stoop
Map
LeaderboardAbout
Building SafetyHousing Conditions

624 EAST 222 STREET

Bronx · ZIP 10467 · BIN 2057644 · Williamsbridge-Olinville · Last violation May 21, 2026 · Last complaint May 20, 2026

NeighborhoodWilliamsbridge-Olinville
More violations than 91.9% of nearby buildings
More violations than 92% of buildings and more complaints than 93% of buildings in Williamsbridge-Olinville. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 177 violations · 172 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
8 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous8Class Bhazardous13
Housing Preservation & Development Violations
Total violations since 1987
885
22 per year avg.↓ Down 24% in the last 2 years (177 vs 232 prior 2 yrs)
Open violations
31
Class C (immed. haz.)ⓘ8
Class B (hazardous)ⓘ13
Rent-impairingⓘ2
Open violation ages
▪ < 30 days11% (3)
▪ 30–90 days54% (15)
▪ 3–12 months7% (2)
▪ 1–3 years11% (3)
▪ 3+ years18% (5)
Housing Preservation & Development Complaints
Total complaints since 2003
1,483
62 per year avg.↓ Down 14% in the last 2 years (172 vs 200 prior 2 yrs)
Complaint Resolution
No access16%Violation issued34%No violation25%Phone resolved25%Other0%(1,483)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ184 violations
Extermination & Rodent Eradicationⓘ75 violations
Paintingⓘ42 violations
Egressⓘ41 violations
Cleaningⓘ27 violations
Heat And Hot Waterⓘ21 violations
Water Supplyⓘ20 violations
Lead-Based Paintⓘ12 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ163 complaints
Mold & pestsⓘ70 complaints
Bldg maintenanceⓘ67 complaints
Water & plumbingⓘ55 complaints
Appliancesⓘ21 complaints
Electricalⓘ16 complaints
Safety & fireⓘ6 complaints
Hide violations ↑See complaints →

Violation log

192 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt

Building safety complaints, construction, permits, and structural issues filed with the NYC Dept. of Buildings, are scored separately.

Building Safety →
See something wrong? File a complaint with 311
Prior 4 yr.
Immed. Emergency1%3%
Emergency74%58%
Non-Emergency25%38%
(89)
(353)
Issued
Description
Class AClosed3GSep 24, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME, 1st CLOSET FROM EAST AT SOUTH WALL DOOR IN THE 2nd PRIVATE HALLWAY FROM EAST LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed3GSep 24, 2020PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DOOR FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE FOYER LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed3GSep 24, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME, 1st CLOSET FROM SOUTH AT WEST WALL DOOR IN THE FOYER LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed4DOct 31, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed4DOct 31, 2019TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 1 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed4DAug 29, 2019TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 1.SQ.FT. AT CEILING IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed4DJul 15, 2019REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed—Apr 25, 2019PAINT METAL · PAINTING§ 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT THE EAST ,WEST AND CENTER FIRE ESCAPES AT BUILDING FRONT
Class AClosed—Apr 24, 2019PAINT METAL · PAINTING§ 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL COMPONENTS AT ALL STORY BALCONIES AT FIRE ESCAPE AT BUILDING WEST EXTERIOR WALL
Class AClosed—Apr 24, 2019PAINT METAL · PAINTING§ 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL COMPONENTS AT ALL STORY BALCONIES AT 2ND FIRE ESCAPE FROM EAST AT BUILDING NORTH EXTERIOR WALL
Class AClosed—Apr 24, 2019PAINT METAL · PAINTING§ 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL COMPONENTS AT ALL STORY BALCONIES AT 1ST FIRE ESCAPE FROM EAST AT BUILDING NORTH EXTERIOR WALL
Class AClosed—Apr 24, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, NORTH, SOUTH AND WEST WALLS AT BULKHEAD PUBLIC HALL STAIRS
Class AClosed4GApr 2, 2019REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd PRIVATE HALLWAY FROM EAST LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed4GApr 1, 2019REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE BATHROOM LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed4GApr 1, 2019REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 4G, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed5ADec 27, 2018PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE PRIVATE HALLWAY , THE 4th ROOM FROM NORTH, THE KITCHEN , THE BATHROOM LOCATED AT APT 5A, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed5ADec 27, 2018PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5A, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed5ADec 27, 2018REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5A, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed5ADec 27, 2018REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BASE CABINET DOORS AT NORTH IN THE KITCHEN LOCATED AT APT 5A, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed—Oct 17, 2018PAINT METAL · PAINTING§ 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL BALCONIES ALL STYS AT FIRE ESCAPE
Class AClosed5BAug 22, 2018PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
Class AClosed5BAug 22, 2018PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE FOYER LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
Class AClosed5BAug 22, 2018PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, NORTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
Class AClosed5BAug 22, 2018PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, EAST WALL, WEST WALL IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
Class AClosed5BAug 22, 2018PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
Class AClosed5BAug 22, 2018PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
Class AClosed—May 11, 2018PAINT METAL · PAINTING§ 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT THE FIRE ESCAPES, FRONT STACKS, ALL STORIES.
Class AClosed6DMay 7, 2018PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST AT SOUTH, THE 1st ROOM FROM EAST AT SOUTH, THE BATHROOM , THE PRIVATE HALLWAY LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed6DMay 7, 2018PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE KITCHEN LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed—Mar 29, 2018PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY
Class AClosed1GMar 29, 2018RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE MARBLE DOOR SADDLE AT EAST DOOR IN THE BATHROOM LOCATED AT APT 1G, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST''
Class AClosed—Mar 20, 2018PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT FIRE RETARDANT PAINT AT THE LOBBY CEILING.
Class AClosed2CMay 31, 2016REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH AND WEST WALL IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH
Class AClosed3GMar 23, 2015REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING DOOR HANDLE AT ENTRANCE DOOR IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed3GMar 23, 2015REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD ENTRANCE DOOR IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed3GMar 23, 2015REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING DOOR HANDLE AT ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed3GMar 23, 2015REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed3GMar 23, 2015REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE FOYER LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed6GJan 2, 2015PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE KITCHEN LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed6GDec 24, 2014REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CLOSET DOORS IN THE FOYER LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed6GDec 24, 2014REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ENTRANCE DOOR DOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed2COct 2, 2012REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT NORTH WALL IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AOpen—Sep 26, 2012WHITEWASH OR PAINT (CELLAR) · PAINTING§ 27-2081 ADM CODE THOROUGHLY WHITEWASH OR PAINT WITH A LIGHT COLOR THE SURFACES ALL WALLS AND CEILING IN BOILER ROOM AT BASEMENT
Class AOpen—Sep 25, 2012WHITEWASH OR PAINT (CELLAR) · PAINTING§ 27-2081 ADM CODE THOROUGHLY WHITEWASH OR PAINT WITH A LIGHT COLOR THE SURFACES ALL WALLS AND CEILINGS THRU OUT AT BASEMENT
Class AClosed6GSep 25, 2012REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE PRIVATE HALLWAY LOCATED AT APT 6G, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed2BSep 19, 2012REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR AROUND THE ENTRANCE IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 2B, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH
Class AClosed2BSep 19, 2012REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MARBLE SADDLE IN THE ENTRANCE LOCATED AT APT 2B, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH
Class AClosed1DJul 23, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE BATHROOM , THE FOYER , THE 3rd ROOM FROM NORTH AT EAST, THE 3rd ROOM FROM NORTH AT WEST, THE KITCHEN LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed1DJun 6, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE BATHROOM , THE PRIVATE HALLWAY , THE FOYER , THE 3rd ROOM FROM NORTH AT EAST, THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed2BNov 9, 2011TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT EAST
Page 3 of 4
← PrevNext →