stoop
Map
LeaderboardAbout
Building SafetyHousing Conditions

1711 FULTON STREET

Brooklyn · ZIP 11233 · BIN 3325183 · Bedford-Stuyvesant (East) · Last violation May 19, 2026 · Last complaint May 30, 2026

NeighborhoodBedford-Stuyvesant (East)
More violations than 86.1% of nearby buildings
More violations than 86% of buildings and more complaints than 96% of buildings in Bedford-Stuyvesant (East). Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 356 violations · 553 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
107 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous107Class Bhazardous153
Housing Preservation & Development Violations
Total violations since 1981
2,382
52 per year avg.↑ Up 189% in the last 2 years (356 vs 123 prior 2 yrs)
Open violations
287
Class C (immed. haz.)ⓘ107
Class B (hazardous)ⓘ153
Rent-impairingⓘ17
Housing Preservation & Development Complaints
Total complaints since 2003
8,599
358 per year avg.↑ Up 140% in the last 2 years (553 vs 230 prior 2 yrs)
Complaint Resolution
No access15%Violation issued13%No violation24%Phone resolved47%Other0%(8,599)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ127 violations
Egressⓘ103 violations
Extermination & Rodent Eradicationⓘ75 violations
Cleaningⓘ49 violations
Water Supplyⓘ43 violations
Paintingⓘ27 violations
Heat And Hot Waterⓘ27 violations
Carbon Monoxide Detecting Devicesⓘ23 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ369 complaints
Water & plumbingⓘ224 complaints
Mold & pestsⓘ133 complaints
Bldg maintenanceⓘ70 complaints
Appliancesⓘ38 complaints
Electricalⓘ22 complaints
Safety & fireⓘ19 complaints
Outdoor / structuralⓘ1 complaints
Hide violations ↑See complaints →

Violation log

467 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt

Building safety complaints, construction, permits, and structural issues filed with the NYC Dept. of Buildings, are scored separately.

Building Safety →
See something wrong? File a complaint with 311
Open violation ages
▪ < 30 days1% (2)
▪ 30–90 days8% (22)
▪ 3–12 months47% (133)
▪ 1–3 years26% (74)
▪ 3+ years19% (55)
Prior 4 yr.
Immed. Emergency15%3%
Emergency57%66%
Non-Emergency28%32%
(387)
(551)
Issued
Description
Class AClosed—Mar 9, 2011REMOVE ACCUMULATION OR RUBBISH · CLEANING§ 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE EXTENSION ROOF OVER GARAGE
Class AClosed1DDec 29, 2010NO LOCK AND KEY TO APARTMENT · PROTECTIVE DEVICES AND FIRE PROTECTION§ 27-2043 ADM CODE PROVIDE A LOCK AND KEY TO THE ENTRANCE DOOR OF DWELLING UNIT AND, IF A CL A MULTIPLE DWELLING, ALSO CHAIN DOOR GUARD LOCATED AT APT 1D, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed2BAug 25, 2010REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE NORTH WOOD HOLLOW-CORE DOOR IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed2BAug 25, 2010PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st BATHROOM , THE PRIVATE HALLWAY , THE 2nd BATHROOM , THE 3rd ROOM FROM EAST AT SOUTH, THE 2nd ROOM FROM EAST AT SOUTH, THE 1st ROOM FROM EAST AT SOUTH, THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed2BApr 26, 2010REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed2UMar 25, 2010PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 2U, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION AT EAST
Class AClosed3DMar 22, 2010REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed1GDec 21, 2009PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 1G, 1st STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed3GNov 16, 2009NO LOCK AND KEY TO APARTMENT · PROTECTIVE DEVICES AND FIRE PROTECTION§ 27-2043 ADM CODE PROVIDE A LOCK AND KEY TO THE ENTRANCE DOOR OF DWELLING UNIT AND, IF A CL A MULTIPLE DWELLING, ALSO CHAIN DOOR GUARD IN THE FOYER LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed1KOct 7, 2008PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 3rd ROOM FROM EAST AT NORTH, THE 2nd ROOM FROM EAST AT NORTH, THE 1st ROOM FROM EAST, THE PRIVATE HALLWAY , THE BATHROOM LOCATED AT APT 1K, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed1SSep 11, 2008PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd BATHROOM FROM NORTH AT EAST, THE PRIVATE HALLWAY , THE 3rd ROOM FROM NORTH AT WEST, THE 2nd PRIVATE HALLWAY , THE BATHROOM LOCATED AT APT 1S, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed3ZZAug 26, 2008NO LOCK AND KEY TO APARTMENT · PROTECTIVE DEVICES AND FIRE PROTECTION§ 27-2043 ADM CODE PROVIDE A LOCK AND KEY TO THE ENTRANCE DOOR OF DWELLING UNIT AND, IF A CL A MULTIPLE DWELLING, ALSO CHAIN DOOR GUARD IN THE ENTRANCE LOCATED AT APT 3ZZ, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed1SMay 5, 2008PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT WEST, THE 3rd PRIVATE HALLWAY , THE 2nd PRIVATE HALLWAY , THE 1st PRIVATE HALLWAY , THE 2nd BATHROOM , THE 1st BATHROOM LOCATED AT APT 1S, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed2UMar 20, 2006PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ,, CEILING IN THE BATHROOM LOCATED AT APT 2U, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed2UMar 20, 2006PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION ,, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 2U, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed—Jan 29, 2004POST FLOOR SIGN · POSTING/SIGNAGE§ 27-2048 ADM CODE PAINT OR POST A SIGN INDICATING FLOORS ALL STYS PUBLIC HALL ALSO IN STAIRWELLS AT PUBLIC HALL
Class AClosed1SNov 5, 1990NO LOCK AND KEY TO APARTMENT · PROTECTIVE DEVICES AND FIRE PROTECTION§ 27-2043 ADM CODE PROVIDE A LOCK AND KEY TO THE ENTRANCE DOOR OF DWELLING UNIT AND, IF A CL A MULTIPLE DWELLING, ALSO CHAIN DOOR GUARD MISSING 1 STY 2ND FROM SOUTH AT WEST APT 1S. , SECTION '' ''
Page 10 of 10
← Prev