stoop
Map
LeaderboardAbout
Building SafetyHousing Conditions

209 EAST 34 STREET

Brooklyn · ZIP 11203 · BIN 3108694 · East Flatbush-Erasmus · Last violation May 28, 2026 · Last complaint May 18, 2026

NeighborhoodEast Flatbush-Erasmus
More violations than 97.2% of nearby buildings
More violations than 97% of buildings and more complaints than 97% of buildings in East Flatbush-Erasmus. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 494 violations · 685 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
18 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous18Class Bhazardous31
Housing Preservation & Development Violations
Total violations since 1981
2,552
55 per year avg.↑ Up 23% in the last 2 years (494 vs 403 prior 2 yrs)
Open violations
59
Class C (immed. haz.)ⓘ18
Class B (hazardous)ⓘ31
Rent-impairingⓘ0
Open violation ages
▪ < 30 days3% (2)
▪ 30–90 days24% (14)
▪ 3–12 months7% (4)
▪ 1–3 years53% (31)
▪ 3+ years14% (8)
Housing Preservation & Development Complaints
Total complaints since 2003
4,978
207 per year avg.↑ Up 231% in the last 2 years (685 vs 207 prior 2 yrs)
Complaint Resolution
No access23%Violation issued31%No violation33%Phone resolved13%Other0%(4,978)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ471 violations
Paintingⓘ117 violations
Extermination & Rodent Eradicationⓘ112 violations
Water Supplyⓘ88 violations
Lead-Based Paintⓘ79 violations
Cleaningⓘ78 violations
Egressⓘ63 violations
Smoke Detecting Devicesⓘ34 violations
Top complaint groupsⓘ
5 yrsAll time
Bldg maintenanceⓘ234 complaints
Water & plumbingⓘ144 complaints
Mold & pestsⓘ128 complaints
Heat / hot waterⓘ76 complaints
Electricalⓘ71 complaints
Safety & fireⓘ71 complaints
Appliancesⓘ21 complaints
Outdoor / structuralⓘ1 complaints
Hide violations ↑See complaints →

Violation log

462 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt

Building safety complaints, construction, permits, and structural issues filed with the NYC Dept. of Buildings, are scored separately.

Building Safety →
See something wrong? File a complaint with 311
Prior 4 yr.
Immed. Emergency9%2%
Emergency58%42%
Non-Emergency33%56%
(33)
(909)
Issued
Description
Class AClosed—Feb 19, 2025CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 4th STORY
Class AClosed—Feb 19, 2025CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 1st STORY
Class AClosed11DJan 8, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 11D, 3rd STORY, 11th APARTMENT FROM SOUTH AT WEST , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
Class AClosed11DJan 8, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 11D, 3rd STORY, 11th APARTMENT FROM SOUTH AT WEST , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
Class AClosed11DJan 7, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM WEST AT NORTH WALL WALL, 1st CLOSET FROM WEST AT NORTH WALL CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 11D, 3rd STORY, 11th APARTMENT FROM SOUTH AT WEST , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
Class AClosed11DJan 7, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM SOUTH AT WEST WALL, 1st RADIATOR FROM SOUTH AT WEST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 11D, 3rd STORY, 11th APARTMENT FROM SOUTH AT WEST , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
Class AClosed11DJan 7, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DOOR FROM NORTH AT EAST WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 11D, 3rd STORY, 11th APARTMENT FROM SOUTH AT WEST , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
Class AClosed11DJan 7, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE KITCHEN LOCATED AT APT 11D, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
Class AClosed11DJan 7, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM NORTH AT EAST WALL DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 11D, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
Class AClosed8DJan 6, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CHAIR RAILS AT WEST WALL, CEILING, NORTH WALL, WEST WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
Class AClosed8DJan 6, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE 2nd ROOM FROM NORTH AT EAST, THE BATHROOM , THE PRIVATE HALLWAY , THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
Class AClosed8DJan 6, 2025TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... (APPROX. 5 SQ FT) AT 2nd CLOSET FROM WEST AT NORTH WALL CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', 1st FROM SOUTH AT SOUTHWEST
Class AClosed15DSep 23, 2024PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed15DSep 23, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed—Sep 16, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY, SECTION ''NORTH''
Class AClosed10CSep 4, 2024REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 10C, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed10CSep 4, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 10C, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed—Jul 22, 2024REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT BUILDING ENTRANCE , 1st STORY
Class AOpen—Apr 9, 2024FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
Class AClosed20BFeb 28, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2 SQ.FT AT CEILING AND APPROXIMATELY 3 SQ.FT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 20B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTHEAST
Class AClosed6AFeb 12, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 5 SQ FT AT THE WINDOW FRAME IN THE BATHROOM LOCATED AT APT 6A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed.17BFeb 8, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT .17B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed6AFeb 5, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 6A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed8DJan 16, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 3 SQFT AT THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosedAPT17BJan 11, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT THE CEILING AND WEST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT APT17B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed.17BJan 11, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT .17B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed.17BJan 11, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 2nd ROOM FROM EAST, THE FOYER LOCATED AT APT .17B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosedAPT17BJan 10, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND SOUTH WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT APT17B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosedAPT17BDec 20, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST LOCATED AT APT APT17B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed20COct 20, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, EAST WALL, WEST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 20C, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed12DAug 21, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING, NORTH, SOUTH AND EAST WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 12D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', AT WEST
Class AClosed12DAug 21, 2023PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 12D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', AT WEST
Class AClosed12DAug 21, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST WALL IN THE FOYER LOCATED AT APT 12D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', AT WEST
Class AClosed12DAug 21, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT DOOR FRAME, CEILING, NORTH, EAST AND WEST WALLS IN THE KITCHEN LOCATED AT APT 12D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', AT WEST
Class AClosed12DAug 21, 2023CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR IN THE ENTIRE APARTMENT LOCATED AT APT 12D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', AT WEST
Class AOpen12DAug 21, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WOOD CABINET AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 12D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', AT WEST
Class AClosed—Aug 17, 2023PAINT METAL · PAINTING§ 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL PARTS FOR ALL BALCONIES AT ALL STORYS THROUGHOUT AT BUILDING FRONT AT FIRE ESCAPE
Class AClosed—Aug 14, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING AT PUBLIC HALL AT NORTH , 1st STORY
Class AClosed15DAug 14, 2023TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 3 SQ FEET AT NORTH WALL UNDER THE BASE CABINETS AND EAST WALL IN THE KITCHEN LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH''
Class AClosed15DAug 14, 2023REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE LOWER BASE CABINETS AT NORTH WALL IN THE KITCHEN LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''SOUTH''
Class AClosed—Aug 14, 2023CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE THE FLOORS AT ALL STORYS FOR NORTH AND SOUTH SECTION OF THE BUILDING AT PUBLIC HALL STAIRS
Class AClosed—Aug 14, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING SOUTH SECTION OF THE BUILDING AT PUBLIC HALL, 1st STORY
Class AClosed14CJul 28, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 2nd ROOM FROM NORTH LOCATED AT APT 14C, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed2AJun 27, 2023NO LOCK AND KEY TO APARTMENT · PROTECTIVE DEVICES AND FIRE PROTECTION§ 27-2043 ADM CODE PROVIDE A LOCK AND KEY TO THE ENTRANCE DOOR OF DWELLING UNIT AND, IF A CL A MULTIPLE DWELLING, ALSO DOOR CHAIN GUARD IN THE ENTRANCE LOCATED AT APT 2A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed2AJun 27, 2023FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WALL ERECTED CREATING A ROOM IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed18CJun 15, 2023TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 4 SQ. FT. AT EAST WALL IN THE BATHROOM LOCATED AT APT 18C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''C'', 1st FROM EAST AT SOUTHEAST
Class AOpen18CJun 14, 2023PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER IN THE BATHROOM LOCATED AT APT 18C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''C'', AT SOUTHEAST
Class AClosed8DJun 14, 2023TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 1 SQ FT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D'', AT SOUTHEAST
Class AClosed18CJun 14, 2023TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 6 SQ FT AT EAST WALL IN THE BATHROOM LOCATED AT APT 18C, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''C'', AT SOUTHEAST
Class AOpen20CJun 14, 2023PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION HEAT RISER IN THE BATHROOM LOCATED AT APT 20C, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''C''
Page 2 of 10
← PrevNext →