| Class B | ClosedRENT IMPAIRING | 6K | Jan 29, 2025 | LEAKY ROOF · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT CLOSET IN THE 2nd ROOM FROM EAST LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class C | Closed | 6K | Jan 29, 2025 | ABATE THE NUISANCE · MAINTENANCE§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDING THE MAXIMUM TEMPERATURE REQUIREMENT OF 130 DEGREES FAHRENHEIT IN THE ENTIRE APARTMENT LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class B | Closed | 6K | Jan 29, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE FOYER LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class B | Closed | 6K | Jan 29, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class A | Closed | — | Jan 28, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY, SECTION ''WEST'' |
| Class B | Closed | — | Jan 28, 2025 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT VESTIBULE , 1st STORY |
| Class B | Closed | — | Jan 28, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND WEST WALL AT VESTIBULE , 1st STORY |
| Class B | ClosedRENT IMPAIRING | 6J | Jan 28, 2025 | LEAKY ROOF · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE FOYER LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' |
| Class B | Closed | 1U | Jan 28, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1U, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class B | Closed | 6J | Jan 28, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AT SOUTH WALL AT BATHTUB IN THE BATHROOM LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' |
| Class B | Closed | 3L | Jan 28, 2025 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE KITCHEN LOCATED AT APT 3L, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class B | Closed | 6J | Jan 28, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE FOYER LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' |
| Class A | Closed | 3L | Jan 28, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3L, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class C | Closed | — | Jan 28, 2025 | MAKE DOORS SELF-CLOSING · EGRESS§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT HOOPER DOOR AT TRASH CHUTE AT COMPACTOR CLOSET AT PUBLIC HALL , 1st STORY |
| Class B | Closed | 5T | Jan 28, 2025 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 5T, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class C | Closed | 1U | Jan 28, 2025 | ABATE THE NUISANCE OF ROACHES · EXTERMINATION & RODENT ERADICATIONHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1U, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | — | Jan 28, 2025 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT COMPACTOR CLOSET AT PUBLIC HALL, 2nd STORY |
| Class B | Open | 6J | Jan 28, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL GLAZE AT BATHTUB IN THE BATHROOM LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' |
| Class B | Closed | 3L | Jan 28, 2025 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND WEST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3L, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class B | Closed | 3L | Jan 28, 2025 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3L, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class B | Closed | 6J | Jan 28, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, EAST WALL AND WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' |
| Class C | Closed | — | Jan 28, 2025 | MAKE DOORS SELF-CLOSING · EGRESS§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT HOOPER DOOR AT TRASH CHUTE AT COMPACTOR CLOSET AT PUBLIC HALL, 5th STORY, SECTION ''WEST'' |
| Class B | ClosedRENT IMPAIRING | 6J | Jan 28, 2025 | LEAKY ROOF · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' |
| Class B | Closed | — | Jan 28, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 1st STORY, SECTION ''WEST'' |
| Class B | Closed | 6J | Jan 28, 2025 | REPAIR OR REPLACE SMOKE DETECTOR · SMOKE DETECTING DEVICES§ 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' |
| Class A | Closed | — | Jan 28, 2025 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT COMPACTOR CLOSET AT PUBLIC HALL, 6th STORY |
| Class B | Closed | 6J | Jan 28, 2025 | REPAIR OR REPLACE CO DETECTOR · CARBON MONOXIDE DETECTING DEVICES§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' |
| Class B | ClosedRENT IMPAIRING | 5T | Jan 28, 2025 | REMOVE OBSTRUCTIONS · SEWERS AND DRAINAGE§ 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE AT SINK IN THE KITCHEN LOCATED AT APT 5T, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class B | Closed | 5T | Jan 28, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE KITCHEN LOCATED AT APT 5T, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class B | Closed | 6J | Jan 28, 2025 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL AND WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' |
| Class B | Closed | 3L | Jan 28, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3L, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class A | Closed | — | Jan 28, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WEST WALL AT VESTIBULE , 1st STORY |
| Class C | Closed | 1U | Jan 28, 2025 | MAKE DOORS SELF-CLOSING · EGRESS§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AND LOCK SET AT DOOR IN THE ENTRANCE LOCATED AT APT 1U, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class B | Closed | 1K | Jan 27, 2025 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 1K, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class B | Closed | 1K | Jan 27, 2025 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 1K, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class B | Closed | 1K | Jan 27, 2025 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING AND EAST WALL IN THE KITCHEN LOCATED AT APT 1K, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class B | Closed | — | Jan 27, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT CEILING AND EAST WALL AT PUBLIC HALL, 1st STORY, SECTION AT EAST |
| Class B | Closed | 1K | Jan 27, 2025 | REPAIR OR REPLACE SMOKE DETECTOR · SMOKE DETECTING DEVICES§ 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1K, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class B | ClosedRENT IMPAIRING | — | Jan 27, 2025 | REMOVE ENCUMBRANCES · EGRESS§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CONSTRUCTION MATERIALS AT PUBLIC HALL, 6th STORY, SECTION AT EAST |
| Class A | Closed | — | Jan 27, 2025 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND EAST WALL AT PUBLIC HALL, 1st STORY, SECTION AT EAST |
| Class B | Closed | 6R | Jan 27, 2025 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH AND EAST WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 6R, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST'' |
| Class B | ClosedRENT IMPAIRING | 6R | Jan 27, 2025 | LEAKY ROOF · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE FOYER LOCATED AT APT 6R, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST'' |
| Class B | Closed | — | Jan 27, 2025 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY, SECTION AT EAST |
| Class B | Closed | 1K | Jan 27, 2025 | REPAIR OR REPLACE CO DETECTOR · CARBON MONOXIDE DETECTING DEVICES§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1K, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''EAST'' |
| Class B | ClosedRENT IMPAIRING | 6R | Jan 27, 2025 | LEAKY ROOF · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6R, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST'' |
| Class B | Closed | 4T | Jan 22, 2025 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 4T, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class B | Closed | 1M | Jan 22, 2025 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 1M, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1M | Jan 22, 2025 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 1M, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Class B | Closed | 3I | Jan 22, 2025 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3I, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class B | Closed | 4T | Jan 22, 2025 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND WEST WALL IN THE KITCHEN LOCATED AT APT 4T, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST |