stoop
Map
LeaderboardAbout
Building SafetyHousing Conditions

209 EAST 34 STREET

Brooklyn · ZIP 11203 · BIN 3108694 · East Flatbush-Erasmus · Last violation May 28, 2026 · Last complaint May 18, 2026

NeighborhoodEast Flatbush-Erasmus
More violations than 97.2% of nearby buildings
More violations than 97% of buildings and more complaints than 97% of buildings in East Flatbush-Erasmus. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 494 violations · 685 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
18 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous18Class Bhazardous31
Housing Preservation & Development Violations
Total violations since 1981
2,552
55 per year avg.↑ Up 23% in the last 2 years (494 vs 403 prior 2 yrs)
Open violations
59
Class C (immed. haz.)ⓘ18
Class B (hazardous)ⓘ31
Rent-impairingⓘ0
Open violation ages
▪ < 30 days3% (2)
▪ 30–90 days24% (14)
▪ 3–12 months7% (4)
▪ 1–3 years53% (31)
▪ 3+ years14% (8)
Housing Preservation & Development Complaints
Total complaints since 2003
4,978
207 per year avg.↑ Up 231% in the last 2 years (685 vs 207 prior 2 yrs)
Complaint Resolution
No access23%Violation issued31%No violation33%Phone resolved13%Other0%(4,978)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ471 violations
Paintingⓘ117 violations
Extermination & Rodent Eradicationⓘ112 violations
Water Supplyⓘ88 violations
Lead-Based Paintⓘ79 violations
Cleaningⓘ78 violations
Egressⓘ63 violations
Smoke Detecting Devicesⓘ34 violations
Top complaint groupsⓘ
5 yrsAll time
Bldg maintenanceⓘ234 complaints
Water & plumbingⓘ144 complaints
Mold & pestsⓘ128 complaints
Heat / hot waterⓘ76 complaints
Electricalⓘ71 complaints
Safety & fireⓘ71 complaints
Appliancesⓘ21 complaints
Outdoor / structuralⓘ1 complaints
Hide violations ↑See complaints →

Violation log

462 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt

Building safety complaints, construction, permits, and structural issues filed with the NYC Dept. of Buildings, are scored separately.

Building Safety →
See something wrong? File a complaint with 311
Prior 4 yr.
Immed. Emergency9%2%
Emergency58%42%
Non-Emergency33%56%
(33)
(909)
Issued
Description
Class AClosed8DJul 25, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM NORTH AT EAST WALL, EAST WALL, WEST WALL, NORTH WALL, CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D''
Class AClosed8DJul 25, 2022PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D''
Class AClosed8DJul 25, 2022REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D''
Class AClosed8DJul 25, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL, PICTURE MOULDING AT SOUTH WALL, BASEBOARD AT SOUTH WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL, 2nd WINDOW FRAME FROM NORTH AT EAST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL, NORTH WALL, PICTURE MOULDING AT NORTH WALL, BASEBOARD AT NORTH WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL, WEST WALL, PICTURE MOULDING AT WEST WALL, BASEBOARD AT WEST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D''
Class AClosed8DJul 25, 2022TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 1 SQ FT AT THE CEILING IN THE BATHROOM LOCATED AT APT 8D, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''D''
Class AClosed—Jul 22, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT NORTH SECTION AT PUBLIC HALL, 1st STORY
Class AClosed—Jul 22, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT SOUTH SECTION AT PUBLIC HALL, 1st STORY
Class AClosed—Jul 22, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT COURT AT PUBLIC HALL, 1st STORY
Class AClosed11CJul 18, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. 1st DOOR FRAME FROM EAST AT SOUTH WALL, 2nd WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 11C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed11CJul 18, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE FOYER LOCATED AT APT 11C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed11CJul 18, 2022PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION .. 1st RISER FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 11C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed11CJul 18, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 11C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed11CJul 18, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT .. 1st DOOR FRAME FROM SOUTH AT WEST WALL, CEILING IN THE BATHROOM LOCATED AT APT 11C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed6AMay 31, 2022TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT ( APPROXIMATELY 1SQFT ) WEST WINDOW FRAME IN THE BATHROOM LOCATED AT APT 6A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
Class AClosed6AMay 31, 2022TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT ( APPROXIMATELY 1SQ FT ) NORTH WALL IN THE BATHROOM LOCATED AT APT 6A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''NORTH''
Class AClosed2AMay 23, 2022REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN REGLAZE SURFACE AT BATHTUB IN THE BATHROOM LOCATED AT APT 2A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed2AMay 23, 2022REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING METAL ESCUTCHEON PLATE FOR STEAM AT CEILING IN THE BATHROOM LOCATED AT APT 2A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed4CMar 29, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 4C, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTHEAST
Class AClosed11CMar 11, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 11C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed—Feb 24, 2022FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
Class AClosed11CFeb 17, 2022REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT LOWER SASH NORTH EAST WINDOW AT EAST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 11C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed11CFeb 16, 2022TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 2 SQ FT AT THE EAST WALL, CEILING IN THE BATHROOM LOCATED AT APT 11C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed11CFeb 16, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 2nd WINDOW FRAME FROM NORTH AT EAST WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 11C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed11CFeb 16, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 3rd ROOM FROM NORTH, THE PRIVATE HALLWAY LOCATED AT APT 11C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed11CFeb 16, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 11C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed18BJan 26, 2022REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 18B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed18BJan 21, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH, THE BATHROOM , THE FOYER , THE 3rd ROOM FROM NORTH LOCATED AT APT 18B, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTHEAST
Class AClosed—Nov 29, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT BULKHEAD AT BUILDING D
Class AClosed15DNov 29, 2021PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION STEAM RISER IN THE BATHROOM LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed—Nov 29, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 4th STORY
Class AClosed15DNov 29, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 15D, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed14DNov 29, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 14D, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed—Nov 29, 2021CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALLS AND STAIR AT ALL STORIES , SECTION ''D''
Class AClosed12DNov 24, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT ALL WALLS IN THE BATHROOM LOCATED AT APT 12D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed12DNov 24, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 12D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed12DNov 24, 2021PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT STEAM RISER IN THE BATHROOM LOCATED AT APT 12D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed14CNov 19, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN LOCATED AT APT 14C, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed14CNov 19, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 14C, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed10ANov 1, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE FOYER , THE 1st ROOM FROM NORTH LOCATED AT APT 10A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'', 1st FROM SOUTH AT WEST
Class AClosed—Oct 26, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS AT ROOF BULKHEAD AT PUBLIC HALL, 4th STORY, SECTION ''NORTH'', 1st FROM NORTH AT EAST
Class AClosed—Oct 26, 2021CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOORS AT ROOF BULKHEAD AT PUBLIC HALL, 4th STORY, SECTION ''NORTH'', 1st FROM NORTH AT EAST
Class AClosed—Oct 26, 2021CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOORS AT ALL STORIES THROUGHOUT AT PUBLIC HALL, SECTION ''NORTH'', 1st FROM SOUTH AT WEST
Class AClosed1BOct 26, 2021TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AND SOUTH WALL APPROXIAMATELY 8 SQUARE FEET IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
Class AClosed—Oct 26, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS AT ROOF BULKHEAD AT PUBLIC HALL, 4th STORY, SECTION ''NORTH'', 1st FROM SOUTH AT WEST
Class AClosed—Oct 26, 2021CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOORS AT ROOF BULKHEAD AT PUBLIC HALL, 4th STORY, SECTION ''NORTH'', 1st FROM SOUTH AT WEST
Class AClosed1BOct 26, 2021REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
Class AClosed1BOct 26, 2021REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
Class AClosed12BOct 26, 2021REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE GROUT AT CERAMIC TILE WALLS AT EAST, SOUTH AND WEST WALL IN THE BATHROOM LOCATED AT APT 12B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
Class AClosed12BOct 26, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WALLS, CEILING AND TRIM IN THE BATHROOM LOCATED AT APT 12B, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''
Class AClosed—Oct 20, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT THE CEILING AT PUBLIC HALL, 1st STORY, SECTION ''C. D.''
Page 4 of 10
← PrevNext →