| Class A | Closed | 4J | Oct 10, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 4J, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 4J | Oct 10, 2024 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st BATHROOM FROM EAST LOCATED AT APT 4J, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 6C | Oct 10, 2024 | REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING MISSING SLIDE DOOR AT CLOSET AT WEST WALL IN THE FOYER LOCATED AT APT 6C, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 6B | Oct 10, 2024 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 6E | Oct 10, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE ENTRANCE , THE PRIVATE HALLWAY , THE BATHROOM LOCATED AT APT 6E, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 4J | Oct 10, 2024 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 4J, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 6B | Oct 10, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 6B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 6B | Oct 10, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 4J | Oct 10, 2024 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE FOYER LOCATED AT APT 4J, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 4J | Oct 10, 2024 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 4J, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 4J | Oct 10, 2024 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 1st BATHROOM FROM EAST LOCATED AT APT 4J, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3J | Oct 9, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT NORTH WALL AND CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 3J, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Open | 3A | Oct 9, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3A, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class A | Open | 3A | Oct 9, 2024 | RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL WATER CLOSET IN THE BATHROOM LOCATED AT APT 3A, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 3J | Oct 9, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE 1st ROOM FROM EAST AT SOUTH, THE 2nd BATHROOM FROM NORTH, THE 1st ROOM FROM EAST AT NORTH, THE 3rd ROOM FROM EAST AT NORTH, THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 3J, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 7E | Oct 7, 2024 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RADIATORS. IN THE ENTIRE APARTMENT LOCATED AT APT 7E, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Open | 6K | Oct 7, 2024 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RADIATORS. IN THE ENTIRE APARTMENT LOCATED AT APT 6K, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 6B | Sep 16, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd BATHROOM FROM NORTH, THE 2nd ROOM FROM NORTH AT EAST, THE KITCHEN , THE 1st ROOM FROM NORTH AT WEST, THE 1st ROOM FROM NORTH AT EAST, THE PRIVATE HALLWAY , THE 3rd ROOM FROM NORTH, THE 1st BATHROOM FROM NORTH LOCATED AT APT 6B, 5th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 6B | Sep 16, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 3 SQ FEET CEILING IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 6B, 5th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 7B | Aug 15, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, EAST WALL IN THE BATHROOM LOCATED AT APT 7B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 7B | Aug 15, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, WEST WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 7B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Open | 7B | Aug 15, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, SOUTH WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 7B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 7B | Aug 6, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET EAST WALL IN THE BATHROOM LOCATED AT APT 7B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 4H | Aug 6, 2024 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SILICON CAULKING AROUND BATHTUB PERIMETER IN THE BATHROOM LOCATED AT APT 4H, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | — | Jun 17, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING. AT PUBLIC HALL |
| Class A | Open | 5D | Jun 14, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS. IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 7C | Jun 12, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT SOUTH WALL AND CEILING (APPRX.5 SQ.FT.) IN THE 2nd ROOM FROM EAST LOCATED AT APT 7C, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | — | Apr 5, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING. AT PUBLIC HALL, 6th STORY |
| Class A | Open | 6D | Apr 1, 2024 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE 3rd ROOM FROM EAST AT NORTH LOCATED AT APT 6D, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3A | Mar 28, 2024 | RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ... IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | — | Mar 6, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS. AT LAUNDRY ROOM |
| Class A | Open | 7B | Feb 1, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST AT SOUTH, THE 1st BATHROOM FROM NORTH, THE 1st ROOM FROM EAST AT SOUTH, THE 3rd ROOM FROM EAST LOCATED AT APT 7B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 7B | Feb 1, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... , SOUTH WALL, 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 7B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 7B | Feb 1, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... , SOUTH WALL, WEST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 7B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 7B | Jan 8, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 7B, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 3B | Jan 8, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st CLOSET FROM WEST AT NORTH WALL CEILING, 1st CLOSET FROM WEST AT NORTH WALL WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 3B | Jan 8, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, EAST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 3B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 4J | Jan 8, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY LOCATED AT APT 4J, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | — | Jan 3, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 6th STORY |
| Class A | Closed | — | Jan 3, 2024 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND EAST WALL AT BASEMENT |
| Class A | Closed | — | Jan 3, 2024 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 2 SQ.FT AT EAST WALL AT BASEMENT |
| Class A | Closed | 5A | Dec 28, 2023 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 8 SQ. FT EAST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 5A | Dec 28, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 1st ROOM FROM EAST AT NORTH, THE 4th ROOM FROM EAST, THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 5A | Dec 28, 2023 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... , CEILING IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 5A | Dec 28, 2023 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 8 SQ. FT. NORTH WALL, 1st WINDOW FRAME FROM WEST AT NORTH WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3B | Dec 18, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3B | Dec 18, 2023 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 9 SQ.FT. 1st CLOSET FROM SOUTH AT WEST WALL WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3B | Dec 18, 2023 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 4 SQ.FT. CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Open | 6J | Dec 15, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 6J, 5th STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3B | Dec 5, 2023 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 6 SQFT AT CEILING AND NORTH WALL INSIDE THE CLOSET IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |