| Class A | Closed | 11J | Apr 14, 2014 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 11J, 11th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 1M | Apr 7, 2014 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 1M, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Class A | Closed | 11J | Mar 14, 2014 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE METAL DOOR FRAME IN THE BATHROOM LOCATED AT APT 11J, 11th STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | PHB | Jan 31, 2014 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT THE CLOSET DOORS IN THE PRIVATE HALLWAY LOCATED AT APT PHB, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 12C | Jan 27, 2014 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT EAST, THE 2nd ROOM FROM NORTH AT WEST, THE 1st ROOM FROM NORTH AT WEST, THE FOYER LOCATED AT APT 12C, 12th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 11E | Jan 23, 2014 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SADDLE AT DOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 11E, 12th STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 11E | Jan 23, 2014 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 11E, 12th STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 8L | Jan 13, 2014 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL, CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8L, 9th STORY, 5th APARTMENT FROM WEST AT NORTH , SECTION AT EAST |
| Class A | Closed | 8L | Jan 13, 2014 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE BATHROOM , THE KITCHEN , THE PRIVATE HALLWAY , THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 8L, 9th STORY, 5th APARTMENT FROM WEST AT NORTH , SECTION AT EAST |
| Class A | Closed | PHB | Jul 29, 2013 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEMENT FLOOR IN THE FOYER LOCATED AT APT PHB, 14th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 9K | Jul 29, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 9K, 9th STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | PHL | Jul 24, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT PHL, 14th STORY, 5th APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 12C | Jul 1, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT WEST, THE 2nd ROOM FROM NORTH AT EAST, THE 1st ROOM FROM NORTH AT WEST, THE 1st PRIVATE HALLWAY FROM NORTH, THE 2nd PRIVATE HALLWAY FROM NORTH, THE FOYER , THE BATHROOM LOCATED AT APT 12C, 13th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | PHL | Jul 1, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH AT WEST, THE 1st PRIVATE HALLWAY FROM NORTH, THE FOYER , THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT PHL, 14th STORY, 5th APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 11B | Jun 4, 2013 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT DOOR IN THE ENTRANCE LOCATED AT APT 11B, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH |
| Class A | Closed | 11B | May 14, 2013 | REPAIR BROKEN, LOOSE CONNECTION · SEWERS AND DRAINAGE§ 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE LINE DRAIN PIPE AT WASH BASIN IN THE BATHROOM LOCATED AT APT 11B, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 11B | May 14, 2013 | REPAIR LEAKY FAUCETS · WATER SUPPLY§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS WASH BASIN IN THE BATHROOM LOCATED AT APT 11B, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 11E | May 13, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT WEST, THE KITCHEN LOCATED AT APT 11E, 12th STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 8C | Feb 27, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT EAST, THE 2nd ROOM FROM NORTH AT WEST, THE KITCHEN LOCATED AT APT 8C, 8th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 12C | Feb 7, 2013 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT WEST WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 12C, 12th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 12C | Feb 7, 2013 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... ATWEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 12C, 12th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 12C | Feb 7, 2013 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT WALLS IN THE BATHROOM LOCATED AT APT 12C, 12th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 12C | Feb 7, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 12C, 12th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 6H | Jan 2, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS, WALLS, DOORS AND TRIMS IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 6H | Dec 6, 2012 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION ENTRANCE DOOR AND FRAME IN THE ENTRANCE LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 6H | Dec 6, 2012 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WEST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 6H | Dec 6, 2012 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WEST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 6H | Dec 6, 2012 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST WALL IN THE KITCHEN LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH |
| Class A | Closed | 11E | Sep 17, 2012 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE 1st ROOM FROM NORTH AT WEST, THE 2nd ROOM FROM NORTH AT EAST, THE FOYER LOCATED AT APT 11E, 12th STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 9B | Sep 6, 2012 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE BATHROOM LOCATED AT APT 9B, 9th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 1J | Jun 1, 2012 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT THE DOOR IN THE ENTRANCE LOCATED AT APT 1J, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 1J | Jun 1, 2012 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST AT SOUTH, THE 3rd ROOM FROM EAST AT SOUTH, THE 3rd ROOM FROM EAST AT NORTH, THE KITCHEN , THE BATHROOM , THE FOYER , THE PRIVATE HALLWAY LOCATED AT APT 1J, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 2E | Apr 30, 2012 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 2E | Apr 25, 2012 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 3rd ROOM FROM EAST AT NORTH, THE BATHROOM , THE PRIVATE HALLWAY LOCATED AT APT 2E, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 7F | Apr 9, 2012 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INTERCOM IN THE ENTIRE APARTMENT LOCATED AT APT 7F, 7th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 11B | Apr 6, 2012 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT THE DOOR IN THE ENTRANCE LOCATED AT APT 11B, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 2E | Mar 27, 2012 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE BATHROOM , THE 1st ROOM FROM NORTH AT WEST, THE 2nd ROOM FROM NORTH AT WEST, THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2E, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 11E | Mar 2, 2012 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH AT WEST, THE 2nd ROOM FROM NORTH AT WEST, THE FOYER , THE BATHROOM LOCATED AT APT 11E, 12th STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 2E | Feb 15, 2012 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT WEST, THE 1st ROOM FROM NORTH AT WEST, THE FOYER , THE KITCHEN , THE BATHROOM LOCATED AT APT 2E, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | PH-E | Dec 20, 2011 | RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE DOOR SWEEP IN THE ENTRANCE LOCATED AT APT PH-E, 14th STORY, 4th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | — | Dec 9, 2011 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ....LATCH AT MAIL BOX LOCK FOR APT.#3B AT PUBLIC HALL, 1st STORY |
| Class A | Closed | — | Jun 1, 2011 | PAINT · PAINTING§ 27-2013 ADM CODE NO DECORATING IN 3 YEARS. PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AT METER ROOM, 1st STORY |
| Class A | Closed | 3M | Aug 23, 2010 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 3M, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Class A | Closed | 3B | Mar 5, 2010 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS IN THE 2nd ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 6A | Nov 2, 2009 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd PRIVATE HALLWAY , THE BATHROOM , THE 2nd ROOM FROM EAST LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 3M | May 5, 2009 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT CLOSET DOORS IN THE 1st ROOM FROM EAST LOCATED AT APT 3M, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 11E | Apr 28, 2009 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SPRING BALANCE AT UPPER SASH WINDOW IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 11E, 11th STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | — | Nov 20, 2008 | IV-1. MAILBOXES PRESENT · POSTING/SIGNAGE§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR ..... AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 8M | Jul 21, 2008 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT CLOSET DOOR IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 8M, 8th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | — | May 27, 2008 | FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING AT LOBBY, 1st STORY |