stoop
Map
LeaderboardAbout
Building SafetyHousing Conditions

426 61 STREET

Brooklyn · ZIP 11220 · BIN 3143727 · Sunset Park (Central) · Last violation May 29, 2026 · Last complaint May 29, 2026

NeighborhoodSunset Park (Central)
More violations than 100% of nearby buildings
More violations than 100% of buildings and more complaints than 100% of buildings in Sunset Park (Central). Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
More activity recently than in past years
Last 2 yrs: 619 violations · 841 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
60 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous60Class Bhazardous50
Housing Preservation & Development Violations
Total violations since 2011
1,189
74 per year avg.↑ Up 42% in the last 2 years (619 vs 436 prior 2 yrs)
Open violations
126
Class C (immed. haz.)ⓘ60
Class B (hazardous)ⓘ50
Rent-impairingⓘ6
Housing Preservation & Development Complaints
Total complaints since 2006
1,475
70 per year avg.↑ Up 52% in the last 2 years (841 vs 554 prior 2 yrs)
Complaint Resolution
No access14%Violation issued16%No violation50%Phone resolved19%Other1%(1,475)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ345 violations
Extermination & Rodent Eradicationⓘ134 violations
Egressⓘ118 violations
Heat And Hot Waterⓘ89 violations
Paintingⓘ82 violations
Cleaningⓘ62 violations
Smoke Detecting Devicesⓘ47 violations
Carbon Monoxide Detecting Devicesⓘ46 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ334 complaints
Bldg maintenanceⓘ320 complaints
Mold & pestsⓘ185 complaints
Water & plumbingⓘ153 complaints
Electricalⓘ111 complaints
Safety & fireⓘ82 complaints
Appliancesⓘ24 complaints
Adminⓘ18 complaints
Outdoor / structuralⓘ9 complaints
Elevatorⓘ6 complaints
Hide violations ↑See complaints →

Violation log

192 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt

Building safety complaints, construction, permits, and structural issues filed with the NYC Dept. of Buildings, are scored separately.

Building Safety →
See something wrong? File a complaint with 311
Open violation ages
▪ < 30 days9% (11)
▪ 30–90 days10% (12)
▪ 3–12 months39% (49)
▪ 1–3 years42% (53)
Prior 4 yr.
Immed. Emergency3%5%
Emergency59%43%
Non-Emergency38%51%
(327)
(1,074)
Issued
Description
Class AClosedOMar 16, 2023TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 4 SQ FT AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT O, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed—Dec 16, 2022REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY
Class AClosed4MMay 9, 2022REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILE AT WALKING AREA IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4M, 4th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed1DJan 4, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE KITCHEN , THE 4th ROOM FROM NORTH AT WEST, THE FOYER LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed1DJan 4, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed—Dec 21, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WEST WALL AT INTERMEDIATE LANDING AT 2ND AND 3RD STORY PUBLIC HALL STAIRS
Class AClosedLDec 21, 2020PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION STEAM RISER AT NORTH/ WEST CORNER IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT L, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed—Jun 22, 2020POST SIGN INDICATING NAME AND ADDRESS OF JANITOR, ETC. · POSTING/SIGNAGE§ 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
Class AClosed—Nov 6, 2019POST SMOKE DETECTOR NOTICE · POSTING/SIGNAGE§ 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY
Class AClosed—Nov 6, 2019POST HOUSING INFORMATION GUIDE NOTICE · POSTING/SIGNAGE§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD.
Class AClosed—Sep 27, 2019POST HOUSING INFORMATION GUIDE NOTICE · POSTING/SIGNAGE§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
Class AClosed—Sep 6, 2019POST REGISTRATION SIGN · ANNUAL PROPERTY REGISTRATION§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY
Class AClosed—Sep 6, 2019POST SMOKE DETECTOR NOTICE · POSTING/SIGNAGE§ 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY
Class AClosed—Sep 6, 2019POST SIGN INDICATING NAME AND ADDRESS OF JANITOR, ETC. · POSTING/SIGNAGE§ 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORY
Class AClosed—Sep 6, 2019POST GAS LEAK NOTICE · POSTING/SIGNAGE§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL
Class AClosed—Jul 1, 2019POST CO DETECTOR NOTICE · CARBON MONOXIDE DETECTING DEVICES§ 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. AT PUBLIC HALL, 1st STORY
Class AClosed—Jul 1, 2019POST SMOKE DETECTOR NOTICE · POSTING/SIGNAGE§ 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX MISSING AT PUBLIC HALL, 1st STORY
Class AClosed—Jul 1, 2019POST GAS LEAK NOTICE · POSTING/SIGNAGE§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
Class AClosed—Jun 18, 2019POST GAS LEAK NOTICE · POSTING/SIGNAGE§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
Class AClosed3LApr 5, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 3L, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed3LApr 5, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3L, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed3LApr 5, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST AT NORTH, THE 3rd ROOM FROM EAST LOCATED AT APT 3L, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed3LApr 5, 2019PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed3LApr 5, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM SOUTH AT WEST WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL, CEILING IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 3L, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed3LApr 5, 2019PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 3L, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed3LApr 5, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed3LApr 5, 2019PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE KITCHEN LOCATED AT APT 3L, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed3LApr 5, 2019REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 3L, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosedGOct 31, 2016PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT G, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosedGOct 31, 2016PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 1st ROOM FROM NORTH LOCATED AT APT G, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosedGOct 31, 2016PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM SOUTH AT WEST WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT G, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosedGOct 31, 2016PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT G, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosedGOct 31, 2016PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT G, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed2GOct 18, 2016PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM NORTH, THE KITCHEN , THE PRIVATE HALLWAY , THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosedOAug 10, 2012PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE BASEBOARD AT EAST WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT O, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosedOAug 10, 2012PAINT METAL · PAINTINGSECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE KITCHEN LOCATED AT APT O, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosedOAug 10, 2012PAINT · PAINTINGSECTION 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM WEST AT NORTH WALL, BASEBOARD AT SOUTH WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL, BASEBOARD AT WEST WALL IN THE KITCHEN LOCATED AT APT O, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosedOAug 10, 2012REFIT DOORS ETC. · EGRESSSECTION 27-2005 ADM CODE REFIT DOOR AT EAST CLOSET IN THE 5th ROOM FROM EAST LOCATED AT APT O, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosedOAug 10, 2012REFIT DOORS ETC. · EGRESSSECTION 27-2005 ADM CODE REFIT DOOR IN THE BATHROOM LOCATED AT APT O, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosedOAug 10, 2012REPAIR PLASTER · MAINTENANCESECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, CEILING, 1st CLOSET FROM WEST AT NORTH WALL CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT O, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosedOAug 10, 2012PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 4th ROOM FROM EAST, THE 5th ROOM FROM EAST LOCATED AT APT O, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosedOAug 10, 2012PAINT METAL · PAINTINGSECTION 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT O, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST
Page 4 of 4
← Prev