| Class A | Open | 16H | Apr 3, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 16H, 16th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 16H | Mar 14, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND WASH BASIN IN THE BATHROOM LOCATED AT APT 16H, 16th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | — | Mar 14, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY |
| Class A | Closed | — | Mar 6, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT 2ND STORY AT PUBLIC HALL |
| Class A | Closed | 21B | Mar 6, 2024 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE GROUT AT TILES AT EAST WALL IN THE BATHROOM LOCATED AT APT 21B, 21st STORY, 5th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 16H | Feb 26, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE 1st ROOM FROM EAST AT NORTH, THE BATHROOM , THE 2nd ROOM FROM EAST LOCATED AT APT 16H, 16th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | — | Feb 12, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 25th STORY |
| Class A | Open | 220 | Feb 5, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 220, 22nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 220 | Feb 5, 2024 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 220, 22nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 220 | Feb 5, 2024 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 220, 22nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 220 | Feb 5, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 220, 22nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 7B | Jan 29, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE PRIVATE HALLWAY LOCATED AT APT 7B, 7th STORY, 5th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 21B | Dec 14, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 2nd ROOM FROM EAST LOCATED AT APT 21B, 21st STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 4B | Dec 5, 2023 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 2 SQFT AT THE CEILING IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Open | 22A | Nov 20, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 1st ROOM FROM EAST, THE 2nd ROOM FROM NORTH AT WEST, THE BATHROOM , THE PRIVATE HALLWAY , THE FOYER LOCATED AT APT 22A, 22nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | — | Aug 14, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 16O | Aug 9, 2023 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 16O, 16th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 13N | Jun 22, 2023 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2 SQUARE FEET AT THE CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 13N, 13th STORY, 6th APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' |
| Class A | Closed | 13N | Jun 22, 2023 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CERAMIC TILES SURFACE AND GROUTS JOINTS OF VISIBLE MOLD AT NORTH AND EAST WALLS AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 13N, 13th STORY, 6th APARTMENT FROM SOUTH AT WEST , SECTION ''NORTH'' |
| Class A | Open | 16H | May 30, 2023 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE KITCHEN LOCATED AT APT 16H, 16th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 16H | May 30, 2023 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AND EAST WALL APPROX 2 SQ FT IN THE BATHROOM LOCATED AT APT 16H, 16th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class A | Open | 16H | May 30, 2023 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL AND CEILING IN THE BATHROOM LOCATED AT APT 16H, 16th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | — | May 15, 2023 | REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING GLASS PANE AT THE FRONT ENTRY DOOR TO THE BUILDING , 2nd STORY |
| Class A | Closed | — | May 15, 2023 | ABATE THE NUISANCE · MAINTENANCE§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PLEXIGLASS INSTALLED AT THE FRONT ENTRY DOOR TO THE BUILDING , 2nd STORY |
| Class A | Closed | 16K | Apr 21, 2023 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CERAMIC TILES SURFACE, CAULKING AND GROUTS JOINTS OF VISIBLE MOLD AT EAST AND SOUTH WALLS AROUND BATHTUB IN THE 3rd BATHROOM FROM EAST AT SOUTH LOCATED AT APT 16K, 16th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''NORTHCENTE'' |
| Class A | Closed | — | Mar 31, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT VESTIBULE AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 6O | Mar 27, 2023 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR IN THE ENTRANCE LOCATED AT APT 6O, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Open | 6O | Mar 27, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 6O, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Open | 7B | Mar 27, 2023 | REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING MEDICINE CABINET AT THE EAST WALL IN THE BATHROOM LOCATED AT APT 7B, 7th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 6O | Mar 27, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 6O, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 6O | Mar 27, 2023 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT THE DOORS OF THE CLOSET AT WEST IN THE FOYER LOCATED AT APT 6O, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 3A | Mar 2, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 6O | Oct 17, 2022 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CERAMIC TILES SURFACE AND GROUTS JOINTS OF VISIBLE MOLD AT NORTH WALL AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 6O, 6th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 16K | Oct 3, 2022 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL, WEST WALL, NORTH WALL, CEILING IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 16K, 16th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' |
| Class A | Closed | — | Oct 3, 2022 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT THE COMPACTOR CLOSET DOOR ,AT NORTH WALL, AT PUBLIC HALL, 16th STORY |
| Class A | Open | 16K | Oct 3, 2022 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st WINDOW FRAME FROM SOUTH AT WEST WALL, 1st RADIATOR FROM SOUTH AT WEST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 16K, 16th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' |
| Class A | Open | 16K | Oct 3, 2022 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST, THE 3rd BATHROOM FROM EAST AT SOUTH, THE 2nd ROOM FROM EAST AT NORTH, THE 1st ROOM FROM EAST AT NORTH, THE KITCHEN , THE PRIVATE HALLWAY , THE FOYER , THE 2nd BATHROOM FROM EAST AT SOUTH LOCATED AT APT 16K, 16th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' |
| Class A | Closed | 16K | Oct 3, 2022 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 16K, 16th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' |
| Class A | Closed | 16K | Oct 3, 2022 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT ( APPROXIMATELY 1SQFT) CEILING IN THE 2nd BATHROOM FROM EAST AT SOUTH LOCATED AT APT 16K, 16th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' |
| Class A | Closed | 16K | Oct 3, 2022 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM EAST AT SOUTH WALL DOOR, 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 16K, 16th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' |
| Class A | Closed | 16K | Oct 3, 2022 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT ( APPROXIMATELY 1SQFT ) CEILING IN THE 3rd BATHROOM FROM EAST AT SOUTH LOCATED AT APT 16K, 16th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' |
| Class A | Closed | 16K | Oct 3, 2022 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT THE WOOD DOORS AT, WEST AND EAST WALL'S CABINETS IN THE KITCHEN LOCATED AT APT 16K, 16th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST'' |
| Class A | Open | 3A | Sep 26, 2022 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 3rd ROOM FROM EAST, THE BATHROOM , THE PRIVATE HALLWAY LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EAST |
| Class A | Closed | 12P | Sep 23, 2022 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WOOD DOOR AT ENTRANCE AT SOUTH IN THE BATHROOM LOCATED AT APT 12P, 12th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | — | Sep 23, 2022 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY |
| Class A | Open | 12P | Sep 8, 2022 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 12P, 12th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 12P | Sep 8, 2022 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING, 8 SQ FT IN THE BATHROOM LOCATED AT APT 12P, 12th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 19B | Aug 31, 2022 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CERAMIC FLOOR TILES AND CAULKING OF VISIBLE MOLD AT NORTH, WEST AND SOUTH WALLS AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 19B, 19th STORY, 5th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 19B | Aug 31, 2022 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 2 SQUARE FEET AT THE CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 19B, 19th STORY, 5th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 15H | Jul 15, 2022 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 1 SQ. FT. AT NORTH WALL, 2 SQ. FT. AT EAST WALL, 5 SQ. FT. AT CEILING IN THE BATHROOM LOCATED AT APT 15H, 15th STORY, 3rd APARTMENT FROM SOUTH AT WEST |