stoop
Map
LeaderboardAbout
Building SafetyHousing Conditions

180 PARKHILL AVENUE

Staten Island · ZIP 10304 · BIN 5109256 · Rosebank-Shore Acres-Park Hill · Last violation May 11, 2026 · Last complaint May 24, 2026

NeighborhoodRosebank-Shore Acres-Park Hill
More violations than 97.3% of nearby buildings
More violations than 97% of buildings and more complaints than 98% of buildings in Rosebank-Shore Acres-Park Hill. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
A steady level of activity over time
Last 2 yrs: 547 violations · 625 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
100 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous100Class Bhazardous204
Housing Preservation & Development Violations
Total violations since 1996
1,765
57 per year avg.→ Stable in the last 2 years
Open violations
373
Class C (immed. haz.)ⓘ100
Class B (hazardous)ⓘ204
Rent-impairingⓘ32
Open violation ages
▪ < 30 days1% (4)
▪ 30–90 days6% (21)
▪ 3–12 months45% (166)
▪ 1–3 years41% (151)
▪ 3+ years7% (25)
Housing Preservation & Development Complaints
Total complaints since 2003
2,073
86 per year avg.→ Stable in the last 2 years
Complaint Resolution
No access26%Violation issued19%No violation36%Phone resolved20%Other0%(2,073)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ394 violations
Water Supplyⓘ149 violations
Extermination & Rodent Eradicationⓘ142 violations
Cleaningⓘ117 violations
Egressⓘ112 violations
Paintingⓘ78 violations
Heat And Hot Waterⓘ77 violations
Artificial Lightingⓘ36 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ331 complaints
Mold & pestsⓘ275 complaints
Water & plumbingⓘ188 complaints
Bldg maintenanceⓘ176 complaints
Safety & fireⓘ108 complaints
Electricalⓘ44 complaints
Appliancesⓘ39 complaints
Outdoor / structuralⓘ1 complaints
Hide violations ↑See complaints →

Violation log

295 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt

Building safety complaints, construction, permits, and structural issues filed with the NYC Dept. of Buildings, are scored separately.

Building Safety →
See something wrong? File a complaint with 311
Prior 4 yr.
Immed. Emergency3%2%
Emergency56%61%
Non-Emergency41%37%
(305)
(982)
Issued
Description
Class AClosed3PJan 11, 2022PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 1st ROOM FROM EAST AT NORTH, THE KITCHEN LOCATED AT APT 3P, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed3FDec 15, 2021REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed4UNov 9, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE BATHROOM LOCATED AT APT 4U, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed4UNov 9, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE KITCHEN LOCATED AT APT 4U, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed4UNov 9, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE KITCHEN LOCATED AT APT 4U, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosedLBSep 10, 2021REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL TILES AT FLOOR IN THE PRIVATE HALLWAY LOCATED AT BSMT-APT LB, 2nd BSMT-APT FROM SOUTH AT WEST
Class AClosed2WMar 12, 2021REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2W, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed2WMar 12, 2021REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE FOYER LOCATED AT APT 2W, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed4UFeb 1, 2021PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 4U, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST
Class AClosed4UJan 28, 2021TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX, 2 SQ.FT. AT CEILING IN THE BATHROOM LOCATED AT APT 4U, 4th STORY
Class AClosedLBDec 22, 2020REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE PRIVATE HALLWAY LOCATED AT BSMT-APT LB, 2nd BSMT-APT FROM WEST AT NORTH
Class AClosed—Oct 20, 2020POST GAS LEAK NOTICE · POSTING/SIGNAGE§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
Class AClosed—Oct 20, 2020CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE PUBLIC HALL STAIRS AT ENTIRE BUILDING
Class AClosed5TSep 24, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 3rd ROOM FROM NORTH AT WEST, THE 3rd ROOM FROM NORTH AT EAST, THE FOYER LOCATED AT APT 5T, 15th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed5TSep 24, 2020TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... (APPROX 2 SQ FT) AT SOUTH WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 5T, 15th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed5AJul 6, 2020RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT BATHTUB IN THE BATHROOM LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed5AJul 6, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 3rd ROOM FROM NORTH, THE BATHROOM , THE 2nd ROOM FROM NORTH, THE 1st ROOM FROM NORTH AT EAST, THE FOYER LOCATED AT APT 5A, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST
Class AClosed2AJun 18, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE FOYER , THE PRIVATE HALLWAY , THE 3rd ROOM FROM NORTH AT EAST, THE 2nd ROOM FROM NORTH LOCATED AT APT 2A, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH
Class AClosed2AJun 18, 2020REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT 1ST CLOSET DOOR FROM SOUTH AT WEST IN THE PRIVATE HALLWAY LOCATED AT APT 2A, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST
Class AClosed1BMay 26, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 4th ROOM FROM EAST AT SOUTH, THE BATHROOM , THE FOYER , THE PRIVATE HALLWAY , THE KITCHEN LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed1BMay 26, 2020REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed1JMar 16, 2020TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX. 2 SQ.FT AT CEILING IN THE BATHROOM LOCATED AT APT 1J, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed2AMar 6, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH
Class AClosed1DMar 6, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST, THE 3rd ROOM FROM EAST, THE 2nd ROOM FROM EAST, THE PRIVATE HALLWAY , THE BATHROOM , THE KITCHEN LOCATED AT APT 1D, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH
Class AClosed1UMar 4, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 1U, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH
Class AClosed2CMar 4, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT NORTH
Class AClosed2WFeb 11, 2020REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 2W, 2nd STORY, APARTMENT AT NORTH , SECTION AT SOUTH
Class AClosed4JFeb 11, 2020TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT EAST WALL APPROX. 3 SQ.FT IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed4JFeb 11, 2020PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 4J, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION AT NORTH
Class AClosed3CDec 13, 2019REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed3CDec 13, 2019TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT WINDOW FRAME AT WEST WALL (APPROX. 2 SQ FT) IN THE BATHROOM LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed3CDec 13, 2019REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed3CDec 13, 2019RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE CLOSET DOOR IN THE 2nd ROOM FROM NORTH LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed3CDec 13, 2019REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING & ALL WALLS IN THE KITCHEN LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed3CDec 13, 2019REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING & NORTH WALL IN THE BATHROOM LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed—Nov 18, 2019POST GAS LEAK NOTICE · POSTING/SIGNAGE§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
Class AClosed—Nov 18, 2019IV-1. MAILBOXES PRESENT · POSTING/SIGNAGE§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR .. AT CELLAR
Class AClosed—Nov 18, 2019POST HOUSING INFORMATION GUIDE NOTICE · POSTING/SIGNAGE§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT CELLAR
Class AClosed5JAug 26, 2019REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERABLE CEILING LIGHT FIXTURE IN THE PRIVATE HALLWAY LOCATED AT APT 5J, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed5JAug 26, 2019REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AT BASE OF WALLS AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 5J, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed5JAug 26, 2019REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL AT CLOSET IN THE FOYER LOCATED AT APT 5J, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed5JAug 26, 2019REFIT DOORS ETC. · EGRESS§ 27-2005 ADM CODE REFIT CLOSET DOORS AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5J, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed1VAug 19, 2019REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING & ALL WALLS IN THE BATHROOM LOCATED AT APT 1V, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosedLJAug 5, 2019TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 4 SQ FT AT NORTH WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT BSMT-APT LJ, 2nd BSMT-APT FROM SOUTH AT WEST
Class AClosedLJAug 5, 2019TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING LOCATED AT BSMT-APT LJ, 2nd BSMT-APT FROM SOUTH AT WEST
Class AClosedLAJul 26, 2019FILE PLANS OR RESTORE · ALTERATIONS§ 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SHEETROCK PARTITION WALL ERECTED CREATING TWO ROOMS IN THE 3rd ROOM FROM NORTH LOCATED AT CELLAR APT LA, 1st CELLAR APT FROM SOUTH AT WEST
Class AClosed5HJul 23, 2019TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL (APPROX 8 SQ FT) IN THE BATHROOM LOCATED AT APT 5H, 5th STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed—Jul 23, 2019CLEANSE · CLEANING§ 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE FLOOR AT PUBLIC HALL, 5th STORY, SECTION AT NORTH
Class AOpen2CJun 20, 2019REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL GLAZE AT BATHTUB IN THE BATHROOM LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed2CJun 19, 2019REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST
Page 4 of 6
← PrevNext →