| Class A | Closed | 3E | Sep 2, 2016 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3E, 3rd STORY, 4th APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3V | Sep 2, 2016 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 3V, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 3O | Aug 29, 2016 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 3O, 3rd STORY, APARTMENT AT EAST |
| Class A | Closed | LT | Aug 23, 2016 | RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WALL MEDICINE CABINET IN THE BATHROOM LOCATED AT APT LT, APARTMENT AT EAST |
| Class A | Closed | 2D | Jul 1, 2016 | RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL .. IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | LT | Jun 30, 2016 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT LT, 1st STORY, APARTMENT AT SOUTH |
| Class A | Closed | LT | Jun 30, 2016 | TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... CEILING APPROX 2 SQ FT IN THE BATHROOM LOCATED AT APT LT, 1st STORY, APARTMENT AT SOUTH |
| Class A | Closed | LT | Mar 9, 2016 | REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT LT, 1st STORY, APARTMENT AT SOUTH |
| Class A | Closed | — | Nov 23, 2015 | REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRTICAL OUTLETS SAFETY COVERS/CAPS AT PUBLIC HALL |
| Class A | Closed | 1R | Nov 23, 2015 | SECURE LOOSE MATTER · MAINTENANCE§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE UNHINGED CABINET DOOR AT WEST WALL IN THE KITCHEN LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 2C | Nov 19, 2015 | RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WOOD BOTTOM TO BASE CABINET IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH |
| Class A | Closed | LS | Sep 21, 2015 | REPLACE · MAINTENANCE§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING VINYL TILES AT CONCRETE FLOOR IN THE KITCHEN LOCATED AT BSMT-APT LS, 2nd BSMT-APT FROM SOUTH AT WEST |
| Class A | Closed | LT | Jul 1, 2015 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND WALLS IN THE BATHROOM LOCATED AT APT LT, APARTMENT AT SOUTH , SECTION ''M-Z'', AT SOUTH |
| Class A | Closed | 1T | Jun 26, 2015 | REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 1T, 1st STORY |
| Class A | Closed | 1V | Jun 17, 2015 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT UPPER AND LOWER SASHES AT ALL WINDOWS IN THE ENTIRE APARTMENT LOCATED AT APT 1V, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''M-Z'' |
| Class A | Closed | 2D | Feb 6, 2015 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH AT WEST, THE 2nd ROOM FROM NORTH, THE BATHROOM , THE FOYER LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 2X | Oct 6, 2014 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST AT SOUTH, THE 1st ROOM FROM EAST AT SOUTH, THE BATHROOM , THE PRIVATE HALLWAY LOCATED AT APT 2X, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH |
| Class A | Closed | 1T | Sep 30, 2014 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 1T, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''L-W'' |
| Class A | Closed | — | Jan 6, 2014 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING BASEMENT STORY AT PUBLIC HALL |
| Class A | Closed | 2D | Oct 7, 2013 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WOOD FLOOR AT NORTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 2D | Oct 7, 2013 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 2D | Oct 7, 2013 | REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE FLOOR CERAMIC TILES IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WEST |
| Class A | Closed | 4M | May 1, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 4M, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ''M-Z'' |
| Class A | Closed | 6R | Jan 2, 2013 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 6R, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''M-Z'' |
| Class A | Closed | 4O | Oct 18, 2012 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION INTERIOR WINDOWS FRAMES IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4O, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''M-Z'' |
| Class A | Closed | 4O | Oct 18, 2012 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 4O, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''M-Z'' |
| Class A | Closed | 4O | Oct 18, 2012 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALLS IN THE KITCHEN LOCATED AT APT 4O, 4th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''M-Z'' |
| Class A | Closed | 3C | Sep 26, 2012 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT WOOD DOORS AT BASE CABINETS IN THE KITCHEN LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''A-L'' |
| Class A | Closed | 3C | Sep 26, 2012 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT WOOD DOORS AT WALL CABINETS IN THE KITCHEN LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''A-L'' |
| Class A | Closed | 3J | Jan 9, 2012 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE FOYER , THE 1st ROOM FROM NORTH, THE 3rd ROOM FROM NORTH AT EAST, THE PRIVATE HALLWAY LOCATED AT APT 3J, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 5B | Oct 24, 2011 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT NORTH |
| Class A | Closed | 4F | Apr 12, 2011 | PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, WEST WALL IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH |
| Class A | Closed | 3C | Nov 29, 2010 | REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT WALL CABINETS DOORS TOTAL #2 AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 3C, 3rd STORY |
| Class A | Closed | 3J | Dec 28, 2005 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 3J, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 3J | Dec 28, 2005 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3J, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST |
| Class A | Closed | 1C | Nov 1, 2004 | PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 1C, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST |