stoop
Map
LeaderboardAbout
Building SafetyHousing Conditions

209 AVENUE P

Brooklyn · ZIP 11204 · BIN 3174363 · Bensonhurst · Last violation Apr 27, 2026 · Last complaint May 31, 2026

NeighborhoodBensonhurst
More violations than 98.7% of nearby buildings
More violations than 99% of buildings and more complaints than 99% of buildings in Bensonhurst. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
More activity recently than in past years
Last 2 yrs: 359 violations · 365 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
48 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous48Class Bhazardous201
Housing Preservation & Development Violations
Total violations since 2002
1,024
41 per year avg.↑ Up 130% in the last 2 years (359 vs 156 prior 2 yrs)
Open violations
296
Class C (immed. haz.)ⓘ48
Class B (hazardous)ⓘ201
Rent-impairingⓘ57
Housing Preservation & Development Complaints
Total complaints since 2003
1,094
46 per year avg.↑ Up 226% in the last 2 years (365 vs 112 prior 2 yrs)
Complaint Resolution
No access7%Violation issued18%No violation25%Phone resolved49%Other0%(1,094)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Egressⓘ154 violations
Maintenanceⓘ120 violations
Cleaningⓘ86 violations
Paintingⓘ49 violations
Heat And Hot Waterⓘ23 violations
Extermination & Rodent Eradicationⓘ19 violations
Lead-Based Paintⓘ16 violations
Smoke Detecting Devicesⓘ14 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ260 complaints
Mold & pestsⓘ87 complaints
Bldg maintenanceⓘ56 complaints
Water & plumbingⓘ29 complaints
Safety & fireⓘ25 complaints
Elevatorⓘ13 complaints
Outdoor / structuralⓘ13 complaints
Electricalⓘ9 complaints
Appliancesⓘ1 complaints
Hide violations ↑See complaints →

Violation log

169 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt

Building safety complaints, construction, permits, and structural issues filed with the NYC Dept. of Buildings, are scored separately.

Building Safety →
See something wrong? File a complaint with 311
Open violation ages
▪ 30–90 days20% (59)
▪ 3–12 months32% (94)
▪ 1–3 years19% (55)
▪ 3+ years30% (88)
Prior 4 yr.
Immed. Emergency1%1%
Emergency82%69%
Non-Emergency18%30%
(244)
(254)
Issued
Description
Class AClosed—Apr 8, 2024FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
Class AClosed—Mar 21, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT THE CEILING, IN EAST SECTIONS, AT PUBLIC HALL, 6th STORY
Class AClosed—Mar 21, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT THE CEILING WEST AND SOUTH WALLS , IN WEST SECTIONS, ON 6TH STORY, AT PUBLIC HALL STAIRS
Class AClosedD3Mar 18, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 9 SQUARE FEET AT GROUTS JOINTS IRRESPECTIVE AT NORTH AND WEST WALLS AROUND BATHTUB.. IN THE BATHROOM LOCATED AT APT D3, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST''
Class AClosed3DMar 14, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING & SOUTH WALL IN THE KITCHEN LOCATED AT APT 3D, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed3DMar 14, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 3D, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed3DMar 14, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3D, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed—Mar 11, 2024CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE STAIRS AND LEADING. AT 1st PUBLIC HALL BULKHEAD FROM EAST, 6th STORY
Class AClosed—Mar 11, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AT 1st PUBLIC HALL BULKHEAD FROM EAST, 6th STORY
Class AClosed—Mar 11, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL. AT 2nd PUBLIC HALL BULKHEAD FROM EAST, 6th STORY
Class AClosed—Nov 24, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL AND CEILING AT PUBLIC HALL AT NORTHEAST , 6th STORY, SECTION ''west''
Class AClosed—Nov 24, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND SOUTH WALL AT PUBLIC HALL AT , 1st STORY, SECTION ''west''
Class AClosed—Sep 25, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 6th STORY
Class AClosed—Sep 25, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT SOUTH WALL AT PUBLIC HALL, 1st STORY
Class AClosed—Jun 12, 2023CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE COMPACTOR CLOSETS AT ALL STORIES AT PUBLIC HALL
Class AClosed—Jun 8, 2023PROVIDE SHOE FOR DROP LADDER · FIRE EGRESS AND PROTECTION§ 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER AT EAST FIRE ESCAPE AT BUILDING FRONT
Class AClosed—Apr 13, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 6th STORY
Class AClosed—Mar 21, 2023FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
Class AClosed—Mar 14, 2023REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT VESTIBULE DOOR AT PUBLIC HALL, 1st STORY
Class AClosedE1Feb 27, 2023REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT E1, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH
Class AClosedE1Feb 27, 2023TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 2 SQ.FT. 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE BATHROOM LOCATED AT APT E1, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH
Class AClosedE1Feb 27, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT E1, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH
Class AClosedE1Feb 27, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST AT SOUTH, THE PRIVATE HALLWAY , THE BATHROOM , THE FOYER , THE KITCHEN LOCATED AT APT E1, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH
Class AClosed—Sep 6, 2022REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT DOOR AT COMPACTOR CLOSET AT NORTH WALL AT PUBLIC HALL, 3rd STORY
Class AClosedF1Jul 6, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT F1, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTH
Class AClosedF1Jul 6, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT F1, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTH
Class AClosedF1Jul 6, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT F1, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTH
Class AClosedF1Jul 6, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT F1, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTH
Class AOpen—Jun 30, 2022PROVIDE SHOE FOR DROP LADDER · FIRE EGRESS AND PROTECTION§ 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER AT 1ST STACK FROM EAST AT BUILDING FRONT AT FIRE ESCAPE
Class AClosed—Mar 17, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 6th STORY
Class AOpen—Mar 17, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY
Class AClosed—Mar 17, 2022POST GAS LEAK NOTICE · POSTING/SIGNAGE§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
Class AClosedB8Mar 8, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT B8, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed—Mar 10, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ..THE CEILING AT PUBLIC HALL, 6th STORY, SECTION AT WEST
Class AClosed—Mar 5, 2021REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT FIREPROOF DOOR AT PUBLIC HALL, 5th STORY
Class AClosed—Mar 5, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 6th STORY, SECTION AT EAST
Class AClosedC12Feb 22, 2021REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, EAST WALL, SOUTH WALL, CEILING IN THE BATHROOM LOCATED AT APT C12, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST''
Class AClosedC12Feb 22, 2021REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT C12, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST''
Class AClosedC12Feb 22, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM NORTH AT EAST WALL, 1st DOOR FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT C12, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST''
Class AClosedC12Feb 22, 2021REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL, SOUTH WALL, WEST WALL IN THE KITCHEN LOCATED AT APT C12, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST''
Class AClosedC12Feb 22, 2021PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE KITCHEN LOCATED AT APT C12, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST''
Class AClosedC12Feb 22, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT C12, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST''
Class AClosed—Nov 23, 2020REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT FIRE DOOR AT PUBLIC HALL, 3rd STORY
Class AClosed—Nov 23, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST WALL AT INTERMEDIATE LANDING AT PUBLIC HALL STAIRS, 5th STORY
Class AClosed—Nov 16, 2020REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND WEST WALL AT VESTIBULE AT PUBLIC HALL, 1st STORY
Class AClosed—Nov 16, 2020REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND WEST WALL AT VESTIBULE AT PUBLIC HALL, 1st STORY
Class AClosed—Nov 16, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WEST WALL AT VESTIBULE AT PUBLIC HALL, 1st STORY
Class AOpen—Nov 9, 2020PROVIDE SHOE FOR DROP LADDER · FIRE EGRESS AND PROTECTION§ 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER .. AT 1st FIRE ESCAPE FROM EAST AT SOUTH
Class AClosed—Oct 13, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST WALL , SECTION AT WEST
Class AClosed—Oct 13, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WEST WALL , SECTION AT WEST
Page 2 of 4
← PrevNext →