stoop
Map
LeaderboardAbout
Building SafetyHousing Conditions

3764 BRONX BOULEVARD

Bronx · ZIP 10467 · BIN 2057437 · Williamsbridge-Olinville · Last violation May 20, 2026 · Last complaint May 29, 2026

NeighborhoodWilliamsbridge-Olinville
More violations than 95.7% of nearby buildings
More violations than 96% of buildings and more complaints than 97% of buildings in Williamsbridge-Olinville. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 419 violations · 439 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
34 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous34Class Bhazardous58
Housing Preservation & Development Violations
Total violations since 1992
1,715
49 per year avg.↑ Up 50% in the last 2 years (419 vs 280 prior 2 yrs)
Open violations
106
Class C (immed. haz.)ⓘ34
Class B (hazardous)ⓘ58
Rent-impairingⓘ5
Housing Preservation & Development Complaints
Total complaints since 2003
2,900
121 per year avg.↑ Up 124% in the last 2 years (439 vs 196 prior 2 yrs)
Complaint Resolution
No access17%Violation issued28%No violation28%Phone resolved26%Other1%(2,900)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ274 violations
Extermination & Rodent Eradicationⓘ125 violations
Paintingⓘ59 violations
Cleaningⓘ59 violations
Egressⓘ54 violations
Carbon Monoxide Detecting Devicesⓘ45 violations
Water Supplyⓘ45 violations
Smoke Detecting Devicesⓘ44 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ243 complaints
Mold & pestsⓘ135 complaints
Bldg maintenanceⓘ84 complaints
Water & plumbingⓘ71 complaints
Electricalⓘ42 complaints
Appliancesⓘ39 complaints
Elevatorⓘ17 complaints
Safety & fireⓘ7 complaints
Outdoor / structuralⓘ1 complaints
Adminⓘ1 complaints
Hide violations ↑See complaints →

Violation log

351 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt

Building safety complaints, construction, permits, and structural issues filed with the NYC Dept. of Buildings, are scored separately.

Building Safety →
See something wrong? File a complaint with 311
Open violation ages
▪ < 30 days6% (6)
▪ 30–90 days11% (12)
▪ 3–12 months56% (59)
▪ 1–3 years17% (18)
▪ 3+ years10% (11)
Prior 4 yr.
Immed. Emergency3%3%
Emergency53%67%
Non-Emergency44%30%
(238)
(467)
Issued
Description
Class AClosed6CMar 5, 2025TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THEN 10 SQ FT AT NORTH WALL, EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed6CMar 5, 2025TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THEN 10 SQ FT AT EAST WALL IN THE BATHROOM LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed6CMar 5, 2025TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THEN 10 SQ FT AT WEST WALL, NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed6CFeb 5, 2025TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL UNDER 10 SQ FT IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed6CFeb 5, 2025TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL UNDER 10 SQ FT IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed6CJan 29, 2025REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed6CJan 29, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEATING RISER PIPE IN THE BATHROOM LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed6CJan 29, 2025TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT NORTH & WEST WALLS IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed—Jan 9, 2025REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT DOOR AT THE BULKHEAD IN THE PUBLIC HALL STAIRS LOCATED AT PUBLIC PARTS, 6th STORY, 1st PUBLIC PARTS FROM EAST AT SOUTH
Class AClosed6HJan 9, 2025REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT DOOR IN THE ENTRANCE LOCATED AT APT 6H, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTH
Class AClosed2EJan 6, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AOpen2EDec 12, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed2EDec 12, 2024REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GROUT AROUND WASHBASIN IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed2EDec 12, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd PRIVATE HALLWAY , THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed1HNov 4, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE KITCHEN LOCATED AT APT 1H, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH''
Class AClosed1HNov 4, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE KITCHEN , THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 1H, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH''
Class AClosed1FNov 4, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed6COct 7, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE BATHROOM LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH''
Class AClosed6COct 7, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WOOD CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''NORTH''
Class AClosed—Aug 26, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT NORTH SECTION AT PUBLIC HALL, 6th STORY
Class AClosed—Aug 26, 2024CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE DIRT AND GRIME AT ALL FLOORS AND STAIRS AT ALL STORIES AT PUBLIC HALL
Class AClosed6DAug 23, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE BATHROOM LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
Class AClosed6DAug 23, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WEST WALL IN THE FOYER LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
Class AClosed6DAug 23, 2024PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION ALL STEAM RADIATORS AND RISER PIPES IN THE ENTIRE APARTMENT LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
Class AClosed5EAug 22, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CAULKING AROUND THE BATHTUB IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''NORTH''
Class AClosed—Aug 1, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY
Class AClosed—Aug 1, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT VESTIBULE CEILING
Class AClosed6CJul 30, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST WALL LESS THAN 10 SQ.FT IN THE BATHROOM LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed1HMay 2, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 1H, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM EAST AT SOUTH
Class AClosed1HMay 2, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT 1st CLOSET FROM NORTH AT EAST WALL WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 1H, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , 1st SECTION FROM EAST AT SOUTH
Class AClosed—Apr 18, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN VESTIBULE , 1st STORY
Class AClosed2JApr 11, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
Class AClosed2JApr 11, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILINGS, WALLS, DOORS AND TRIM IN THE ENTIRE APARTMENT LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH''
Class AClosed—Mar 27, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND SOUTH WALL AT VESTIBULE
Class AClosed2AFeb 9, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class AClosed2AFeb 9, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... ON CEILING APPROX 6 SQ FT IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class AClosed2AFeb 5, 2024REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class AClosed2AFeb 5, 2024REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class AClosed2AFeb 5, 2024REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CLOSET DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class AClosed2AFeb 5, 2024REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH''
Class AClosed3BNov 13, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed2DOct 30, 2023PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION STEAM RISE PIPE IN THE 1st ROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
Class AClosed2DOct 30, 2023TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... ON CEILING APPROX. 2 SQ.FT AND SOUTH WALL APPROX. 2 SQ.FT IN THE 1st ROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
Class AClosed2DOct 30, 2023REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGROUT CERAMIC TILES AT NORTH AND EAST WALLS IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
Class AClosed2DOct 30, 2023TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... ON CEILING APPROXIMATELY 2 SQ FT IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
Class AClosed2EOct 11, 2023REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''3764'', 1st FROM WEST AT NORTH
Class AClosed2EOct 11, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''3764'', 1st FROM WEST AT NORTH
Class AClosed2EOct 11, 2023TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 2 SQUARE FEET AT CEILING IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''3764'', 1st FROM WEST AT NORTH
Class AClosed2EOct 11, 2023REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES FLOOR IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''3764'', 1st FROM WEST AT NORTH
Class AClosed2EOct 11, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd PRIVATE HALLWAY , THE 1st ROOM FROM EAST AT SOUTH, THE FOYER , THE 1st PRIVATE HALLWAY LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''3764'', 1st FROM WEST AT NORTH
Page 2 of 8
← PrevNext →