stoop
Map
LeaderboardAbout
Building SafetyHousing Conditions

80-01 37 AVENUE

Queens · ZIP 11372 · BIN 4029676 · Jackson Heights · Last violation Apr 29, 2026 · Last complaint May 31, 2026

NeighborhoodJackson Heights
More violations than 99.6% of nearby buildings
More violations than 100% of buildings and more complaints than 100% of buildings in Jackson Heights. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
More activity recently than in past years
Last 2 yrs: 728 violations · 715 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
35 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous35Class Bhazardous91
Housing Preservation & Development Violations
Total violations since 2013
908
65 per year avg.↑ Up 925% in the last 2 years (728 vs 71 prior 2 yrs)
Open violations
165
Class C (immed. haz.)ⓘ35
Class B (hazardous)ⓘ91
Rent-impairingⓘ1
Open violation ages
▪ 30–90 days5% (8)
▪ 3–12 months65% (106)
▪ 1–3 years29% (47)
▪ 3+ years2% (3)
Housing Preservation & Development Complaints
Total complaints since 2004
820
36 per year avg.↑ Up 2366% in the last 2 years (715 vs 29 prior 2 yrs)
Complaint Resolution
No access17%Violation issued27%No violation31%Phone resolved23%Other2%(820)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ352 violations
Egressⓘ106 violations
Water Supplyⓘ86 violations
Paintingⓘ82 violations
Extermination & Rodent Eradicationⓘ44 violations
Lead-Based Paintⓘ40 violations
Cleaningⓘ31 violations
Carbon Monoxide Detecting Devicesⓘ17 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ245 complaints
Bldg maintenanceⓘ205 complaints
Mold & pestsⓘ93 complaints
Water & plumbingⓘ86 complaints
Electricalⓘ9 complaints
Appliancesⓘ7 complaints
Safety & fireⓘ4 complaints
Elevatorⓘ1 complaints
Hide violations ↑See complaints →

Violation log

175 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt

Building safety complaints, construction, permits, and structural issues filed with the NYC Dept. of Buildings, are scored separately.

Building Safety →
See something wrong? File a complaint with 311
Prior 4 yr.
Immed. Emergency3%4%
Emergency54%61%
Non-Emergency43%36%
(445)
(314)
Issued
Description
Class AClosed—Feb 9, 2026POST AND MAINTAIN A NOTICE · POSTING/SIGNAGE§27-2153 ADM CODE POST AND MAINTAIN A NOTICE, WRITTEN IN ENGLISH AND IN SPANISH, ON THE BUILDING ENTRANCE DOOR OR OTHER CONSPICUOUS LOCATION IN THE BUILDING COMMON AREA, STATING THAT: (1) THE BUILDING IS IN THE ALTERNATIVE ENFORCEMENT PROGRAM, (2) THAT OCCUPANTS MAY CALL 311 OR THE AEP AT 212-863-8262 TO REPORT HOUSING MAINTENANCE COMPLAINTS, (3) THE NAME, TELEPHONE, AND ADDRESS OF THE OWNER, AND, (4) THE IDENTITY OF ANY FINANCIAL INSTITUTION THAT HOLDS A MORTGAGE ON THE PROPERTY. POST
Class AOpen2KFeb 9, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST, THE 4th ROOM FROM EAST, THE BATHROOM , THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 2K, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AOpen2KFeb 9, 2026PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 2K, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AOpen3BFeb 5, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY
Class AClosed4DFeb 5, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed4CFeb 5, 2026PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL CEILINGS AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AOpen3BFeb 5, 2026PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RADIATOR IN THE 4th ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed5GDec 31, 2025REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
Class AClosed5GDec 31, 2025REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AT STEAM RISER IN THE BATHROOM LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
Class AOpen2MDec 31, 2025REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT UPPER SASH,WINDOW IN THE BATHROOM LOCATED AT APT 2M, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT EAST
Class AOpen2MDec 31, 2025REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HANDLE AT LOWER SASH, WINDOW IN THE KITCHEN LOCATED AT APT 2M, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT EAST
Class AClosed2MDec 31, 2025REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 2M, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT EAST
Class AClosed5GDec 31, 2025REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 5G, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT WEST
Class AClosed2KDec 18, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE ROOM LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed2KDec 18, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AOpen3ONov 10, 2025REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 3O, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
Class AClosed3ONov 10, 2025REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 3O, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
Class AOpen3ONov 10, 2025REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES AT FLOOR IN THE FOYER LOCATED AT APT 3O, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
Class AClosed3ONov 10, 2025REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WEST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3O, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
Class AOpen3ONov 10, 2025REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE SINK CABINET IN THE KITCHEN LOCATED AT APT 3O, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT EAST
Class AClosed6COct 28, 2025REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AOpen3BOct 22, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AOpen3BOct 22, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AOpen3BOct 22, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AOpen3BOct 22, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE KITCHEN , THE 2nd ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AOpen.2KOct 22, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST AT SOUTH, THE KITCHEN , THE 2nd ROOM FROM EAST, THE PRIVATE HALLWAY , THE BATHROOM , THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT .2K, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AOpen3BOct 22, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , 1st DOOR FROM EAST AT SOUTH WALL, CEILING, 1st DOOR FRAME FROM EAST AT SOUTH WALL, CEILING IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AOpen3BOct 22, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FROM EAST AT SOUTH WALL, 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AOpen3BOct 22, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , 1st DOOR FRAME FROM NORTH AT EAST WALL, CEILING, 1st DOOR FROM NORTH AT EAST WALL, SOUTH WALL, CEILING, SOUTH WALL, 1st DOOR FROM NORTH AT EAST WALL IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AOpen3BOct 22, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , 1st DOOR FRAME FROM EAST AT SOUTH WALL, 1st DOOR FROM EAST AT SOUTH WALL, SOUTH WALL, 1st DOOR FROM EAST AT SOUTH WALL, SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AOpen3BOct 22, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT , NORTH WALL, 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME, SOUTH WALL, 1st DOOR FRAME FROM NORTH AT EAST WALL, SOUTH WALL, NORTH WALL, 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME IN THE FOYER LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed3FOct 21, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION STEAM RISER IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH
Class AClosed5JOct 21, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed6HOct 21, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 6H, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
Class AOpen3OOct 21, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING NORTH AND WEST WALL IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 3O, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH
Class AClosed4COct 21, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION STEAM RISER IN THE KITCHEN LOCATED AT APT 4C, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed5JOct 21, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RADIATOR AT NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed4DOct 21, 2025TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 4D, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed6MOct 15, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE RADIATOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6M, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''EAST''
Class AClosed6MOct 15, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE RADIATOR IN THE 4th ROOM FROM EAST LOCATED AT APT 6M, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''EAST''
Class AClosed4EOct 15, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE HEAT RISER IN THE BATHROOM LOCATED AT APT 4E, 4th STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION ''WEST''
Class AClosed3MOct 15, 2025PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE HEAT RISER IN THE BATHROOM LOCATED AT APT 3M, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''EAST''
Class AClosed6MOct 15, 2025SECURE LOOSE MATTER · MAINTENANCE§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE ESCUTCHEON PLATE AT TOP OF RISER IN THE BATHROOM LOCATED AT APT 6M, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''EAST''
Class AClosed6MOct 15, 2025REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING RADIATOR VALVE KNOB IN THE 4th ROOM FROM EAST LOCATED AT APT 6M, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''EAST''
Class AOpen2KOct 15, 2025REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR KNOB AT ENTRANCE IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 2K, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST , SECTION ''EAST''
Class AOpen2KOct 15, 2025PROVIDE · MAINTENANCE§ 27-2005 ADM CODE PROVIDE ESCUTCHEON PLATE AT TOP OF RISER IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 4th APARTMENT FROM SOUTH AT WEST , SECTION ''EAST''
Class AClosed3MOct 15, 2025REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT DOOR AT ENTRANCE IN THE BATHROOM LOCATED AT APT 3M, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''EAST''
Class AClosed2IOct 15, 2025REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR KNOB AT ENTRANCE IN THE 1st ROOM FROM EAST LOCATED AT APT 2I, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''EAST''
Class AOpen2JOct 6, 2025REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 2J, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''356481st''
Class AClosed—Sep 22, 2025PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 6th STORY, SECTION ''NORTH''
Page 1 of 4
Next →