| Class A | Closed | 51B | Aug 22, 2014 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 51B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 23B | Aug 15, 2014 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 23B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 23B | Aug 13, 2014 | REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING WOOD MOLDING AT BOTTOM OF BASE CABINET IN THE KITCHEN LOCATED AT APT 23B, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 23B | Aug 13, 2014 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 23B, 2nd STORY, APARTMENT AT SOUTH |
| Class A | Closed | 64B | Aug 4, 2014 | RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL .. IN THE BATHROOM LOCATED AT APT 64B, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTH , 2nd SECTION FROM WEST AT NORTH |
| Class A | Closed | 50B | Jul 17, 2014 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 50B, 5th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 43B | Jun 13, 2014 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE AND/OR INOPERABLE BELL AND BUZZER LOCATED AT APT 43B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 43B | Jun 13, 2014 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE BATHROOM , THE 1st ROOM FROM NORTH LOCATED AT APT 43B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 43B | Jun 13, 2014 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION ,, 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE FOYER LOCATED AT APT 43B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 43B | Jun 13, 2014 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ,, 2nd CLOSET FROM SOUTH AT WEST WALL DOOR IN THE FOYER LOCATED AT APT 43B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 43B | Jun 13, 2014 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ,, NORTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 43B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 43B | Jun 13, 2014 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ,, WEST WALL IN THE KITCHEN LOCATED AT APT 43B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 43B | Jun 13, 2014 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ,, EAST WALL, WEST WALL IN THE FOYER LOCATED AT APT 43B, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 40B | Apr 25, 2014 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE BATHROOM LOCATED AT APT 40B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 40B | Apr 25, 2014 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 40B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 40B | Apr 25, 2014 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH WALL & CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 40B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 40B | Apr 25, 2014 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 40B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 50B | Apr 25, 2014 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 50B, 5th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 27B | Feb 3, 2014 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT LOWER WINDOW SASH IN THE BATHROOM LOCATED AT APT 27B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | — | Feb 3, 2014 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 27B | Dec 18, 2013 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ,, CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 27B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 27B | Dec 18, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ,, 1st CLOSET FROM SOUTH AT WEST WALL DOOR IN THE FOYER LOCATED AT APT 27B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 27B | Dec 18, 2013 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ,, EAST WALL, 1st CLOSET FROM SOUTH AT WEST WALL WALL IN THE FOYER LOCATED AT APT 27B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | ClosedRENT IMPAIRING | 27B | Dec 18, 2013 | REPLACE DEFECTIVE SINK, WATER CLOSET, WASH TUB · SEWERS AND DRAINAGE§ 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE (MISSING) SHOWER HEAD AT BATHTUB IN THE BATHROOM LOCATED AT APT 27B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 27B | Dec 18, 2013 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ,, NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 27B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 27B | Dec 18, 2013 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ,, SOUTH WALL, NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 27B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 27B | Dec 18, 2013 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ,, SOUTH WALL IN THE KITCHEN LOCATED AT APT 27B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 27B | Dec 18, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ,, 1st WALL CABINET FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 27B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 27B | Dec 18, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ,, 1st DOOR FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 27B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 27B | Dec 18, 2013 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ,, NORTH WALL, EAST WALL, WEST WALL, CEILING IN THE BATHROOM LOCATED AT APT 27B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 10B | Dec 9, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE IN THE KITCHEN LOCATED AT APT 10B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''b'' |
| Class A | Closed | 10B | Dec 9, 2013 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 10B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''b'' |
| Class A | Closed | 10B | Dec 9, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR, 1st CLOSET FROM EAST AT SOUTH WALL DOOR IN THE FOYER LOCATED AT APT 10B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''b'' |
| Class A | Closed | 10B | Dec 9, 2013 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE WEST WALL, CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 10B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''b'' |
| Class A | Closed | 10B | Dec 9, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st RADIATOR FROM WEST AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 10B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''b'' |
| Class A | Closed | 10B | Dec 9, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE BATHROOM LOCATED AT APT 10B, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''b'' |
| Class A | Closed | 15A | Sep 9, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT WEST WALL, CEILING IN THE KITCHEN LOCATED AT APT 15A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 15A | Sep 9, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 15A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 15A | Sep 9, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 4th ROOM FROM EAST, THE 2nd ROOM FROM EAST LOCATED AT APT 15A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 15A | Sep 9, 2013 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 15A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 15A | Sep 9, 2013 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 15A, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 10C | Sep 5, 2013 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 10C, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 10C | Sep 5, 2013 | REPAIR LEAKY FAUCETS · WATER SUPPLY§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS SINK IN THE KITCHEN LOCATED AT APT 10C, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 38B | Jul 18, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM SOUTH AT WEST WALL, NORTH WALL, SOUTH WALL, EAST WALL, CEILING IN THE BATHROOM LOCATED AT APT 38B, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 14C | Apr 25, 2013 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 14C | Apr 25, 2013 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DUMB WAITER FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 14C | Apr 25, 2013 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE KITCHEN LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 14C | Apr 25, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM EAST AT SOUTH WALL, BASEBOARD AT WEST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 14C | Apr 25, 2013 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE 5th ROOM FROM EAST AT NORTH LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 14C | Apr 25, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR IN THE 5th ROOM FROM EAST AT NORTH LOCATED AT APT 14C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |