WALL IN THE FOYER LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
Class AClosed6CApr 9, 2010PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST, THE BATHROOM LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed2FMar 26, 2010PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed5AFeb 9, 2010PAINT METAL · PAINTINGSECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed5AFeb 9, 2010PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 1st DOOR FROM WEST AT NORTH WALL, WEST WALL IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed5AFeb 9, 2010PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST, THE PRIVATE HALLWAY , THE FOYER , THE 1st ROOM FROM EAST LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed2FJan 11, 2010PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS IN THE 1st ROOM FROM EAST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
Class AClosed1HJan 11, 2010FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION PARTITION WALL ERRECTED WITH DOOR CREATING ADDITIONAL ROOM IN THE 1st ROOM FROM EAST LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed1JJan 11, 2010FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION PARTITION WALL ERRECTED FROM FLOOR TO CEILING WITH DOOR CREATING ADDITIONAL ROOM IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 1J, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed2FJan 11, 2010REPAIR WITH SIMILAR MATERIAL · MAINTENANCESECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN FINISH AT BATHTUB IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
Class AClosed5HDec 3, 2009PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE KITCHEN LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
Class AClosed5HOct 28, 2009PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
Class AClosed2BOct 5, 2009PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE PRIVATE HALLWAY , THE 3rd ROOM FROM EAST AT NORTH, THE 3rd ROOM FROM EAST AT SOUTH, THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed6BJul 15, 2009PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. 1st RADIATOR FROM SOUTH AT WEST WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed6BJul 15, 2009PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. CEILING, 1st RADIATOR FROM NORTH AT EAST WALL, 1st RISER FROM NORTH AT EAST WALL, EAST WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed6BJul 15, 2009PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. SOUTH WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed5AJun 4, 2009PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST, THE 1st ROOM FROM EAST, THE PRIVATE HALLWAY , THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed6BOct 29, 2008PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 1st DOOR FROM SOUTH AT WEST WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
Class AClosed6BOct 29, 2008PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
Class AClosed2ASep 30, 2008PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, EAST WALL IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed2AApr 23, 2007PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE PRIVATE HALLWAY LOCATED AT APT 2A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed2JNov 9, 2006PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST, THE 3rd ROOM FROM EAST AT NORTH, THE BATHROOM , THE KITCHEN , THE FOYER LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed2DJun 23, 2004PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CLG BATHROOM AND KITCHEN 2ND STY NORTHWEST APT 2D NORTH SECTION. , SECTION '' ''
Class AClosed3BJun 23, 2004REPAIR · MAINTENANCESECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE OR REFIT DOOR 3 STY NORTHWEST APT 3B BATHROOM. , SECTION '' ''
Class AClosed3DJun 23, 2004REPAIR · MAINTENANCED26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE & OR REFIT WOOD CABINET DOORS 3RD STY EAST APT 3D KITCHEN NORTH SECTION. , SECTION '' ''
Class AClosed
Feb 22, 2011Apt 5H
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed
Feb 22, 2011Apt 5H
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed
Feb 8, 2011Apt 3E
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST, THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''3435'', 1st FROM WEST AT NORTH
Class AClosed
Feb 8, 2011Apt 3E
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE KITCHEN LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''3435'', 1st FROM WEST AT NORTH
Class AClosed
Feb 8, 2011Apt 3E
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM SOUTH AT WEST WALL, 1st DUMB WAITER FROM WEST AT NORTH WALL, 1st CLOSET FROM WEST AT NORTH WALL DOOR IN THE FOYER LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''3435'', 1st FROM WEST AT NORTH
Class AClosed
Feb 7, 2011Apt 2G
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR UNDER RADIATOR IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2G, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
Class AClosed
Feb 7, 2011Apt 2G
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 2nd ROOM FROM EAST AT NORTH, THE 1st ROOM FROM EAST AT SOUTH, THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2G, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
Class AClosed
Feb 2, 2011Apt 6G
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE FOYER , THE KITCHEN , THE BATHROOM , THE 2nd ROOM FROM EAST AT NORTH, THE 1st ROOM FROM EAST AT SOUTH, THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6G, 6th STORY, 5th APARTMENT FROM NORTH AT EAST
Class AClosed
Nov 26, 2010Apt 4E
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT SOUTH WALL AND WEST WALL IN THE BATHROOM LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Nov 8, 2010Apt 6E
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 6th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed
Sep 7, 2010Apt 3E
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FRAME FROM NORTH AT EAST WALL, 1st CLOSET FROM WEST AT NORTH WALL DOOR, 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME IN THE FOYER LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH''
Class AClosed
Sep 7, 2010Apt 3E
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 4th ROOM FROM EAST LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH''
Class AClosed
Sep 7, 2010Apt 3E
PAINT METAL · PAINTING
SECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DUMB WAITER FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''NORTH''
Class AClosed
Jun 18, 2010Apt 4e
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 4e, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Jun 18, 2010Apt 4e
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE BATHROOM LOCATED AT APT 4e, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Jun 7, 2010Apt 3E
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE FOYER LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Jun 7, 2010Apt 3E
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST, THE 1st PRIVATE HALLWAY FROM EAST, THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Jun 7, 2010Apt 3E
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Apr 15, 2010Apt 3F
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL CEILING, 2nd CLOSET FROM EAST AT SOUTH WALL WALL IN THE FOYER LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
Class AClosed
Apr 9, 2010Apt 6C
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST, THE BATHROOM LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed
Mar 26, 2010Apt 2F
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed
Feb 9, 2010Apt 5A
PAINT METAL · PAINTING
SECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed
Feb 9, 2010Apt 5A
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 1st DOOR FROM WEST AT NORTH WALL, WEST WALL IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed
Feb 9, 2010Apt 5A
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST, THE PRIVATE HALLWAY , THE FOYER , THE 1st ROOM FROM EAST LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed
Jan 11, 2010Apt 2F
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS IN THE 1st ROOM FROM EAST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
Class AClosed
Jan 11, 2010Apt 1H
FILE PLANS OR RESTORE · ALTERATIONS
§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION PARTITION WALL ERRECTED WITH DOOR CREATING ADDITIONAL ROOM IN THE 1st ROOM FROM EAST LOCATED AT APT 1H, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed
Jan 11, 2010Apt 1J
FILE PLANS OR RESTORE · ALTERATIONS
§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION PARTITION WALL ERRECTED FROM FLOOR TO CEILING WITH DOOR CREATING ADDITIONAL ROOM IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 1J, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed
Jan 11, 2010Apt 2F
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
SECTION 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN FINISH AT BATHTUB IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH
Class AClosed
Dec 3, 2009Apt 5H
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE KITCHEN LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
Class AClosed
Oct 28, 2009Apt 5H
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
Class AClosed
Oct 5, 2009Apt 2B
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE PRIVATE HALLWAY , THE 3rd ROOM FROM EAST AT NORTH, THE 3rd ROOM FROM EAST AT SOUTH, THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed
Jul 15, 2009Apt 6B
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. 1st RADIATOR FROM SOUTH AT WEST WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed
Jul 15, 2009Apt 6B
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. CEILING, 1st RADIATOR FROM NORTH AT EAST WALL, 1st RISER FROM NORTH AT EAST WALL, EAST WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed
Jul 15, 2009Apt 6B
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. SOUTH WALL IN THE FOYER LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed
Jun 4, 2009Apt 5A
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST, THE 1st ROOM FROM EAST, THE PRIVATE HALLWAY , THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed
Oct 29, 2008Apt 6B
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 1st DOOR FROM SOUTH AT WEST WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
Class AClosed
Oct 29, 2008Apt 6B
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
Class AClosed
Sep 30, 2008Apt 2A
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, EAST WALL IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed
Apr 23, 2007Apt 2A
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE PRIVATE HALLWAY LOCATED AT APT 2A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed
Nov 9, 2006Apt 2J
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST, THE 3rd ROOM FROM EAST AT NORTH, THE BATHROOM , THE KITCHEN , THE FOYER LOCATED AT APT 2J, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed
Jun 23, 2004Apt 2D
PAINT · PAINTING
SECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CLG BATHROOM AND KITCHEN 2ND STY NORTHWEST APT 2D NORTH SECTION. , SECTION '' ''
Class AClosed
Jun 23, 2004Apt 3B
REPAIR · MAINTENANCE
SECTION 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE OR REFIT DOOR 3 STY NORTHWEST APT 3B BATHROOM. , SECTION '' ''
Class AClosed
Jun 23, 2004Apt 3D
REPAIR · MAINTENANCE
D26-10.01 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE & OR REFIT WOOD CABINET DOORS 3RD STY EAST APT 3D KITCHEN NORTH SECTION. , SECTION '' ''
Page 8 of 8
← Prev