stoop
Map
LeaderboardAbout
Building SafetyHousing Conditions

89-04 34 AVENUE

Queens · ZIP 11372 · BIN 4035680 · Jackson Heights · Last violation May 26, 2026 · Last complaint May 29, 2026

NeighborhoodJackson Heights
More violations than 98.9% of nearby buildings
More violations than 99% of buildings and more complaints than 98% of buildings in Jackson Heights. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
More activity recently than in past years
Last 2 yrs: 846 violations · 450 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
77 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous77Class Bhazardous160
Housing Preservation & Development Violations
Total violations since 2010
1,733
102 per year avg.↑ Up 32% in the last 2 years (846 vs 639 prior 2 yrs)
Open violations
301
Class C (immed. haz.)ⓘ77
Class B (hazardous)ⓘ160
Rent-impairingⓘ5
Housing Preservation & Development Complaints
Total complaints since 2005
1,095
50 per year avg.↑ Up 25% in the last 2 years (450 vs 359 prior 2 yrs)
Complaint Resolution
No access21%Violation issued28%No violation40%Phone resolved10%Other0%(1,095)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ556 violations
Egressⓘ270 violations
Paintingⓘ180 violations
Extermination & Rodent Eradicationⓘ136 violations
Water Supplyⓘ98 violations
Cleaningⓘ74 violations
Smoke Detecting Devicesⓘ69 violations
Carbon Monoxide Detecting Devicesⓘ67 violations
Top complaint groupsⓘ
5 yrsAll time
Mold & pestsⓘ199 complaints
Bldg maintenanceⓘ176 complaints
Water & plumbingⓘ106 complaints
Heat / hot waterⓘ104 complaints
Electricalⓘ63 complaints
Safety & fireⓘ48 complaints
Appliancesⓘ22 complaints
Adminⓘ2 complaints
Outdoor / structuralⓘ1 complaints
Hide violations ↑See complaints →

Violation log

413 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt

Building safety complaints, construction, permits, and structural issues filed with the NYC Dept. of Buildings, are scored separately.

Building Safety →
See something wrong? File a complaint with 311
Open violation ages
▪ < 30 days15% (45)
▪ 30–90 days2% (7)
▪ 3–12 months23% (68)
▪ 1–3 years51% (154)
▪ 3+ years9% (27)
Prior 4 yr.
Immed. Emergency3%4%
Emergency54%40%
Non-Emergency42%56%
(204)
(642)
Issued
Description
Class AClosed4BMay 9, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AOpen4BMay 9, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed4BMay 9, 2024REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AOpen4BMay 9, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 4B, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AOpen4BMay 9, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE FOYER LOCATED AT APT 4B, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AOpen4BMay 9, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE FOYER LOCATED AT APT 4B, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed4BMay 9, 2024REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK NORTH WALL IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AOpen4BMay 9, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 4B, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed4BMay 9, 2024REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD DOOR FRAME AT NORTH WALL IN THE FOYER LOCATED AT APT 4B, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed2AMay 8, 2024REPAIR LEAKY FAUCETS · WATER SUPPLY§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS BATHTUB IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed2AMay 8, 2024REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL OUTLET AT WEST WALL IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed3KMay 6, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st WINDOW FRAME FROM WEST AT NORTH WALL, 1st DOOR FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3K, 3rd STORY, 4th APARTMENT FROM NORTH AT EAST
Class AClosed3KMay 6, 2024PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RADIATOR FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3K, 3rd STORY, 4th APARTMENT FROM NORTH AT EAST
Class AClosed3KMay 6, 2024REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3K, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed3KMay 6, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST AT SOUTH, THE FOYER , THE PRIVATE HALLWAY LOCATED AT APT 3K, 3rd STORY, 4th APARTMENT FROM NORTH AT EAST
Class AClosed3KMay 6, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL, SOUTH WALL, WEST WALL, CEILING IN THE FOYER LOCATED AT APT 3K, 3rd STORY, 4th APARTMENT FROM NORTH AT EAST
Class AClosed4LMay 6, 2024REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 2nd ROOM FROM EAST LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed—Apr 30, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS AT BULKHEAD AT SOUTH AT PUBLIC HALL, 6th STORY, SECTION ''89-04'', AT WEST
Class AClosed—Apr 30, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING, NORTH AND EAST WALL AT INTERMEDIATE LANDING TO 6TH STORY AT PUBLIC HALL, 6th STORY, SECTION ''89-04'', AT WEST
Class AOpen4BApr 29, 2024PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT RISER IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''89-14'', AT EAST
Class AOpen4BApr 29, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''89-14'', AT EAST
Class AClosed4BApr 29, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... SOUTH WALL AND WINDOW FRAME APPROXIMATELY 2 SQUARE FEET IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''89-14'', AT EAST
Class AClosed2EMar 27, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS, CEILING AND TRIM IN THE ENTIRE APARTMENT LOCATED AT APT 2E, 2nd STORY, 5th APARTMENT FROM SOUTH AT WEST , SECTION ''EAST''
Class AOpen4BMar 25, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS, CEILING AND TRIM. IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION ''EAST''
Class AClosed—Mar 21, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT HOPPER DOOR AT WEST WALL AT PUBLIC HALL, 1st STORY, SECTION ''8904''
Class AClosed4CMar 20, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... CEILING AT EAST WALL IN THE BATHROOM LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''89-14''
Class AClosed2AFeb 21, 2024TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL APPROX 4 SQ FT IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2A, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION ''89-14''
Class AClosed1JJan 24, 2024REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT FLOOR IN THE KITCHEN LOCATED AT APT 1J, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH''
Class AClosed2GJan 18, 2024REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL AND CEILING IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed2GJan 18, 2024REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE BATHROOM LOCATED AT APT 2G, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AOpen2GJan 18, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2G, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AOpen3KJan 8, 2024PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3K, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AOpen3KJan 8, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, NORTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3K, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed3KJan 8, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, WEST WALL IN THE FOYER LOCATED AT APT 3K, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AOpen3KJan 8, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3K, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed—Jan 4, 2024PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT INTERMEDIATE LANDING AT PUBLIC HALL STAIRS, 6th STORY, SECTION ''89-04'', AT SOUTH
Class AClosed3KJan 4, 2024REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT CLOSET DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 3K, 3rd STORY, SECTION ''89-04'', AT SOUTH
Class AClosed4LDec 13, 2023CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE TILES AT EAST AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 4L, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AOpen4LDec 13, 2023REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ESCUTCHEON PLATE AT RISER PIPE TOP AND BOTTOM IN THE BATHROOM LOCATED AT APT 4L, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed2ADec 13, 2023SECURE LOOSE MATTER · MAINTENANCE§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE DOOR AT 2ND WOOD BASE CABINET AT EAST WALL IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH''
Class AClosed4LDec 13, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 4L, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed4LDec 13, 2023PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RISER PIPE IN THE KITCHEN LOCATED AT APT 4L, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed2ADec 13, 2023REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WEST WALL CLOSET LATCHING ASSEMBLY IN THE 1st ROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH''
Class AClosed2ADec 13, 2023REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT SWITCH FACE COVERING IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH''
Class AClosed2ADec 13, 2023SECURE LOOSE MATTER · MAINTENANCE§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE OUTLET AT WEST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''SOUTH''
Class AClosed4LDec 13, 2023REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ESCUTCHEON PLATES AT RISER PIPE TOP AND BOTTOM IN THE KITCHEN LOCATED AT APT 4L, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed4LDec 13, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE BATHROOM LOCATED AT APT 4L, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed1PNov 9, 2023PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 1P, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''WEST''
Class AClosed2INov 8, 2023REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE KITCHEN LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''89-14'', AT SOUTH
Class AClosed2INov 8, 2023REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''89-14'', AT SOUTH
Page 4 of 9
← PrevNext →