| Class A | Closed | 6H | Mar 4, 2024 | REPAIR BROKEN, LOOSE CONNECTION · SEWERS AND DRAINAGE§ 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION DRAIN PIPE IN THE KITCHEN LOCATED AT APT 6H, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT WEST |
| Class A | Closed | 5D | Mar 4, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, SOUTH WALL IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 1K | Mar 4, 2024 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND DOWN SOUTH WALL IN THE KITCHEN LOCATED AT APT 1K, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EAST |
| Class A | Closed | — | Mar 4, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND WEST WALL AT PUBLIC HALL, 1st STORY, SECTION AT WEST |
| Class A | Closed | — | Mar 4, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT EAST WALL AT PUBLIC HALL, 1st STORY, SECTION AT EAST |
| Class A | Closed | — | Mar 4, 2024 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE COMPACTOR CLOSET AT PUBLIC HALL, 3rd STORY, SECTION AT EAST |
| Class A | Closed | 1K | Mar 4, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 1K, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EAST |
| Class A | Closed | 1K | Mar 4, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CLOSET AT NORTH IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1K, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EAST |
| Class A | Closed | 2N | Mar 4, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 2N, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION AT EAST |
| Class A | Closed | 4H | Mar 4, 2024 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE FOYER LOCATED AT APT 4H, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 6E | Mar 4, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AT BATHTUB PERIMETER IN THE 3rd BATHROOM FROM NORTH AT EAST LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WEST |
| Class A | Closed | 5S | Mar 4, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE COUNTERBALANCE AT LOWER SASH AT SOUTH 2 WINDOW IN THE 2nd ROOM FROM EAST LOCATED AT APT 5S, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST |
| Class A | Closed | 6H | Mar 4, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATH TUB PERIMITER IN THE BATHROOM LOCATED AT APT 6H, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT WEST |
| Class A | Closed | 3R | Mar 4, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST AT SOUTH, THE 1st ROOM FROM EAST AT NORTH, THE 1st BATHROOM FROM EAST, THE 4th ROOM FROM EAST, THE PRIVATE HALLWAY , THE 2nd BATHROOM FROM EAST, THE FOYER LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 4N | Mar 4, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 4N, 4th STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class A | Closed | 5S | Mar 4, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE COUNTERBALANCE AT LOWER SASH AT WINDOW SOUTH 1 IN THE 2nd ROOM FROM EAST LOCATED AT APT 5S, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST |
| Class A | Closed | 6H | Mar 4, 2024 | REPAIR LEAKY FAUCETS · WATER SUPPLY§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS IN BATH TUB IN THE BATHROOM LOCATED AT APT 6H, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT WEST |
| Class A | Closed | 6E | Mar 4, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL AND WINDOW STOOL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT WEST |
| Class A | Closed | 6H | Mar 4, 2024 | REPAIR LEAKY FAUCETS · WATER SUPPLY§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 6H, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT WEST |
| Class A | Closed | 4H | Mar 4, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 1st ROOM FROM EAST, THE KITCHEN , THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 4H, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 4H | Mar 4, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 1 SQ.FT AT NORTH WALL IN THE BATHROOM LOCATED AT APT 4H, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 5D | Mar 4, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM SOUTH AT WEST WALL WALL IN THE FOYER LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 5M | Mar 4, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 5M, 6th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class A | Closed | 4M | Mar 4, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 6 SQ FT OF MOLD AT EAST AND NORTH WALLS IN THE BATHROOM LOCATED AT APT 4M, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT EAST |
| Class A | Closed | — | Mar 4, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 4H | Mar 4, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 2 SQ.FT AT CEILING IN THE BATHROOM LOCATED AT APT 4H, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 5D | Mar 4, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL, CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 3V | Mar 4, 2024 | REFIT DOORS ETC. · EGRESS§ 27-2005 HMC: REFIT DOOR IN THE BATHROOM LOCATED AT APT 3V, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION AT EAST |
| Class A | Closed | 3G | Mar 4, 2024 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SHUT OFF VALVE AT RADIATOR IN THE 3rd BATHROOM FROM NORTH LOCATED AT APT 3G, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST |
| Class A | Closed | 3V | Mar 4, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 3V, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION AT EAST |
| Class A | Closed | 3V | Mar 4, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WALLD AND CEILING IN THE KITCHEN LOCATED AT APT 3V, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION AT EAST |
| Class A | Closed | — | Feb 20, 2024 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT COMPACTOR CLOSET, 4th STORY, SECTION ''84ST'' |
| Class A | Closed | — | Feb 20, 2024 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT COMPACTOR CLOSET, 2nd STORY, SECTION ''84ST'' |
| Class A | Closed | 1K | Feb 1, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 1K, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class A | Closed | 1K | Feb 1, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM SOUTH AT WEST WALL WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 1K, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class A | Closed | 1K | Feb 1, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM SOUTH AT WEST WALL DOOR, 1st CLOSET FROM EAST AT SOUTH WALL DOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT 1K, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class A | Closed | 1K | Feb 1, 2024 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RADIATOR FROM WEST AT NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 1K, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class A | Closed | 3K | Feb 1, 2024 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM TELECOMMUNICATION SYSTEM FROM VESTIBULE TO WEST WALL IN THE KITCHEN LOCATED AT APT 3K, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EAST |
| Class A | Closed | — | Feb 1, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST SECTION, 35-63 83RD STREET, AT CEILING AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 3K | Feb 1, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 3K, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EAST |
| Class A | Closed | 2E | Feb 1, 2024 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE FROM VESTIBULE TO SOUTH WALL IN THE KITCHEN LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''35-63'', AT WEST |
| Class A | Closed | 1K | Feb 1, 2024 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RADIATOR FROM WEST AT NORTH WALL IN THE KITCHEN LOCATED AT APT 1K, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class A | Closed | 1K | Feb 1, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM EAST AT SOUTH WALL, SOUTH WALL IN THE BATHROOM LOCATED AT APT 1K, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class A | Closed | 3K | Feb 1, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 3K, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT EAST |
| Class A | Closed | 1L | Jan 29, 2024 | REPAIR · MAINTENANCE§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC FIXTURES AT CEILING IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 6R | Jan 10, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 6R, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 4C | Jan 4, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 4 SQ FT AT CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 4C, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | — | Dec 27, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING (35-63 83 ST) AT PUBLIC HALL, 1st STORY |
| Class A | Closed | 4T | Dec 20, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st CLOSET FROM EAST AT SOUTH WALL DOOR, 2nd CLOSET FROM EAST AT SOUTH WALL DOOR IN THE PRIVATE HALLWAY LOCATED AT APT 4T, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''EAST'' |
| Class A | Closed | 6K | Nov 27, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT UPPER CABINET AT WEST WALL IN THE KITCHEN LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |