| Class A | Open | 7A | May 21, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 7A, 7th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Open | 7A | May 21, 2026 | RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 7A, 7th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Open | 7A | May 21, 2026 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FEET AT AROUND THE BATHTUB IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 7A, 7th STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | OpenRENT IMPAIRING | 8E | May 18, 2026 | REPAIR FLUSHING APPARATUS OF WATER CLOSET · SEWERS AND DRAINAGE§ 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 8E, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Open | 8E | May 18, 2026 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BOTTOM SHELF AT WASHBASIN CABINET IN THE BATHROOM LOCATED AT APT 8E, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Open | — | May 7, 2026 | POST GAS LEAK NOTICE · POSTING/SIGNAGE§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED, 1st STORY |
| Class A | Open | 3B | May 7, 2026 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT SOUTH WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Open | 3B | May 7, 2026 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL VENT AT CEILING IN THE 2nd BATHROOM FROM NORTH AT WEST LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Open | 3B | May 7, 2026 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE OUTLET COVER AT EAST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Open | 3F | Apr 21, 2026 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Open | 3F | Apr 21, 2026 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Open | 11B | Apr 1, 2026 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT. AT CEILING AND WALLS IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 11B, 11th STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class A | Open | 11B | Apr 1, 2026 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DRAWER AT BASE CABINET ON WEST WALL IN THE KITCHEN LOCATED AT APT 11B, 11th STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class A | Open | 11B | Apr 1, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 11B, 11th STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class A | Open | — | Mar 30, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY |
| Class A | Open | 6C | Mar 26, 2026 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WASHBASIN CABINET IN THE BATHROOM LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Open | 6C | Mar 25, 2026 | REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING DRAIN GRATE AT BATH TUB IN THE BATHROOM LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Open | 6C | Mar 23, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE BATHROOM LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | ClosedRENT IMPAIRING | 8D | Feb 2, 2026 | REPAIR FLUSHING APPARATUS OF WATER CLOSET · SEWERS AND DRAINAGE§ 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 8D, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Open | 3H | Jan 22, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 3H, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Open | 7L | Dec 12, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 7L, 7th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Open | 11B | Dec 1, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE VENTILATION SYSTEM AT CEILING IN THE BATHROOM LOCATED AT APT 11B, 11th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Open | 11B | Dec 1, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 11B, 11th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 3H | Nov 7, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET COVER AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 3H, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 3H | Nov 7, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL CEILINGS ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 3H, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Open | 3H | Nov 7, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH BY METHOD OF REGLAZING AT BATHTUB IN THE BATHROOM LOCATED AT APT 3H, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 3C | Oct 21, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ.FEET AT CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 11E | Sep 29, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 11E, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 11E | Sep 29, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE FOYER LOCATED AT APT 11E, 11th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 9B | Sep 5, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 9B, 9th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 8D | Sep 5, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE RECALK AROUND THE WASHBASIN IN THE BATHROOM LOCATED AT APT 8D, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 3G | Sep 5, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 3G, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class A | ClosedRENT IMPAIRING | 5J | Sep 5, 2025 | REPLACE DEFECTIVE SINK, WATER CLOSET, WASH TUB · SEWERS AND DRAINAGE§ 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE AT WATER CLOSET IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 5th APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 9B | Sep 5, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE RECALK AROUND THE SHOWER STALL IN THE 2nd BATHROOM FROM NORTH AT WEST LOCATED AT APT 9B, 9th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 9B | Sep 5, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL STOPPER AT WASHBASIN IN THE BATHROOM LOCATED AT APT 9B, 9th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 8D | Sep 5, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE TILT LATCH AT LOWER WINDOW SASH IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 8D, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 9B | Sep 5, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS DOOR AND FRAME AT SHOWER STALL IN THE 2nd BATHROOM FROM NORTH AT WEST LOCATED AT APT 9B, 9th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 9B | Sep 5, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ENTRANCE DOOR IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 9B, 9th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 8D | Sep 5, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WINDOW FRAME AT WEST IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 8D, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 3G | Sep 5, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH IN THE 2nd ROOM FROM EAST LOCATED AT APT 3G, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 9B | Sep 5, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ENTRANCE DOOR IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 9B, 9th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | — | Sep 5, 2025 | POST SIGN INDICATING NAME AND ADDRESS OF JANITOR, ETC. · POSTING/SIGNAGE§ 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. |
| Class A | Closed | 9B | Sep 5, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CABINET DRAWERS AT SINK IN THE KITCHEN LOCATED AT APT 9B, 9th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 9B | Sep 5, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MECHANICAL STOPPER AT WASHBASIN IN THE 2nd BATHROOM FROM NORTH AT WEST LOCATED AT APT 9B, 9th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 9B | Sep 5, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGLAZE PORCELAIN FINISH AT BATHTUB IN THE BATHROOM LOCATED AT APT 9B, 9th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Open | 8B | Aug 18, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS AND CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 8B, 8th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Open | 8B | Aug 18, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 8B, 8th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 6C | Aug 15, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE VENTILATION SYSTEM AT CEILING IN THE BATHROOM LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | — | Aug 15, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURES AT CEILING AT PUBLIC HALL, 6th STORY |
| Class A | Closed | 6C | Aug 15, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH |