stoop
Map
LeaderboardAbout
Building SafetyHousing Conditions

60 WEST 142 STREET

Manhattan · ZIP 10037 · BIN 1053939 · Harlem (North) · On record since Aug 28, 1990 · Built 1959

NeighborhoodⓘHarlem (North)
About average for Harlem (North)
More complaints than 70% of residential buildings in Harlem (North) over the last 10 years. Size-normalized by building volume.
70th pct
Activity TrendsLast 5 years
Complaints have increased in the last 2 years
↑ Up 45% in the last 2 years (16 vs 11 prior 2 yrs)
1050'21'26
Complaint SeverityⓘLast 10 years
About as many serious complaints as similar buildings
125 Priority A and B complaints over 36 years — 2.8 per year on average. Size-normalized by building volume.
2.8/yr58th pct(med. 0.1/yr)fewermedianmost
Department of Buildings Complaints
Total complaints since 1990
161
3 active
Total Priority Aⓘ
32
Total Priority Bⓘ
93
No Access for Inspection (past 5 yrs)ⓘ
3%
1 complaint
Complaints over time
5 yrsAll time

First filed Aug 28, 1990. Latest: May 16, 2026.

Top complaint types
5 yrs
Complaint log
161total
Active onlyAll
DateComplaint typePriorityStatusClosedOutcome
May 16, 2026

Elevator: Multiple Devices on Property

6M

CACTIVE——
See something wrong? File a complaint with 311
All time
A — ImminentB — SeriousC — StandardD — Minor
May 5, 2026

Elevator: Multiple Devices on Property

6M

CACTIVE——
May 4, 2026

Elevator: Multiple Devices on Property

6M

CCLOSEDMay 18, 2026

No violation warranted for complaint at time of inspection

Dec 16, 2025

Boiler: Defective/Inoperative/No Permit

58

BCLOSEDFeb 4, 2026

Complaint referred to housing preservation and development (hpd)

Dec 1, 2025

Elevator: Multiple Devices on Property

6M

CCLOSEDFeb 11, 2026

No violation warranted for complaint at time of inspection

Oct 17, 2025

Boiler: Defective/Inoperative/No Permit

58

BCLOSEDNov 17, 2025

No violation warranted for complaint at time of inspection

Sep 14, 2025

Vent/Exhaust – Illegal/Improper

53

DACTIVEDec 17, 2025

Complaint assigned to boiler unit

Mar 17, 2025

Adjacent Buildings – Not Protected

03

ACLOSEDMar 17, 2025

No violation warranted for complaint at time of inspection

Mar 17, 2025

Debris – Excessive

09

BCLOSEDApr 28, 2025

No violation warranted for complaint at time of inspection

Mar 16, 2025

Work Without a Permit – Occupied Multiple Dwelling

7J

BCLOSEDMar 17, 2025

No violation warranted for complaint at time of inspection

Feb 22, 2025

Elevator: Multiple Devices on Property

6M

CCLOSEDNov 17, 2025

No violation warranted for complaint at time of inspection

Dec 5, 2024

Construction Enforcement Work Order (DOB)

1X

BCLOSEDDec 6, 2024

Compliance inspection performed

Dec 3, 2024

Building Shaking/Vibrating/Structural Stability Affected

30

ACLOSEDDec 5, 2024

Partial vacate order issued p

Dec 3, 2024

Failure to Maintain

73

CCLOSEDJan 7, 2025

No violation warranted for complaint at time of inspection

Oct 22, 2024

Sidewalk Shed/Supported Scaffold – Inadequate/Defective/None/No Permit

23

BCLOSEDOct 31, 2024

Ecb violation served

Oct 1, 2024

Sidewalk Shed/Supported Scaffold – Inadequate/Defective/None/No Permit

23

BCLOSEDOct 3, 2024

No violation warranted for complaint at time of inspection

Apr 11, 2024

Debris – Excessive

09

BCLOSEDApr 16, 2024

No violation warranted for complaint at time of inspection

Apr 5, 2024

Building Shaking/Vibrating/Structural Stability Affected

30

ACLOSEDApr 6, 2024

No violation warranted for complaint at time of inspection

Apr 3, 2024

Debris – Excessive

09

BCLOSEDApr 16, 2024

No violation warranted for complaint at time of inspection

Mar 29, 2024

2Y

2Y

CLOSEDApr 3, 2024

No violation warranted for complaint at time of inspection

Feb 7, 2024

Elevator: Multiple Devices on Property

6M

CCLOSEDApr 10, 2024

No violation warranted for complaint at time of inspection

Dec 18, 2023

Suspended (Hanging) Scaffolds – No Permit/License/Dangerous/Accident

1E

ACLOSEDDec 19, 2023

No violation warranted for complaint at time of inspection

Dec 18, 2023

Failure to Maintain

73

CCLOSEDDec 18, 2023

No violation warranted for complaint at time of inspection

Nov 6, 2023

Fence – None/Inadequate/Illegal

15

BCLOSEDNov 20, 2023

No violation warranted for complaint at time of inspection

Sep 5, 2023

Elevator: Multiple Devices on Property

6M

CCLOSEDNov 9, 2023

Ecb violation served

Jul 6, 2023

Elevator: Multiple Devices on Property

6M

CCLOSEDAug 28, 2023

No violation warranted for complaint at time of inspection

May 9, 2023

Sidewalk Shed/Supported Scaffold – Inadequate/Defective/None/No Permit

23

BCLOSEDMay 9, 2023

No violation warranted for complaint at time of inspection

May 6, 2023

Site Conditions Endangering Workers

91

ACLOSEDMay 7, 2023

No violation warranted for complaint at time of inspection

Sep 27, 2022

Elevator: Multiple Devices on Property

6M

CCLOSEDOct 26, 2022

No violation warranted for complaint at time of inspection

May 31, 2022

Sidewalk Shed/Supported Scaffold – Inadequate/Defective/None/No Permit

23

BCLOSEDMay 31, 2022

No violation warranted for complaint at time of inspection

Apr 18, 2022

Sidewalk Shed/Supported Scaffold – Inadequate/Defective/None/No Permit

23

BCLOSEDApr 18, 2022

No violation warranted for complaint at time of inspection

Jan 17, 2022

Sidewalk Shed/Supported Scaffold – Inadequate/Defective/None/No Permit

23

BCLOSEDJan 22, 2022

No violation warranted for complaint at time of inspection

Dec 9, 2021

Illegal Hotel Rooms in Residential Buildings

4A

BCLOSEDFeb 7, 2022

Inspector unable to gain access - 2nd attempt

Jan 15, 2020

Plumbing: Defective/Leaking/Not Maintained

94

CCLOSEDJan 18, 2020

Stop work order fully rescinded n

Jan 8, 2020

Illegal Hotel Rooms in Residential Buildings

4A

BCLOSEDJan 17, 2020

No violation warranted for complaint at time of inspection

Dec 12, 2018

Elevator: Multiple Devices on Property

6M

CCLOSEDFeb 1, 2019

No violation warranted for complaint at time of inspection

Sep 27, 2018

Debris – Excessive

09

BCLOSEDOct 11, 2018

Ecb violation served

Aug 8, 2018

Unlicensed/Illegal/Improper Work In-Progress

5G

BCLOSEDAug 8, 2018

Ecb violation served

Aug 3, 2018

Illegal Activity

5H

BCLOSEDAug 8, 2018

Ecb violation served

Apr 23, 2018

Elevator: Single Device on Property/No Alternate Service

6S

CCLOSEDMay 9, 2018

Please see complaint number

Apr 23, 2018

Elevator: Multiple Devices on Property

6M

CCLOSEDMay 9, 2018

Ecb violation served

Mar 14, 2018

Permit – None (Building/PA/Demo etc.)

05

BCLOSEDMay 7, 2018

Stop work order fully rescinded n

Nov 7, 2017

Debris – Excessive

09

BCLOSEDDec 13, 2017

No violation warranted for complaint at time of inspection

Apr 6, 2017

Permit – None (Building/PA/Demo etc.)

05

BCLOSEDJun 10, 2017

No violation warranted for complaint at time of inspection

Oct 26, 2016

Boiler: Defective/Inoperative/No Permit

58

BCLOSEDNov 14, 2016

Ecb violation served

Aug 25, 2015

Building Shaking/Vibrating/Structural Stability Affected

30

ACLOSEDAug 28, 2015

No violation warranted for complaint at time of inspection

Jul 2, 2015

Plumbing Work – Illegal/No Permit (also Sprinkler/Standpipe)

66

BCLOSEDJul 22, 2015

No violation warranted for complaint at time of inspection

May 29, 2015

Elevator: Defective/Inoperative

63

BCLOSEDJan 21, 2016

No violation warranted for complaint at time of inspection

Mar 26, 2015

Contrary to LL58/87 (Handicap Access)

77

CCLOSEDAug 5, 2015

No violation warranted for complaint at time of inspection

Mar 22, 2015

Egress – Locked/Blocked/Improper/No Secondary Means

37

ACLOSEDMar 23, 2015

No violation warranted for complaint at time of inspection

Page 1 of 4
Next →