stoop
Map
LeaderboardAbout
Building SafetyHousing Conditions

35 HOLLAND AVENUE

Staten Island · ZIP 10303 · BIN 5109140 · Mariner's Harbor-Arlington-Graniteville · Last violation Apr 14, 2026 · Last complaint May 30, 2026

NeighborhoodMariner's Harbor-Arlington-Graniteville
More violations than 93.5% of nearby buildings
More violations than 94% of buildings and more complaints than 91% of buildings in Mariner's Harbor-Arlington-Graniteville. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 168 violations · 81 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
8 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous8Class Bhazardous29
Housing Preservation & Development Violations
Total violations since 2003
1,724
72 per year avg.↓ Down 37% in the last 2 years (168 vs 267 prior 2 yrs)
Open violations
41
Class C (immed. haz.)ⓘ8
Class B (hazardous)ⓘ29
Rent-impairingⓘ5
Housing Preservation & Development Complaints
Total complaints since 2003
1,887
79 per year avg.↓ Down 43% in the last 2 years (81 vs 142 prior 2 yrs)
Complaint Resolution
No access17%Violation issued24%No violation35%Phone resolved24%Other0%(1,887)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ161 violations
Egressⓘ93 violations
Paintingⓘ37 violations
Water Supplyⓘ37 violations
Cleaningⓘ34 violations
Carbon Monoxide Detecting Devicesⓘ30 violations
Smoke Detecting Devicesⓘ29 violations
Extermination & Rodent Eradicationⓘ25 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ143 complaints
Water & plumbingⓘ73 complaints
Mold & pestsⓘ40 complaints
Bldg maintenanceⓘ26 complaints
Appliancesⓘ8 complaints
Electricalⓘ6 complaints
Safety & fireⓘ3 complaints
Hide violations ↑See complaints →

Violation log

507 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt

Building safety complaints, construction, permits, and structural issues filed with the NYC Dept. of Buildings, are scored separately.

Building Safety →
See something wrong? File a complaint with 311
Open violation ages
▪ 30–90 days12% (5)
▪ 3–12 months63% (26)
▪ 1–3 years24% (10)
Prior 4 yr.
Immed. Emergency0%3%
Emergency57%73%
Non-Emergency43%24%
(21)
(304)
Issued
Description
Class AClosed8JDec 30, 2020RESET WATER CLOSET BOWL · SEWERS AND DRAINAGE§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL , IN THE BATHROOM LOCATED AT APT 8J, 8th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed13KDec 30, 2020REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE BATHROOM LOCATED AT APT 13K, 13th STORY, 4th APARTMENT FROM EAST AT SOUTH
Class AClosed3JDec 30, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 3J, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
Class AClosed3MDec 30, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3M, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed5JDec 30, 2020TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 2 SQ FT AT THE CELING IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH
Class AClosed3ADec 30, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL THE WALLS AND CEILING IN APT THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 3A, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed3MDec 30, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL AND EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3M, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed—Dec 23, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY
Class AClosed2DDec 3, 2020REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 1st ROOM FROM EAST LOCATED AT APT 2D, 2nd STORY, 5th APARTMENT FROM WEST AT NORTH
Class AClosed2DDec 3, 2020REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 2D, 2nd STORY, 5th APARTMENT FROM WEST AT NORTH
Class AClosed2DDec 3, 2020REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 2D, 2nd STORY, 5th APARTMENT FROM WEST AT NORTH
Class AClosed8ENov 25, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, NORTH WALL IN THE BATHROOM LOCATED AT APT 8E, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed8ENov 19, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM EAST AT SOUTH, THE FOYER , THE BATHROOM LOCATED AT APT 8E, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed8ENov 16, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM LOCATED AT APT 8E, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed2DJul 29, 2020REPAIR THE SOURCE AND ABATE THE WATER LEAK · WATER SUPPLY§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 5th APARTMENT FROM WEST AT NORTH
Class AClosed—Jun 24, 2020REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT BULIDING ENTRANCE DOOR , 1st STORY
Class AClosed12HMar 31, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 12H, 12th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed12HMar 31, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 12H, 12th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed8LMar 4, 2020REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT THE DOOR IN THE ENTRANCE LOCATED AT APT 8L, 8th STORY, 5th APARTMENT FROM EAST AT SOUTH
Class AClosed5EFeb 21, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE FOYER LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed5EFeb 21, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed5EFeb 21, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 2nd BATHROOM FROM EAST AT SOUTH LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed5EFeb 21, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed—Feb 5, 2020REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT CEILING, PUBLIC HALL STAIRS B , 5th STORY
Class AClosed—Feb 5, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING , 6th STORY
Class AClosed—Feb 5, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING, PUBLIC HALL STAIR B , 4th STORY
Class AClosed—Feb 5, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING,PUBLIC HALL STAIRS B AT PUBLIC HALL, 3rd STORY
Class AClosed—Feb 5, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH AND WEST WALLS, PUBLIC HALL STAIRS A , 9th STORY
Class AClosed—Feb 5, 2020REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT CEILING, PUBLIC HALL STAIRS B , 6th STORY
Class AClosed3DFeb 5, 2020TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... CEILING AND WEST WALL, APPROXIMATELY 6 SQ FT IN THE BATHROOM LOCATED AT APT 3D, 3rd STORY, 4th APARTMENT FROM WEST AT NORTH
Class AClosed—Feb 5, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING, PUBLIC HALL STAIRS B , 5th STORY
Class AClosed—Feb 5, 2020REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT CEILING, PUBLIC HALL STAIRS B AT PUBLIC HALL, 3rd STORY
Class AClosed—Feb 5, 2020REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT CEILING, PUBLIC HALL STAIRS B , 4th STORY
Class AClosed5EJan 29, 2020SECURE LOOSE MATTER · MAINTENANCE§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE CLOSET DOORS IN THE FOYER LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed5EJan 29, 2020REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE WALL LIGHT FIXTURE IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed5EJan 27, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, SOUTH WALL, EAST WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed5EJan 27, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 1st BATHROOM FROM EAST AT SOUTH LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed5EJan 27, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE FOYER LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed5EJan 23, 2020REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERATIVE LIGHT FIXTURE AT CEILING IN THE KITCHEN LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed5EJan 23, 2020REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERATIVE LIGHT FIXTURE AT NORTH WALL IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed5EJan 23, 2020REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE CLOSET DOORS AT EAST WALL IN THE FOYER LOCATED AT APT 5E, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed12HNov 27, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE PRIVATE HALLWAY , THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 12H, 12th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed7ENov 6, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 7E, 7th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed7ENov 6, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 7E, 7th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed4EOct 28, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd ROOM FROM NORTH AT WEST, THE 2nd ROOM FROM NORTH AT EAST, THE KITCHEN , THE BATHROOM , THE FOYER LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed5BOct 22, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
Class AClosed5BOct 22, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 3rd APARTMENT FROM WEST AT NORTH
Class AClosed9EOct 21, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE FOYER , THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 9E, 9th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed8EOct 21, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 8E, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed—Aug 20, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT VESTIBULE AT PUBLIC HALL, 1st STORY
Page 5 of 11
← PrevNext →