Class AClosed
Aug 25, 2022Apt 10J
REFIT DOORS ETC. · EGRESS
§ 27-2005 ADM CODE REFIT LOWER WINDOW SASH AT EAST 1 WINDOW. IN THE 1st ROOM FROM NORTH LOCATED AT APT 10J, 9th STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION ''F-O''
Class AClosed
Jul 29, 2022Apt 10J
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX 2 SQ FT IN THE BATHROOM LOCATED AT APT 10J, 9th STORY, 5th APARTMENT FROM EAST AT SOUTH
Class AClosed
Jul 29, 2022Apt 10J
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 10J, 9th STORY, 5th APARTMENT FROM EAST AT SOUTH
Class AClosed
Jul 29, 2022Apt 10J
REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 10J, 9th STORY, 5th APARTMENT FROM EAST AT SOUTH
Class AClosed
Jun 15, 2022Apt 5E
SECURE LOOSE MATTER · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE BASEBOARD RADIATOR COVER AT EAST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5E, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AOpen
Jun 15, 2022Apt 5E
REFIT DOORS ETC. · EGRESS
§ 27-2005 ADM CODE REFIT DOOR IN THE TERRACE LOCATED AT APT 5E, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed
Jun 15, 2022Apt 5E
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL INSIDE SINK BASE CABINET IN THE KITCHEN LOCATED AT APT 5E, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed
Jun 9, 2022Apt 4E
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT SOUTHEAST CLOSET WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 4E, 4th STORY, 5th APARTMENT FROM NORTH AT EAST
Class AClosed
Mar 31, 2022Apt 5E
REPAIR · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MECHANICAL DRAIN STOPPER. AT WASH BASIN. IN THE BATHROOM LOCATED AT APT 5E, 4th STORY, SECTION ''A-E''
Class AClosed
Mar 31, 2022Apt 5E
REPAIR · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BASEBOARD RADIATOR COVER. IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 5E, 4th STORY, SECTION ''A-E''
Class AClosed
Mar 30, 2022Apt 5E
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL AND EAST WALL. IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5E, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''A-E''
Class AClosed
Mar 30, 2022Apt 12N
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING. IN THE 1st ROOM FROM EAST LOCATED AT APT 12N, 11th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''F-O''
Class AClosed
Mar 30, 2022Apt 12N
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL. IN THE 1st ROOM FROM EAST LOCATED AT APT 12N, 11th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''F-O''
Class AClosed
Mar 30, 2022Apt 5E
REFIT DOORS ETC. · EGRESS
§ 27-2005 ADM CODE REFIT LOWER WINDOW SASH AT EAST WALL. IN THE 1st ROOM FROM NORTH LOCATED AT APT 5E, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''A-E''
Class AClosed
Mar 30, 2022Apt 5E
REFIT DOORS ETC. · EGRESS
§ 27-2005 ADM CODE REFIT LOWER SASH WINDOW. IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 5E, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''A-E''
Class AClosed
Mar 30, 2022Apt 5E
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WINDOW FRAME AT EAST WALL. IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 5E, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''A-E''
Class AClosed
Mar 30, 2022Apt 5E
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING AT CLOSET. IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 5E, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''A-E''
Class AOpen
Mar 30, 2022Apt 12N
REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING. IN THE 1st ROOM FROM EAST LOCATED AT APT 12N, 11th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''F-O''
Class AClosed
Dec 16, 2021Apt 12N
RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED
§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE DOOR SEAL AT REFRIGERATOR IN THE KITCHEN LOCATED AT APT 12N, 12th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed
Dec 8, 2021Apt 17K
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 17K, 17th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Oct 15, 2021Apt 4C
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING IN THE BATHROOM LOCATED AT APT 4C, 3rd STORY, 7th APARTMENT FROM EAST AT SOUTH
Class AClosed
Oct 8, 2021
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING IN THE MAILROOM, PUBLIC HALL , 1st STORY
Class AClosed
Oct 8, 2021
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE MAILROOM, PUBLIC HALL , 1st STORY
Class AClosed
Jun 8, 2021Apt 1E
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1E, 1st APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed
Sep 3, 2019Apt 12K
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM SOUTH AT WEST WALL CEILING, EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 12K, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Sep 3, 2019Apt 12K
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 1st CLOSET FROM NORTH AT EAST WALL CEILING IN THE 3rd ROOM FROM NORTH AT CENTER LOCATED AT APT 12K, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Sep 3, 2019Apt 12K
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 12K, 11th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Jun 10, 2019Apt 16F
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE KITCHEN LOCATED AT APT 16F, 14th STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed
Jun 10, 2019Apt 16F
REFIT DOORS ETC. · EGRESS
§ 27-2005 ADM CODE REFIT LOWER WINDOW SASH IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 16F, 14th STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed
Jul 19, 2018Apt 7C
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd BATHROOM , THE 1st BATHROOM LOCATED AT APT 7C, 7th STORY, 3rd APARTMENT FROM EAST AT SOUTH
Class AClosed
Sep 14, 2017Apt 6K
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS, CEILINGS AND TRIMS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 6K, 4th STORY, APARTMENT AT WEST
Class AClosed
Sep 14, 2017Apt 6K
REPLACE · MAINTENANCE
§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING WOODEN BASEBOARD AT THE SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 6K, 4th STORY, APARTMENT AT WEST
Class AClosed
Aug 29, 2017Apt 17C
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT SOUTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 17C, 15th STORY, 7th APARTMENT FROM SOUTH AT WEST
Class AClosed
Aug 21, 2017Apt 6K
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Jul 14, 2017Apt 17L
REPAIR · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL WALL OUTLET AT THE EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 17L, 15th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed
Jul 14, 2017Apt 17L
SECURE LOOSE MATTER · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE DRAIN COVER PLATE AT THE BATHTUB IN THE 1st BATHROOM FROM EAST LOCATED AT APT 17L, 15th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed
Jul 14, 2017Apt 17L
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 17L, 15th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed
Jul 14, 2017Apt 17L
RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED
§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE CAULKING AT THE BATHTUB IN THE 1st BATHROOM FROM EAST LOCATED AT APT 17L, 15th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed
Jul 25, 2016Apt 4D
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd BATHROOM LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed
Jul 25, 2016Apt 4D
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY , THE 1st BATHROOM LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed
Mar 17, 2016Apt 16J
TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING
§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AROUND BATHTUB 10 SQ.FT IN THE BATHROOM LOCATED AT APT 16J, 15th STORY, 5th APARTMENT FROM NORTH AT EAST
Class AClosed
Mar 17, 2016Apt 16J
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AROUND THE BATHTUB IN THE BATHROOM LOCATED AT APT 16J, 15th STORY, 5th APARTMENT FROM NORTH AT EAST
Class AClosed
Mar 17, 2016Apt 16J
REPAIR PLASTER · MAINTENANCE
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH WALL IN THE BATHROOM LOCATED AT APT 16J, 15th STORY, 5th APARTMENT FROM NORTH AT EAST
Class AClosed
Dec 24, 2015Apt 6K
REFIT DOORS ETC. · EGRESS
§ 27-2005 ADM CODE REFIT COUNTER BALANCE AT UPPER SASH WINDOW IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6K, 7th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Dec 24, 2015Apt 6K
REFIT DOORS ETC. · EGRESS
§ 27-2005 ADM CODE REFIT COUNTER BALANCE AT UPPER SASH WINDOW IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 6K, 7th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed
Jul 27, 2015Apt 5H
REPAIR WITH SIMILAR MATERIAL · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5H, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Jul 23, 2015Apt 5H
PAINT · PAINTING
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS AND WALLS LOCATED AT APT 5H, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Jul 23, 2015Apt 5H
REPAIR · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BASE BOARD RADIATOR AT EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5H, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Jul 23, 2015Apt 5H
REPAIR · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CLOSET DOOR AT NORTH WALL IN THE FOYER LOCATED AT APT 5H, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed
Jul 23, 2015Apt 5H
REPAIR · MAINTENANCE
§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BASE BOARD RADIATOR AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5H, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST