| Class A | Closed | 3Q | Sep 14, 2023 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING IN THE BATHROOM LOCATED AT APT 3Q, 3rd STORY, 4th APARTMENT FROM NORTH AT EAST |
| Class A | Open | 1U | Sep 13, 2023 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RADIATOR COVER AT EAST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 1U, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1U | Sep 13, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 1U, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1M | Aug 24, 2023 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BASE AT CABINET UNDER THE SINK IN THE KITCHEN LOCATED AT APT 1M, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 1M | Aug 23, 2023 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 1M, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 4X | Jun 9, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALL THROUGHOUT IN THE BATHROOM LOCATED AT APT 4X, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 3J | Jun 1, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 3J, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 1M | May 2, 2023 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODBASE INSIDE CABINET UNDER THE SINK IN THE KITCHEN LOCATED AT APT 1M, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 1J | Apr 3, 2023 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CLOSET DOORS AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1J, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH |
| Class A | Closed | — | Apr 3, 2023 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE STAIRS LANDING AND FLOORS AT ALL STORIES AT PUBLIC HALL |
| Class A | Open | 1J | Apr 3, 2023 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 4th ROOM FROM NORTH LOCATED AT APT 1J, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH |
| Class A | Closed | — | Mar 29, 2023 | FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. |
| Class A | Closed | 4G | Mar 22, 2023 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE METAL COVER TO RADIATOR AT SOUTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 4G | Mar 22, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH, WEST AND EAST WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 4G | Mar 13, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH |
| Class A | Closed | 4G | Mar 13, 2023 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH |
| Class A | Closed | 4G | Mar 13, 2023 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL OUTLETS SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH |
| Class A | Closed | 4G | Mar 13, 2023 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT WINDOW FRAME AT EAST WALL APPROX 2 SQ.FT IN THE 3rd ROOM FROM EAST LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH |
| Class A | Closed | 4G | Mar 13, 2023 | RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE ENTRACE DOOR IN THE 3rd ROOM FROM EAST LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH |
| Class A | Closed | 4G | Mar 13, 2023 | RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE ENTRANCE DOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH |
| Class A | Closed | 4G | Mar 13, 2023 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT WINDOW FRAME AT EAST WALL APPROX 4 SQ.FT IN THE 1st ROOM FROM EAST LOCATED AT APT 4G, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH |
| Class A | Closed | 4U | Mar 1, 2023 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX 4 SQ.FT AND NORTH WALL APPROX 2 2Q.FT IN THE BATHROOM LOCATED AT APT 4U, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Class A | Open | 4U | Mar 1, 2023 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 4U, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Class A | Closed | — | Dec 5, 2022 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT THE DOOR AT PUBLIC HALL STAIRS, 2nd STORY, SECTION AT NORTH |
| Class A | Closed | 1B | Dec 5, 2022 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT THE DOOR IN THE ENTRANCE LOCATED AT APT 1B, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH |
| Class A | ClosedRENT IMPAIRING | 50 | Oct 11, 2022 | LEAKY FLUSH PIPE CONNECTION · SEWERS AND DRAINAGE§ 27-2026 ADM CODE REPAIR LEAKY WATER CLOSET FLUSH PIPE CONNECTION .. IN THE BATHROOM LOCATED AT APT 50, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 5J | Oct 4, 2022 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH |
| Class A | Closed | 5J | Oct 4, 2022 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE VISIBLE EVIDENCE OF MOLD GROUT NORTH, EAST, AND WEST WALLS AT BATHTUB IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH |
| Class A | Closed | 5J | Jul 22, 2022 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE VISIBLE EVIDENCE OF MOLD GROUT EAST, WEST, AND SOUTH WALLS AT BATHTUB IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH |
| Class A | Closed | 5J | Jul 22, 2022 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH |
| Class A | Closed | 5J | Jul 22, 2022 | RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE RUBBER GASKET REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH |
| Class A | Closed | 5J | Jul 22, 2022 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH |
| Class A | Closed | — | Jul 22, 2022 | CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOORS ALL STORIES AT PUBLIC HALL, SECTION AT SOUTH |
| Class A | Closed | 3A | Jul 19, 2022 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... EAST WALL APPROX 2 SQ.FT AND SOUTH WALL APPROX 2 SQ.FT IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH |
| Class A | Closed | 4E | Jul 12, 2022 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH |
| Class A | Closed | 4E | Jul 12, 2022 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERATIVE LIGHT FIXTURE AT CEILING IN THE FOYER LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH |
| Class A | Closed | 4Q | Jun 8, 2022 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION RADIATOR COVER AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 4Q, 4th STORY, 4th APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 1P | May 20, 2022 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE KITCHEN LOCATED AT APT 1P, 1st STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH |
| Class A | Closed | 1P | May 20, 2022 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CLOSET DOOR AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 1P, 1st STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION AT SOUTH |
| Class A | Closed | — | Mar 8, 2022 | FILE ANNUAL BEDBUG REPORT · FILING: BEDBUGS(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. |
| Class A | Closed | 1M | Feb 17, 2022 | RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE RUBBER GASKET AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 1M, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH |
| Class A | Closed | 1M | Feb 17, 2022 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... NORTH WALL APPROX 2 SQ.FT IN THE BATHROOM LOCATED AT APT 1M, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH |
| Class A | Closed | 4E | Nov 24, 2021 | RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE RUBBER GASKET AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Open | 4U | Nov 18, 2021 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT ENTRANCE DOOR IN THE 1st ROOM FROM EAST LOCATED AT APT 4U, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class A | Open | 4U | Nov 18, 2021 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WEST WALL IN THE KITCHEN LOCATED AT APT 4U, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class A | Open | 4U | Nov 18, 2021 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT THE CLOSET DOOR AT WEST WALL IN THE FOYER LOCATED AT APT 4U, 4th STORY, 3rd APARTMENT FROM WEST AT NORTH |
| Class A | Closed | 1M | Sep 29, 2021 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 4 SQ.FT.AT CEILING AND WEST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 1M, 1st STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | LA | Aug 24, 2021 | REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODBASE INSIDE CABINET AT NORTH WALL IN THE KITCHEN LOCATED AT BSMT-APT LA, 1st BSMT-APT FROM EAST AT SOUTH |
| Class A | Closed | 3G | Jun 8, 2021 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 1SQ.FT. AT CEILING IN THE BATHROOM LOCATED AT APT 3G, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 3G | Jun 8, 2021 | REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING UPPER CABINET DOOR AT NORTH WALL IN THE KITCHEN LOCATED AT APT 3G, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH |