stoop
Map
LeaderboardAbout
Building SafetyHousing Conditions

300 PUTNAM AVENUE

Brooklyn · ZIP 11216 · BIN 3051914 · Bedford-Stuyvesant (West) · Last violation May 28, 2026 · Last complaint May 28, 2026

NeighborhoodBedford-Stuyvesant (West)
More violations than 96.1% of nearby buildings
More violations than 96% of buildings and more complaints than 98% of buildings in Bedford-Stuyvesant (West). Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 227 violations · 409 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
23 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous23Class Bhazardous84
Housing Preservation & Development Violations
Total violations since 1991
652
18 per year avg.↑ Up 164% in the last 2 years (227 vs 86 prior 2 yrs)
Open violations
123
Class C (immed. haz.)ⓘ23
Class B (hazardous)ⓘ84
Rent-impairingⓘ23
Open violation ages
▪ < 30 days8% (10)
▪ 30–90 days46% (56)
▪ 3–12 months13% (16)
▪ 1–3 years28% (34)
▪ 3+ years6% (7)
Housing Preservation & Development Complaints
Total complaints since 2003
2,564
107 per year avg.↑ Up 476% in the last 2 years (409 vs 71 prior 2 yrs)
Complaint Resolution
No access13%Violation issued35%No violation28%Phone resolved23%Other1%(2,564)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ166 violations
Extermination & Rodent Eradicationⓘ44 violations
Egressⓘ36 violations
Cleaningⓘ31 violations
Water Supplyⓘ28 violations
Heat And Hot Waterⓘ23 violations
Sewers And Drainageⓘ14 violations
Paintingⓘ12 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ262 complaints
Water & plumbingⓘ70 complaints
Mold & pestsⓘ61 complaints
Bldg maintenanceⓘ47 complaints
Appliancesⓘ21 complaints
Electricalⓘ14 complaints
Safety & fireⓘ4 complaints
Outdoor / structuralⓘ1 complaints
Hide violations ↑See complaints →

Violation log

113 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt

Building safety complaints, construction, permits, and structural issues filed with the NYC Dept. of Buildings, are scored separately.

Building Safety →
See something wrong? File a complaint with 311
Prior 4 yr.
Immed. Emergency2%2%
Emergency83%62%
Non-Emergency15%36%
(240)
(275)
Issued
Description
Class AClosed4HJun 14, 2017PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed4HJun 14, 2017PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed6CMay 11, 2017PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE 4th ROOM FROM NORTH AT CENTER, THE KITCHEN LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed4HMay 9, 2017TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING IN THE 2nd BATHROOM FROM EAST AT NORTH LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed6CDec 21, 2016PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed6CDec 21, 2016PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 4th ROOM FROM NORTH AT CENTER LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed6CDec 21, 2016PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed6CDec 21, 2016PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed2GMar 11, 2016TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... APPROX 1 SQ FT AT NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 2G, 2nd STORY, 4th APARTMENT FROM WEST AT NORTH
Class AClosed2GMar 11, 2016TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... APPROX. 1 SQ FT AT NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 2G, 2nd STORY, 4th APARTMENT FROM WEST AT NORTH
Class AClosed4HMar 3, 2016PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd BATHROOM , THE KITCHEN , THE 4th ROOM FROM EAST, THE 3rd ROOM FROM EAST AT SOUTH, THE 1st ROOM FROM EAST AT NORTH, THE 1st ROOM FROM EAST AT SOUTH, THE 1st BATHROOM LOCATED AT APT 4H, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed6GFeb 20, 2015REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WINDOW RECESS AT NORTH WALL, IN THE 3rd ROOM FROM EAST LOCATED AT APT 6G, 6th STORY, 4th APARTMENT FROM WEST AT NORTH
Class AClosed5FJun 24, 2002REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE POP-UP DRAIN STOPPER AT WASH BASIN IN THE BATHROOM LOCATED AT APT 5F, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
Page 3 of 3
← Prev