stoop
Map
LeaderboardAbout
Building SafetyHousing Conditions

140 PARK HILL AVENUE

Staten Island · ZIP 10304 · BIN 5116727 · Rosebank-Shore Acres-Park Hill · Last violation May 19, 2026 · Last complaint May 23, 2026

NeighborhoodRosebank-Shore Acres-Park Hill
More violations than 99.8% of nearby buildings
More violations than 100% of buildings and more complaints than 95% of buildings in Rosebank-Shore Acres-Park Hill. Size-normalized against residential buildings in the neighborhood for issues in the last 10 years.
ViolationsComplaints
Activity TrendsLast 5 years
More activity recently than in past years
Last 2 yrs: 1223 violations · 382 complaints
'21'26ViolationsComplaints
▼ View all activity over time
Severityⓘopen violations
176 immediately hazardous (Class C) violations still open
Class C violations include lead paint, mold, pest infestations, heat/hot water failure, and structural hazards — the most serious category.
Class Cimmediately hazardous176Class Bhazardous188
Housing Preservation & Development Violations
Total violations since 1990
2,366
64 per year avg.↑ Up 370% in the last 2 years (1,223 vs 260 prior 2 yrs)
Open violations
410
Class C (immed. haz.)ⓘ176
Class B (hazardous)ⓘ188
Rent-impairingⓘ24
Housing Preservation & Development Complaints
Total complaints since 2003
1,737
72 per year avg.↑ Up 26% in the last 2 years (382 vs 304 prior 2 yrs)
Complaint Resolution
No access25%Violation issued28%No violation32%Phone resolved15%Other1%(1,737)
Urgency breakdown
Last 12 mo.

Top violation categories

5 yrsAll time
Maintenanceⓘ566 violations
Extermination & Rodent Eradicationⓘ207 violations
Egressⓘ204 violations
Cleaningⓘ143 violations
Water Supplyⓘ142 violations
Paintingⓘ88 violations
Smoke Detecting Devicesⓘ53 violations
Carbon Monoxide Detecting Devicesⓘ53 violations
Top complaint groupsⓘ
5 yrsAll time
Heat / hot waterⓘ166 complaints
Water & plumbingⓘ157 complaints
Mold & pestsⓘ150 complaints
Bldg maintenanceⓘ142 complaints
Appliancesⓘ67 complaints
Electricalⓘ29 complaints
Safety & fireⓘ22 complaints
Elevatorⓘ18 complaints
Hide violations ↑See complaints →

Violation log

404 violations · Class A

All classesClass AClass BClass CClass IAllOpenClosed
ClassStatusApt

Building safety complaints, construction, permits, and structural issues filed with the NYC Dept. of Buildings, are scored separately.

Building Safety →
See something wrong? File a complaint with 311
Open violation ages
▪ < 30 days1% (5)
▪ 30–90 days6% (26)
▪ 3–12 months41% (168)
▪ 1–3 years25% (102)
▪ 3+ years26% (108)
Prior 4 yr.
Immed. Emergency2%3%
Emergency55%55%
Non-Emergency44%42%
(119)
(707)
Issued
Description
Class AClosed4MAug 8, 2019REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MECHANICAL STOPPER AT BATHTUB IN THE BATHROOM LOCATED AT APT 4M, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed4MAug 7, 2019RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE PLATE-COVER AT ELECTRICAL OUTLETS AT WEST, SOUTH & NORTH WALLS IN THE 1st ROOM FROM NORTH LOCATED AT APT 4M, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed4MAug 7, 2019REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 4M, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed4MAug 7, 2019RETIRED - REPLACE WITH NEW THE BROKEN AND DEFECTIVE · RETIRED§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE PLATE-COVER AT ELECTRICAL OUTETS AT EAST & SOUTH WALLS IN THE 2nd ROOM FROM NORTH LOCATED AT APT 4M, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed5EJul 15, 2019REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 1st ROOM FROM NORTH LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed5EJul 15, 2019REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed5EJul 15, 2019PROVIDE SUPPLY OF ELECTRICTY TO FIXTURES · ARTIFICIAL LIGHTING§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING IN THE FOYER LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed5EJul 15, 2019REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND SOUTH WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed5EJul 15, 2019REPAIR PLASTER · MAINTENANCE§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed5BJul 3, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE FOYER LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed5BJul 3, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM NORTH AT EAST WALL, NORTH WALL, WEST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed5BJul 3, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, NORTH WALL IN THE KITCHEN LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed5BJul 3, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, NORTH WALL IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed5BJul 3, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed5BJul 3, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed5EJul 1, 2019REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METAL WINDOW SILL AT NORTH WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed5EJul 1, 2019TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH, EAST & SOUTH WALLS (APPROX 8 SQ FT) IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed5EJul 1, 2019TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WINDOW FRAME (APPROX 2 SQ FT) IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed5EJul 1, 2019REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERABLE CEILING LIGHT FIXTURE IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed5EJul 1, 2019REPAIR · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE INOPERABLE CEILING LIGHT FIXTURE IN THE PRIVATE HALLWAY LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Class AClosed50Jun 11, 2019TRACE & REPAIR THE SOURCE & ABATE THE…MOLD · CLEANING§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING (APPROX 4 SQ FT) IN THE BATHROOM LOCATED AT APT 50, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed50Jun 11, 2019REPAIR WITH SIMILAR MATERIAL · MAINTENANCE§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT 50, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed5JJun 7, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5J, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST
Class AClosed3WMay 20, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 3W, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed3WMay 16, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS & CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 3W, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed4BApr 2, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, EAST WALL IN THE KITCHEN LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed4BApr 2, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM EAST AT SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed4BApr 2, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, SOUTH WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed4BApr 2, 2019PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed4BApr 2, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed4BApr 2, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, WEST WALL IN THE FOYER LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed4BApr 2, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE BATHROOM LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH
Class AClosed2XApr 2, 2019PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2X, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed2XApr 2, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, 1st DOOR FROM WEST AT NORTH WALL, NORTH WALL, SOUTH WALL, EAST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2X, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed2XApr 2, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE FOYER LOCATED AT APT 2X, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed2XApr 2, 2019PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2X, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed2XApr 2, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2X, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed2XApr 2, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, WEST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2X, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed2XApr 2, 2019PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2X, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed2XApr 2, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, EAST WALL IN THE KITCHEN LOCATED AT APT 2X, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed6FApr 2, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL, WEST WALL IN THE KITCHEN LOCATED AT APT 6F, 6th STORY, 1st APARTMENT FROM WEST AT NORTH
Class AClosed2XApr 2, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, SOUTH WALL, WEST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2X, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Class AClosed5WApr 2, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, SOUTH WALL, 1st WINDOW FRAME FROM SOUTH AT WEST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 5W, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed5WApr 2, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM WEST AT NORTH WALL, NORTH WALL, SOUTH WALL, EAST WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 5W, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed5WApr 2, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5W, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed5WApr 2, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE KITCHEN LOCATED AT APT 5W, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed5WApr 2, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, SOUTH WALL IN THE BATHROOM LOCATED AT APT 5W, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed5WApr 2, 2019PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5W, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed5WApr 2, 2019PAINT · PAINTING§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5W, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
Class AClosed5WApr 2, 2019PAINT METAL · PAINTING§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 5W, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST
Page 6 of 9
← PrevNext →