| Class A | Open | — | May 21, 2026 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 4th STORY |
| Class A | Open | — | Apr 8, 2026 | RENT STABILIZATION LAW INFORMATION SIGN · POSTING/SIGNAGE§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMATION/REQUIRED-SIGNAGE.PAGE |
| Class A | Open | — | Mar 30, 2026 | RENT STABILIZATION LAW INFORMATION SIGN · POSTING/SIGNAGE§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMATION/REQUIRED-SIGNAGE.PAGE |
| Class A | Closed | 1R | Dec 29, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1R | Nov 19, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAT 10 SQ FT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 1R | Nov 18, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THEN 10 SQ FT AT WEST WALL IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1R | Oct 30, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT NORTH WALL IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 1R | Aug 8, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 1R | Aug 8, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 1R | Feb 27, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1R | Feb 12, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1R | Feb 12, 2025 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM AT SOUTH WALL IN THE FOYER LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1R | Oct 15, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 1R | Jun 27, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD WINDOW STOOL. IN THE KITCHEN LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1R | Jun 27, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB. IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1R | May 23, 2024 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE MOLD AT CERAMIC WALL TILES AROUND THE BATHTUB IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 1R | May 6, 2024 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING ENTRANCE TO RETURN BUZZER AT SOUTH WALL IN THE FOYER LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1R | Apr 25, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 5 SQ.FT AT AT EAST AND NORTH WALL IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 1R | Apr 16, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1R | Jan 22, 2024 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT NORTH WALL IN THE KITCHEN LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | — | Nov 16, 2023 | IV-1. MAILBOXES PRESENT · POSTING/SIGNAGE§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR . AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 1R | Aug 10, 2023 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE RE-GLAZE BATHTUB IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | — | Aug 10, 2023 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD CORNICE AT WEST AT CORNICE |
| Class A | Closed | — | Mar 21, 2023 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT BUILDING FRONT ENTRANCE DOOR , 1st STORY |
| Class A | Closed | 1R | Dec 27, 2022 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 1 SQ. FT. AT NORTH WALL IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1R | Dec 27, 2022 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH WALL IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1R | May 19, 2022 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1R | May 19, 2022 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE FOYER LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1R | Feb 28, 2022 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX. 2 SQ. FT., WEST WALL, 2 SQ. FT. IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | — | Aug 9, 2021 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE TRASH STAGING CONTAINER AT FFRONT OF BUILDING YARD |
| Class A | Closed | — | Aug 9, 2021 | ABATE THE NUISANCE · MAINTENANCE§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF OVERGROWN GRASS AT FRONT YARD YARD |
| Class A | Closed | — | Apr 7, 2021 | POST GAS LEAK NOTICE · POSTING/SIGNAGE§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED |
| Class A | Closed | 1R | Apr 7, 2021 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CERAMIC TILES WITH GROUTED JOINTS / CAULKING SURFACE OF VISIBLE MOLD AT EAST, NORTH AND WEST WALLS AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | — | Apr 5, 2021 | FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. |
| Class A | Closed | 1R | Dec 21, 2020 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT LOWER SASH WINDOW IN THE KITCHEN LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1R | Dec 16, 2020 | RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE DOOR IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 1R | Dec 16, 2020 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | ClosedRENT IMPAIRING | 1R | Nov 24, 2020 | REPAIR FLUSHING APPARATUS OF WATER CLOSET · SEWERS AND DRAINAGE§ 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1R | Nov 24, 2020 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1R | Nov 24, 2020 | REPAIR LEAKY FAUCETS · WATER SUPPLY§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATH TUB IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1R | Nov 24, 2020 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1R | Jul 1, 2020 | RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WOOD DOOR IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 1R | Feb 21, 2020 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE KITCHEN , THE BATHROOM , THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 1R | Jan 26, 2018 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 1R | Dec 29, 2017 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE BATHROOM , THE KITCHEN LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1R | Nov 27, 2017 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE KITCHEN LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1R | Nov 24, 2017 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT DOOR IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1R | Nov 15, 2017 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | — | Aug 7, 2017 | POST GAS LEAK NOTICE · POSTING/SIGNAGE§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 1R | Aug 7, 2017 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |