| Class A | Closed | 1B | Jun 18, 2019 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CASING AT EXTERIOR ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST |
| Class A | Closed | 2F | May 16, 2019 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CERAMIC TILES AT EAST WALL IN THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EAST |
| Class A | Closed | 2F | May 16, 2019 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EAST |
| Class A | Closed | 2F | May 16, 2019 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE STEAM RISER IN THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EAST |
| Class A | ClosedRENT IMPAIRING | 2F | May 16, 2019 | REPAIR FLUSHING APPARATUS OF WATER CLOSET · SEWERS AND DRAINAGE§ 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET ... IN THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EAST |
| Class A | Closed | 2F | May 16, 2019 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING (APPROX. 1 SQ. FT.) IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EAST |
| Class A | Closed | 2B | Apr 29, 2019 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM WEST AT NORTH WALL DOOR FRAME, 1st CLOSET FROM WEST AT NORTH WALL DOOR, BASEBOARD AT WEST WALL, BASEBOARD AT NORTH WALL IN THE 2nd PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2B | Apr 29, 2019 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT WEST WALL IN THE FOYER LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2B | Apr 29, 2019 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2B | Apr 29, 2019 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2B | Apr 29, 2019 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL, 1st RISER FROM NORTH AT EAST WALL IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2B | Apr 29, 2019 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM WEST AT NORTH WALL, BASEBOARD AT EAST WALL, BASEBOARD AT WEST WALL IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2B | Apr 29, 2019 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2B | Apr 29, 2019 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CHAIR RAILS AT NORTH WALL, CHAIR RAILS AT EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2B | Apr 29, 2019 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM EAST AT SOUTH WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 1F | Apr 1, 2019 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WINDOW STOOL AT 2ND WINDOW FROM WEST AT NORTH IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EAST |
| Class A | Closed | 1F | Apr 1, 2019 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EAST |
| Class A | Closed | 2L | Mar 28, 2019 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE RISER AT NORTH WALL IN THE BATHROOM LOCATED AT APT 2L, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST |
| Class A | Closed | 2L | Mar 28, 2019 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 2L, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST |
| Class A | ClosedRENT IMPAIRING | 2L | Mar 28, 2019 | REPAIR LEAKY PIPES · WATER SUPPLY§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE WATER SUPPLY PIPE BENEATH WASH BASIN IN THE BATHROOM LOCATED AT APT 2L, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST |
| Class A | Closed | 2L | Mar 28, 2019 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCKSET AT ENTRANCE DOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2L, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST |
| Class A | Closed | 2N | Mar 25, 2019 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERATIVE INTERCOM SYSTEM LEADING FROM BUILDING ENTRANCE DOOR TO APARTMENT LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT EAST |
| Class A | Closed | 2N | Mar 25, 2019 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH WALL BEHIND WALL CABINET AND EAST WALL IN THE KITCHEN LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT EAST |
| Class A | Closed | 2N | Mar 25, 2019 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT STOOL IN THE 4th ROOM FROM NORTH LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT EAST |
| Class A | Closed | 2N | Mar 25, 2019 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR NEAR RADIATOR IN THE 4th ROOM FROM NORTH LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT EAST |
| Class A | Closed | 2N | Mar 25, 2019 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT EAST |
| Class A | Closed | 2N | Mar 25, 2019 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CASING AROUND ENTRANCE DOOR IN THE ENTRANCE LOCATED AT APT 2N, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT EAST |
| Class A | Closed | — | Feb 4, 2019 | REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING SAFETY CAPS OR COVERS AT ELECTRIC OUTLET AT WALL AT LOWER NORTHEAST CORNER AT PUBLIC HALL, 1st STORY |
| Class A | Closed | — | Sep 27, 2018 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND NORTH WALL AT PUBLIC HALL STAIRS, 1st STORY, SECTION AT WEST |
| Class A | Closed | — | Sep 27, 2018 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND NORTH WALL AT PUBLIC HALL STAIRS, 1st STORY, SECTION AT WEST |
| Class A | Closed | — | Jun 25, 2018 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 2K | May 18, 2018 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST AND SOUTH WALLS AT SHOWER STALL IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST |
| Class A | Closed | 2K | May 18, 2018 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND ALL WALLS AT INTERIOR OF CLOSET AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST |
| Class A | Closed | 2K | May 18, 2018 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST |
| Class A | Closed | 2K | May 18, 2018 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR AT SHOWER STALL IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT WEST |
| Class A | Closed | — | Mar 5, 2018 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND NORTH WALL AT BULKHEAD AT PUBLIC HALL, 6th STORY, SECTION AT WEST |
| Class A | Closed | — | Mar 5, 2018 | POST SIGN INDICATING NAME AND ADDRESS OF JANITOR, ETC. · POSTING/SIGNAGE§ 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY |
| Class A | Closed | — | Jan 11, 2018 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 5A | Nov 9, 2016 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 1F | Nov 3, 2016 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM SOUTH AT WEST WALL DOOR, 1st CLOSET FROM SOUTH AT WEST WALL DOOR FRAME, 1st CLOSET FROM NORTH AT EAST WALL DOOR, 1st CLOSET FROM NORTH AT EAST WALL DOOR FRAME IN THE FOYER LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1F | Nov 3, 2016 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 3rd ROOM FROM EAST AT NORTH, THE KITCHEN , THE 2nd ROOM FROM EAST AT NORTH, THE PRIVATE HALLWAY , THE 2nd BATHROOM FROM EAST AT SOUTH, THE 1st BATHROOM FROM EAST AT SOUTH, THE 1st ROOM FROM EAST AT NORTH, THE 3rd ROOM FROM EAST AT CENTER LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 5A | Aug 8, 2016 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , 1st CLOSET FROM WEST AT NORTH WALL DOOR, BASEBOARD AT WEST WALL IN THE FOYER LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5A | Aug 8, 2016 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION , 1st RISER FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5A | Aug 8, 2016 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5A | Aug 8, 2016 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION , 1st RISER FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5A | Aug 8, 2016 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , BASEBOARD AT NORTH WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5A | Aug 8, 2016 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , 1st CLOSET FROM EAST AT SOUTH WALL DOOR, BASEBOARD AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | — | Mar 11, 2015 | POST HOUSING INFORMATION GUIDE NOTICE · POSTING/SIGNAGE§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD., 1st STORY |
| Class A | Closed | — | Dec 26, 2014 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALL AT PUBLIC HALL AT NORTH , 1st STORY, SECTION AT WEST |
| Class A | Closed | 2E | Dec 22, 2014 | REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING FAUCET KNOB AT WASHBASIN. IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST |